The Department of Defense is seeking a contractor for Integrated Solid Waste Management services at Dover Air Force Base in Delaware, specifically under NAICS code 562111. This opportunity is a Total Small Business Set-Aside, making it suitable for small businesses. The notice type is a Combined Synopsis/Solicitation, indicating that interested vendors should track the opportunity closely for submission requirements rather than simply bidding, as further details will be provided in the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CUI
CUI
PERFORMANCE WORK STATEMENT
INTEGRATED SOLID WASTE MANAGAEMENT
Dover Air Force Base, Delaware
1 October 2026
Reviewed:
_____________________________ ________________________
Quality Assurance Program Coordinator Date
Approved:
_____________________________ ________________________
Contracting Officer Date
-- 1 of 28 --
CUI
CUI
PERFORMANCE WORK STATEMENT
INTEGRATED SOLID WASTE MANAGEMENT
Dover AFB
1 October 2026
-- 2 of 28 --
3
CUI
CUI
1. Description of Services ………………………………………………………………………………..…………..……………………………..8
1.1 Collection Requirements…………………………………………………………………………………………………………………..8
1.1.1 ..Main Base………………………………………………………………………………………………………………………………..8
1.1.1.1 Municipal Solid Waste………………………………………………………………………………………………...………………..8
1.1.1.2 Food Waste………………………………………………………………………………………………………..……………………..8
1.1.1.3 Recycling……………………………………………………………………………………………………………….………….……..8
1.1.1.4 Vehicle Weighing……………………………..……………………………………………………………………………………..…..8
1.1.2 Military Family Housing (MFH) (Non-Privatized) – RESERVED…………………………………………….…………………..…..8
1.1.2.1 Municipal Solid Waste – RESERVED……………………………………………………………………………………………..…..9
1.1.2.2 Recycling – RESERVED…………………………………………………………………………………………………….…..……..9
1.1.2.3 Compostable Organics - RESERVED…………………………………………………………………………………………..……..9
1.1.2.4 Bulk Item Pickup – RESERVED………………………………………………………………………………………..……..9
1.1.3 Over and Above Requirements………………………………………………………………………………………...…..……..9
1.1.3.1 Unscheduled Pickup and Special Events…………………………………………….…………………….....…9
1.1.3.2 Construction and Demolition Debris (C&D) …………………………………………….……………………….….……..9
1.1.3.3 Public/ Common Use MSW Receptacles – RESERVED…………………………………………………………..……..9
1.1.3.4 Public/ Common Use Recycling Receptacles……………………………………………………………………...….……..9
1.1.3.5 Ash Collection – RESERVED…………………………………………………………………..……………………...………..9
1.1.3.6 Additional Pickups……………………………………………………………………………………….…………..……...……..9
1.1.3.7 Container Relocations…………………………………………………………………………………………………………….9
1.1.4 Inclement Weather Schedule………………………………………………………………………………………….....…….….9
1.1.5 Route Parameters…………………………………………………………………...…………………………….…………..….….9
1.1.6 Points of Collection…………………………………………………………………………………………….…………10
-- 3 of 28 --
4
CUI
CUI
1.1.7 Cubic Yard Capacity …………………………………………………………………………………………......10
1.1.8 Government- Approved Containers ……………………………………………………………………..…..…..10
1.1.9 Maintaining Containers and Collection Area ……………………………………………………………......…10
1.2 Recyclable Materials Processing ……………………………………………………………………………..........10
1.2.1 Materials………………………………………………………………………………………..………..………...10
1.2.2 Pickup Points………………………………………………………………………….…………………………...10
1.2.3 Base Recycling Center/Material Recovery Facility – RESERVED………………………………..…………..10
1.2.3.1 Contractor Responsibilities – RESERVED……………………………………………………….….………..10
1.2.4 Marketing – RESERVED………………………………………………………………………………..….........10
1.2.5 Sales Receipts……………………………………………………………………………………………….……..10
1.2.6 Composting [RESERVE IF COMPOSTING OPERATION ARE NOT UTILIZED.] – RESERVED……...11
1.2.6.1 Chipping/Debagging – RESERVED………….……………………………………………………………......11
1.2.6.2 Material Placement – RESERVED………….…………………………………………….……………….......11
1.2.6.3 Windrow Maintenance – RESERVED……………………………………………………………….……......11
1.2.6.4 Disposition – RESERVED………………………………………………………………………….……..……11
1.3 Disposal………………………………………………………………………………………………………...…….11
1.3.1 Off-base Disposal ………………………………………………………………………………….………..…….11
1.3.2 Disposal of Non-marketable Materials………………………………………….…………………………….....11
1.4 Equipment Maintenance………………………………………………………………………………...……….....11
1.5 Reports and Records………………………………………………………………………………………………..11
2. Service Summary……………………………………………………………………………………………..……..…..11
2.1 Quality Control………………………………………………………………………………………..…………….13
2.2 Quality Assurance………………………………………………………………………………………….……......13
-- 4 of 28 --
5
CUI
CUI
2.3 Performance Assessment…………………………………………………………………………..……………......13
2.3.1 Periodic Validations………………………………………………………………………………...……….........13
2.3.2 Unsatisfactory Performance………………………………………………………………………………….......13
2.4 Periodic Progress Meetings…………………………………………………………………………………………13
2.4.1 Meetings………………………………………………………………………………………..………..…………13
2.4.2 Meeting Minutes……………………………………………………………………………….………..………...13
3. Government Furnished Property and Services……………………………..……………………………...………...13
3.1 Recycling Center/Material Recovery Facility – RESERVED…………………………...…………..……….......14
4. General Information………………………………………………………………………………………....….……..14
4.1 Mission ……………………………………………………………………………………………...……..………...14
4.1.1 Safety Requirements and Reports ……………………………...…………………………………….…….........14
4.1.2 Flightline Safety …………………………………………………………………………………………………..14
4.1.3 Special Qualifications – RESERVED…………………………………………………………………....…...….14
4.1.4 Contracting Officer and Contracting Officer Representative (Quality Assurance Personnel) …..……...….14
4.1.5 Multi-Functional Team – RESERVED…………………………………………………………………….……14
4.1.6 Partnering Agreement ………………………………………………………………………...….……….…..….14
4.1.7 Damages to Government Buildings, Equipment, or Vegetation……………………….…………….……...…14
4.2 Background – RESERVED……………………………………………………………………………….……..…14
4.3 Hours of Operation ………………………………………………………………………………………..…......…14
4.4. Holidays & Closures…………………………………………………………………………………………..……15
4.4.1 Other Base Closures……………………………………………………………………………………..……..…15
4.5 Performance of Service During Crisis or Heightened Security……………………………….……….……....…15
4.6 Contractor Work Schedule…………………………………………………………………………...……..…...…15
-- 5 of 28 --
6
CUI
CUI
4.6.1 Schedule Submission and Approval…………………………………………………………………………...…15
4.6.2 Schedule Changes………………………………………………………………………………………..……..…15
4.7 Contract Personnel…………………………………………………………………………………………...……..15
4.7.1 Contract Manager………………………………………………………………………………………..…….…15
4.7.2 Personnel………………………………………………………………………………………………..……..…..16
4.7.3 Em…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.