GAOA Accessible Upgrades Toilet Replacement

AGRICULTURE, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
127EAX26Q0051
NAICS
237990
PSC
Z1FB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
July 30, 2026
Place of performance
Sonora, CA

What this opportunity is

The Department of Agriculture is soliciting bids for the replacement of toilets at a location in California, under a Total Small Business Set-Aside. The NAICS code 237990 indicates that the work involves other heavy and civil engineering construction, which may suit small businesses with experience in this area. Bidders should track this solicitation, as it is a formal notice type.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Vault Toilet Accessibility Improvements Construction Specifications May 12, 2026 STANISLAUS RECREATION TOILET REPLACEMENT CONSTRUCTION SPECIFICATION INDEX DIVISION 01 - GENERAL .....................................................................................................................................1 01 10 00 - SUMMARY OF WORK ............................................................................................................... 1 01 10 10 - APPLICABLE CODES AND STANDARDS ..................................................................................... 3 01 10 30 - DEFINITIONS ............................................................................................................................ 5 01 20 00 - MEASUREMENT AND PAYMENT ............................................................................................... 8 01 30 00 – WORK SCHEDULE ................................................................................................................... 9 01 40 00 - SHOP DRAWINGS AND SUBMITTALS ...................................................................................... 10 01 50 00 – QUALITY CONTROL AND QUANTITY MEASUREMENT ........................................................... 12 01 60 00 - TEMPORARY FACILITIES AND UTILITIES ................................................................................ 14 01 70 00 - MOBILIZATION ...................................................................................................................... 16 01 80 00 - CONTRACT CLOSEOUT AND CLEANUP ................................................................................... 17 DIVISION 02 EXISTING CONDITIONS ...........................................................................................................18 02 41 10 - STRUCTURE DEMOLITION ...................................................................................................... 18 DIVISION 13 – SPECIAL CONSTRUCTION....................................................................................................20 13 40 00 - PREFABRICATED CONCRETE VAULT TOILET BUILDINGS ....................................................... 20 DIVISION 31 - EARTHWORK ............................................................................................................................30 31 20 00 - STRUCTURAL EXCAVATION AND BACKFILL .......................................................................... 30 31 31 19 - WEED AND DISEASE PREVENTION ......................................................................................... 35 DIVISION 32 – EXTERIOR IMPROVEMENTS ...............................................................................................37 32 11 00 - BASE COURSES ...................................................................................................................... 37 32 12 16 - ASPHALTIC CONCRETE PAVING AND BASE MATERIAL .......................................................... 40 -- 1 of 43 -- Vault Toilet Accessibility Improvements Construction Specifications May 12, 2026 1 DIVISION 01 - GENERAL 01 10 00 - Summary of Work PART 1 - GENERAL 1.1 LOCATION This project is located within the Stanislaus National Forest in Tuolumne, Calaveras, and Alpine Counties, California. A map of the project sites is in the Drawings. 1.2 SITE WORK This contract is for the demolition, replacement and relocation of the vault restroom facilities as well as associated accessibility site work. The work shall include cleanup and disposal of all removed building material from Forest Service lands. All work will be completed in accordance with Project Specifications and Drawings. The work includes: all labor, material, and equipment necessary to perform all the operations for the work specified. 1.3 CONSTRUCTION PHASING The recreation areas will be open to the public during construction. The Contractor will take precautions to protect Government, public and private property during construction. Work will be restricted to 7 AM to 5 PM Monday thru Friday. 1.4 GOVERNMENT FURNISHED FACILITIES (A) All temporary services use areas, and storage areas will be completely removed and the areas restored to pre-construction conditions upon completion of use. (B) Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense. 1.5 MATERIAL SOURCES All materials will be obtained from a commercial source, unless noted otherwise. 1.6 STORAGE AREAS Materials and equipment storage area will be confined to the areas identified by the Contracting Officer. 1.7 CLEAN-UP AND DISPOSAL Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste. 1.8 TRAFFIC Warning devices and barricades will be maintained in the construction area at all times and will be in conformance with the Manual on Uniform Traffic Control Devices. Safety precautions will -- 2 of 43 -- Vault Toilet Accessibility Improvements Construction Specifications May 12, 2026 2 be in accordance with the latest edition of the State of California Construction Safety orders. The Contractor will keep the project area open for administrative and emergency traffic at all times. 1.9 PRECAUTIONARY MEASURES Protection of Work: The Contractor will take precautions to protect all work during the construction period and will provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials. Safety: The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from these operations. The Contractor will erect signs and chain-link fencing barricades as necessary to make unguarded operations safe. Signs and barricades will be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials will be practiced to prevent injury to others in the ar

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)