GAOA Accessible Upgrades Toilet Replacement
AGRICULTURE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
127EAX26Q0051
NAICS
237990
PSC
Z1FB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
July 30, 2026
Place of performance
Sonora, CA
What this opportunity is
The Department of Agriculture is soliciting bids for the replacement of toilets at a location in California, under a Total Small Business Set-Aside. The NAICS code 237990 indicates that the work involves other heavy and civil engineering construction, which may suit small businesses with experience in this area. Bidders should track this solicitation, as it is a formal notice type.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Vault Toilet Accessibility Improvements
Construction Specifications May 12, 2026
STANISLAUS RECREATION TOILET REPLACEMENT CONSTRUCTION
SPECIFICATION INDEX
DIVISION 01 - GENERAL .....................................................................................................................................1
01 10 00 - SUMMARY OF WORK ............................................................................................................... 1
01 10 10 - APPLICABLE CODES AND STANDARDS ..................................................................................... 3
01 10 30 - DEFINITIONS ............................................................................................................................ 5
01 20 00 - MEASUREMENT AND PAYMENT ............................................................................................... 8
01 30 00 – WORK SCHEDULE ................................................................................................................... 9
01 40 00 - SHOP DRAWINGS AND SUBMITTALS ...................................................................................... 10
01 50 00 – QUALITY CONTROL AND QUANTITY MEASUREMENT ........................................................... 12
01 60 00 - TEMPORARY FACILITIES AND UTILITIES ................................................................................ 14
01 70 00 - MOBILIZATION ...................................................................................................................... 16
01 80 00 - CONTRACT CLOSEOUT AND CLEANUP ................................................................................... 17
DIVISION 02 EXISTING CONDITIONS ...........................................................................................................18
02 41 10 - STRUCTURE DEMOLITION ...................................................................................................... 18
DIVISION 13 – SPECIAL CONSTRUCTION....................................................................................................20
13 40 00 - PREFABRICATED CONCRETE VAULT TOILET BUILDINGS ....................................................... 20
DIVISION 31 - EARTHWORK ............................................................................................................................30
31 20 00 - STRUCTURAL EXCAVATION AND BACKFILL .......................................................................... 30
31 31 19 - WEED AND DISEASE PREVENTION ......................................................................................... 35
DIVISION 32 – EXTERIOR IMPROVEMENTS ...............................................................................................37
32 11 00 - BASE COURSES ...................................................................................................................... 37
32 12 16 - ASPHALTIC CONCRETE PAVING AND BASE MATERIAL .......................................................... 40
-- 1 of 43 --
Vault Toilet Accessibility Improvements
Construction Specifications May 12, 2026
1
DIVISION 01 - GENERAL
01 10 00 - Summary of Work
PART 1 - GENERAL
1.1 LOCATION
This project is located within the Stanislaus National Forest in Tuolumne, Calaveras, and Alpine
Counties, California. A map of the project sites is in the Drawings.
1.2 SITE WORK
This contract is for the demolition, replacement and relocation of the vault restroom facilities as
well as associated accessibility site work. The work shall include cleanup and disposal of all
removed building material from Forest Service lands.
All work will be completed in accordance with Project Specifications and Drawings. The work
includes: all labor, material, and equipment necessary to perform all the operations for the work
specified.
1.3 CONSTRUCTION PHASING
The recreation areas will be open to the public during construction. The Contractor will take
precautions to protect Government, public and private property during construction. Work will
be restricted to 7 AM to 5 PM Monday thru Friday.
1.4 GOVERNMENT FURNISHED FACILITIES
(A) All temporary services use areas, and storage areas will be completely removed and the areas
restored to pre-construction conditions upon completion of use.
(B) Transportation to and from the work site for the Contractor's personnel and materials will
be provided at the Contractor's expense.
1.5 MATERIAL SOURCES
All materials will be obtained from a commercial source, unless noted otherwise.
1.6 STORAGE AREAS
Materials and equipment storage area will be confined to the areas identified by the Contracting
Officer.
1.7 CLEAN-UP AND DISPOSAL
Disposal of waste material will be off National Forest Land and in compliance with local laws
regarding disposal of construction waste.
1.8 TRAFFIC
Warning devices and barricades will be maintained in the construction area at all times and will
be in conformance with the Manual on Uniform Traffic Control Devices. Safety precautions will
-- 2 of 43 --
Vault Toilet Accessibility Improvements
Construction Specifications May 12, 2026
2
be in accordance with the latest edition of the State of California Construction Safety orders. The
Contractor will keep the project area open for administrative and emergency traffic at all times.
1.9 PRECAUTIONARY MEASURES
Protection of Work: The Contractor will take precautions to protect all work during the
construction period and will provide and maintain adequate protection during severe weather
conditions to prevent damage to the work and the materials.
Safety: The Contractor is responsible for safeguarding employees, public, existing facilities,
and forest resources from these operations. The Contractor will erect signs and chain-link
fencing barricades as necessary to make unguarded operations safe. Signs and barricades will be
maintained at night and on weekends. Precautions such as lowering tractor blades and safely
storing materials will be practiced to prevent injury to others in the ar…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237990)
Lefferts Pond Accessibility Improvements
AGRICULTURE, DEPARTMENT OF · Solicitation · due July 6, 2026
Cedar Creek Watershed 16 & 16A Remedial Repair -NRCS Texas
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 25, 2026
Z--Friant Dam Compressor System Replacement
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 6, 2026