What this opportunity is
The Department of Defense is seeking contractors for a Paving Indefinite Delivery/Indefinite Quantity (IDIQ) contract at Davis-Monthan Air Force Base in Arizona, classified under NAICS 237310. This opportunity is set aside for 8(a) businesses, making it suitable for small businesses participating in the 8(a) program. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
FOR
PAVING
Indefinite Delivery/Indefinite Quantity
(IDIQ) Contract
AT
DAVIS-MONTHAN AFB
ARIZONA
Revision Date: 19 March 2026
Contract Period July 2026 – June 2013
-- 1 of 121 --
Table of Contents-1
TECHNICAL PROVISIONS OF SPECIFICATIONS
Paving Indefinite Delivery/Indefinite Quantity (IDIQ) Contract
Contractor to furnish all labor, equipment, appliances, and materials and perform
all operations in connection with the Paving IDIQ Contract at Davis-Monthan
AFB, Arizona, in accordance with these specifications and standard details.
TABLE OF CONTENTS
DIVISION SECTION TITLE
1 01010 Summary of Work
2 02070 Asphalt Removal by Milling
02202 Excavation, Embankment and
Preparation of Subgrade
02220 Aggregate Base Course
02223 Excavation, Trenching, and Backfilling
for Utility Systems
02507 Bituminous Fog Seal
02580 Pavement Markings
02590 Airfield Paint Removal
02601 Bituminous Prime Coat
02602 Bituminous Tack Coat
02612 Bituminous Surface Course
02616
02617
02618
Crack Sealing in Asphalt Pavements
Removal of Rubber Deposits from
Airfield Pavement Surfaces
Removal of Paint Deposits from
Pavement Surfaces
02620 Concrete Work for Sidewalks
02621 Concrete Work for Curbs
02622 Concrete Work for Airfields
02623 Partial Depth Patching of Rigid Paving
02624 Resealing of Joints in Rigid Pavement
-- 2 of 121 --
Table of Contents-2
TABLE OF CONTENTS (con’t)
DIVISION SECTION
Drawing Details DM-C003
DM-C005
DM-C008
DM-C25A
DM-C25B
DM-C27
AFVA 31-107
N/A
TITLE
Curbing Details
Contraction Joint Detail
Utility Patch
Curb Access Ramp 6-Inch Reveal
Curb Access Ramp 8-Inch Reveal
Painted Letter
Restricted Area Warning Sign
ECP Example
-- 3 of 121 --
01010-1
SECTION 01010 – SUMMARY OF WORK
NOTE: The Davis-Monthan Air Force Base Construction Project Guidelines (February 2025)
requirements and those defined in the following section may directly affect the Contractor’s overhead for
completing the scope of work. Failure on the part of the Contractor to adequately review this section and
identify/clarify any requirements herein will not constitute justification of Contractor claims for additional
design and/or construction costs.
1. SUMMARY OF WORK
1.1 Work Included in this Contract: The following descriptions are for general reference only and shall
not be construed as a complete list of all operations to be performed. Work is expected to be
accomplished under the issuance of multiple separate and distinct task orders throughout the contract
ordering period. Perform all operations associated with street and parking lot repair to include demolition,
utility work, subgrade preparation, concrete curb, base course, asphalt surface, sidewalk, striping,
drainage, etc. per the following item descriptions:
0001AA – Mobilization and De-mobilization (Light): Transport of personnel and equipment to and
from the job site to accomplish all procedures necessary to perform the construction and/or repair of a
pavement facility, e.g. street, parking lot, etc. Included is up to a 25-mile haul distance (50-mile round
trip for mob/demob) for one piece of light (up to 3 ton) equipment (i.e. sweeper, bobcat, etc.) hauled
on a 3-ton capacity towed trailer. A quantity of one includes mobilization and de-mobilization of one
piece of equipment.
0001AB – Mobilization and De-mobilization (Medium): Transport of personnel and equipment to
and from the job site to accomplish all procedures necessary to perform the construction and/or repair
of a pavement facility, e.g. street, parking lot, etc. Included is up to a 25-mile haul distance (50-mile
round trip for mob/demob) for one piece of medium (more than 3 tons and up to 20 tons) equipment
(i.e. backhoe, loader, grader, etc.) hauled on a 20-ton capacity towed trailer. A quantity of one
includes mobilization and de-mobilization of one piece of equipment.
0001AC – Mobilization and De-mobilization (Heavy): Transport of personnel and equipment to
and from the job site to accomplish all procedures necessary to perform the construction and/or repair
of a pavement facility, e.g. street, parking lot, etc. Included is up to a 25-mile haul distance (50-mile
round trip for mob/demob) for one piece of heavy (more than 40 ton and up to 40 ton) equipment (i.e.
roller, scraper, cold plane miller, etc.) hauled on a 40-ton capacity towed trailer. A quantity of one
includes mobilization and de-mobilization of one piece of equipment.
0001AD – Mobilization and De-mobilization (Truck Mounted Crane): Transport of personnel and
equipment to and from the job site to accomplish all procedures necessary to perform the
construction and/or repair of a pavement facility, e.g. street, parking lot, etc. Included is up to a 25-
mile haul distance (50-mile round trip for mob/demob) for one truck-mounted crane up to a 75-ton
capacity. A quantity of one includes mobilization and de-mobilization of one piece of equipment.
0001AE – Cold Mill Asphalt Pavement: Cold plane asphalt pavement from 1-inch to 3-inches in
thickness. Clean the milled surface of loose debris and load into trucks for removal from site. Typical
task order will be no more than 10,000 square yards. Work includes loading milled asphalt into trucks
but does not include removal from site (hauling) nor disposal. Work will be accomplished in
accordance with Section 02070 of the Contract Specifications.
0001AF – Remove Asphalt Pavement up to 3-inches thick: Removal of asphaltic concrete
pavement by means other than cold plane milling. Work includes loading removed asphalt into trucks
but does not include removal from site (hauling) nor disposal.
0001AG – Pulverize 4-inches Asphalt Pavement, stabilize to 6-inches in-place: Pulverize asphalt
roadways and towpaths to a depth of 4-inches in place and blend with existing base. Typical task
order will be no more than 15,000 square yards. Provide Portland cement delivered and spread
evenly over pulverized area at a rate of 6 percent by volume and mix evenly to a depth of 6-inches…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237310)
HUM MALSR Demo and Replacement
TRANSPORTATION, DEPARTMENT OF · Solicitation · due July 10, 2026
Repair and Widen Taxiways Phase III, PSTE 162013
DEPT OF DEFENSE · Solicitation · due June 25, 2026
Repair Carswell Ave.
DEPT OF DEFENSE · Solicitation · due July 17, 2026
WA NP MORA 11(1), Fryingpan Creek Bridge
TRANSPORTATION, DEPARTMENT OF · Solicitation · due July 1, 2026
Fort Sam Houston National Cemetery, Phase 3 Expansion - Additional Road Repairs
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 30, 2026
Y--GOGA 244458 & FOPO 186401 Construct Bike Path at W
INTERIOR, DEPARTMENT OF THE · Solicitation · due July 17, 2026