Conemaugh Dam Gantry Crane Machinery Housing Roof Replacement

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W911WN26BA008
NAICS
237990
PSC
Y1QA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 8, 2026
Response due
July 30, 2026

What this opportunity is

The Department of Defense is buying roof replacement for the machinery housing of a gantry crane at Conemaugh Dam. This procurement is set aside for total small businesses. The NAICS code 237990 and PSC code Y1QA apply to this project. As a solicitation notice, small businesses should prepare to bid rather than just track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has a project to provide new steel upper machinery housings for the Gantry Crane hoists at Conemaugh Lake. Construction includes removal of existing housing to floor line, fabrication and installation of new housing (steel fabrication), removal of portions of steel diamond plate flooring and replacement with open grating, installation of floor hatches for access by personnel and access to the limit switches and replacement of electrical conduit, wiring and lighting. The upper machinery houses for the main hoists on the Gantry Cranes at Conemaugh Dam are extensively corroded and exhibit heavy loss on the housing steel (supports and steel plate cladding). The deterioration of the housing is allowing water to affect the hoist electrical and mechanical equipment. The flooring and access hatches are obsolete and allow vermin to habit within the housing which causes impacts to access the limit switches. The North American Industrial Classification Code (NAICS) is 237990 ? Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. This procurement is a 100% Small Business Set-Aside. All interested and capable Bidders are encouraged to Bid. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. All responsible Bidders are encouraged to submit a Bid. The Period of Performance (POP) is 540 Calendar Days after written Notice to Proceed (NTP). Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)