Demolish Buildings 656, 657, & 2701 at Fort Eustis, Virginia

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
5205056FE01
NAICS
238910
PSC
P400
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 15, 2026
Response due
June 23, 2026
Place of performance
Fort Eustis, VA

What this opportunity is

The Department of Defense is seeking a contractor to provide demolition services for buildings 656, 657, and 2701 at Fort Eustis, Virginia. This opportunity is set aside for total small businesses under NAICS 238910, which covers site preparation contractors. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the opportunity closely for proposal submission details rather than simply bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 39 CUI CUI PERFORMANCE WORK STATEMENT FOR BUILDING 656, 657, & 2701 DEMOLITION SERVICES 733rd Civil Engineering Squadron Joint Base Langley Eustis, VA 23604 April 14, 2026 -- 1 of 46 -- Page 2 of 39 CUI CUI TABLE OF CONTENTS 1.0 SCOPE OF WORK 3 2.0 DESCRIPTION OF SERVICES 4 • DEMO BUILDING 656 4 • DEMO BUILDING 657 8 • DEMO BUILDING 2701 14 3.0. GENERAL INFORMATION 28 4.0. SERVICES SUMMARY 36 5.0. GOVERNMENT AND CONTRACTOR FURNISHED PROPERTY, SUPPLIES AND SERVICES 39 APPENDIX A – ACRONYMS 40 APPENDIX B – APPLICABLE PUBLICATIONS AND 43 FORMS -- 2 of 46 -- Page 3 of 39 CUI CUI 1.0 SCOPE OF WORK. The contractor shall provide all management, transportation, tools, supplies, equipment, labor, testing and supervision to perform field investigations, vehicles and equipment necessary to perform services on Joint Base Langley-Eustis (JBLE), Virginia (VA) in a manner that shall ensure continuous and reliable service. The contractor shall demolish buildings 656, 657 and 2701 on Fort Eustis, Virginia. All work shall be performed in accordance with attached drawings, specifications, and all applicable laws, regulations, standards and commercial practices as described in the performance work statement with the focus on safety and customer service. Additional work that is not listed, but may be required, to accomplish the desired results is inclusive in this project scope. 1.1 Government will provide the following items if available as courtesy which may have errors or omissions. The contractor is responsible for verifying plans, testing, and dimensions as needed. All final costs should be included in the price proposal. • As-built Record drawings • Utilities drawings • Topography Map Survey 2020 ground elevation • Most recently tested for asbestos containing materials (ACM) and lead based paint (LBP). 1.2 Government reserves the right to remove mechanical equipment and furniture prior to demolition. 1.3 All Aspect of this contract must fully comply with: • JBLE Environmental Management Plan (EMP) 4.4.6.16. • Ft. Eustis Map: Bldgs. 656, 657, and 2701. -- 3 of 46 -- Page 4 of 39 CUI CUI 2.0 DESCRIPTION OF SERVICES. The contractor shall demolish building 656, 657 & 2701. This scope of work shall include specified requirements, drawings and technical requirements set forth below. All work shall be accomplished in accordance with the specifications, site map, Contract Progress Schedule (AF 3064) and Contract Progress Report (AF 3065) and terms and conditions of the contract. BLDG 2701 MAIN GATE BLDG 656 &657 -- 4 of 46 -- Page 5 of 39 CUI CUI 2.1 DEMOLISH BUILDINGS - 656 (Asset Size: 7,438 S.F) 2.1.1 Building 656 is a semi-permanent building that exceeded its service life and is inefficient to maintain. The project requires removal of building 656 and all associated systems to include not limited to: any above ground piping and any storage sheds. Sidewalks, trees, gazebos, signs, and concrete sections to be removed will be identified during the pre-bid site visit. 2.1.2 Install a temporary chain link fence and around the entire area of work site. Fence footprint shall encompass entire facility. 2.1.3 The contractor is responsible for the removal and disposal of the building structure as well as all contents including, but not limited to all furnishings, trash, fixtures, appliances, electrical systems, chimneys, complete foundations, footers, bollards, and building structure. Demo pipe/pipe supports. Demo sidewalk & Driveway DO NO T d emo sidewalk Demo Bldg 6 56 -- 5 of 46 -- Page 6 of 39 CUI CUI 2.1.4 IAW JBLE’s hazardous waste disposal policy, contractor is responsible for removal of all smoke alarms, fluorescent lights, batteries, thermostats and any other hazardous materials. Any hazardous materials shall be taken to building 1208 (Hazardous Waste Accumulation Facility) for disposal prior to demolition. 2.1.5 Bldg. 656 was constructed in 1949. The Government has not tested for asbestos containing materials (ACM) and lead based paint (LBP); however, upon entering the building environmental toxins were present. Due to the current conditions of the building, abatement is required. If any additional testing is required, the cost should be included in the contractor’s proposal. A full destructive sample is permitted at the pre- bid site visit. 2.1.6 Contractor is responsible for evacuating and recycling refrigerants from all mechanical equipment prior to demolition. 2.1.7 Dust resulting from demolition shall always be controlled. 2.1.8 The contractor shall not allow demolition debris to accumulate at the work site. 2.1.9 The utilities to Building 656 (Gas, Electric, Water, Sewer, Fiber optics etc.) will be disconnected and removed (by others) prior to demolition. Contractor shall attend all coordination meetings with the Utility Service Providers. 2.1.10 In accordance with sound environmental principles and EMP 4.4.6.16, the contractor shall salvage or recycle as much steel, copper, aluminum, glass and lumber as possible. Weight tickets for all recycled material and material going to the landfill must be turned in to the CES PM within 14 days of recycling. 2.1.11 Remove and dispose of all foundations, footings complete, and concrete sections identified during the pre-bid site visit. 2.1.12 Repair ALL asphalt and concrete paving damaged by contractor operations. Backfill area of excavation as necessary to establish elevation matching that of surrounding area. Conduct soil compression test prior to placing asphalt or concrete paving. 2.1.13 See Government provided the topography map survey 2020 ground elevations around Bldg.656. 2.1.14 After demolition, Contractor shall thoroughly clean all sites of debris and grade all disturbed soil to implement positive drainage. -- 6 of 46 -- Page 7 of 39 CUI CUI 2.1.15 Photo(s): Building 656. Do NOT demolish CMU wall that separates both buildings . Demo ALL pipe that runs through 656. Cap off at 655. -- 7 of

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238910)