Dock-Side (DS): USCGC HEALY (WAGB 20) Fiscal Year 2027
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z08526RLREP0010
NAICS
336611
PSC
J999
Set-aside
Small Business Set Aside - Total
Posted
August 25, 2026
Response due
September 1, 2026
Place of performance
Seattle, WA
Description
USCGC HEALY (WAGB 20)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2027
Compiled By: Tristan J Hustrulid
(Rev-0, 11 June 2026)
-- 1 of 381 --
USCGC HEALY (WAGB-420) DOCKSIDE AVAILABILITY FY2027
ii (Rev-0)
TABLE OF CONTENTS
REVISIONS RECORD ..............................................................................................................................iv
CONSOLIDATED LIST OF REFERENCES .......................................................................................... v
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY ...................................... xv
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS .........................................................xix
PRINCIPAL CHARACTERISTICS ....................................................................................................... xx
General Requirements ................................................................................................................................... 1
WORK ITEM 1: Fire Prevention, Provide .................................................................................................. 14
WORK ITEM 2: Temporary Services, Provide - Cutter ............................................................................. 17
WORK ITEM 3: Tenting, Provide (Optional)............................................................................................. 21
WORK ITEM 4: Sea Trial Performance, Support, Provide ........................................................................ 25
WORK ITEM 5: Recapitalize Science Data Network Infrastructure (SLEP) ............................................. 29
WORK ITEM 6: Recapitalize CGOne Network Infrastructure (SLEP) ..................................................... 34
WORK ITEM 7: Recapitalize Ice Radar (SLEP) ........................................................................................ 38
WORK ITEM 8: Impressed Current Cathodic Protection, Upgrade ........................................................... 43
WORK ITEM 9: Oceanographic Winch, Inspect and Test ......................................................................... 49
WORK ITEM 10: Scientific and Ocean Engineering Systems, Control System Groom and Indicator
Calibration ............................................................................................................................... 53
WORK ITEM 11: Damage Control and Firefighting Systems, PMS ......................................................... 57
WORK ITEM 12: Oily Water Separator, Annual Maintenance.................................................................. 91
WORK ITEM 13: Auxiliary Seawater System (ASW) Orifice Plate, Renew............................................. 94
WORK ITEM 14: Aux Diesel Generator Starter (SLEP) ........................................................................... 99
WORK ITEM 15: Boiler Tube Sheet and Gauge Glass, Replace (SLEP) ................................................ 108
WORK ITEM 16: Steam Coil Pre-Heaters, Inspect and Test ................................................................... 115
WORK ITEM 17: Refrigeration Plant, Maintain ...................................................................................... 120
WORK ITEM 18: Boiler, Annual Maintenance ........................................................................................ 124
WORK ITEM 19: Bow Crane, Biennial Inspect and Test ........................................................................ 133
WORK ITEM 20: Internal Hoists, Maintenance, Inspection and Test...................................................... 141
WORK ITEM 21: Grey Water Holding Tank(s), Clean and Inspect ........................................................ 145
WORK ITEM 22: Sewage Piping, Clean and Flush ................................................................................. 150
WORK ITEM 23: Sewage Holding Tank(s), Clean and Inspect............................................................... 154
WORK ITEM 24: Main Motor Lube Oil Tank Heater, Inspect ................................................................ 159
WORK ITEM 25: Ship Service Air Compressor, Overhaul ..................................................................... 163
WORK ITEM 26: Flex Hose Assemblies, Renew .................................................................................... 169
WORK ITEM 27: Fuel Oil Purifier (FOP) Overhaul ................................................................................ 177
WORK ITEM 28: Lube Oil Purifier (LOP) Overhaul............................................................................... 184
WORK ITEM 29: Relocate Cycloconverter Strainers (SLEP) ................................................................. 192
WORK ITEM 30: Recapitalize MSW & ASW Valves (SLEP) ................................................................ 197
WORK ITEM 31: Science Sea Water Strainer (SLEP)............................................................................. 206
WORK ITEM 32: A-Frames, Inspect and Repair ..................................................................................... 211
WORK ITEM 33: Science Van Monorail System, Overhaul.................................................................... 218
WORK ITEM 34: Steam Trap, Renew ..................................................................................................... 225
WORK ITEM 35: Steam Trap, Replace .................................................................................................... 232
WORK ITEM 36: Distilling Plant Condensate Dump Valves, Replace ................................................... 236
WORK ITEM 37: Anchor Windlass, Inspect and Repair ......................................................................... 241
WORK ITEM 38: Mooring Capstan, Level 2 Overhaul ........................................................................... 246
WORK ITEM 39: Port & Starboard Miranda Davit, Biennial Inspect and Repair ...…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 336611)
USCGC OLIVER HENRY UPDS FY26 QL4
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 2, 2026
Duplex Strainer
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 31, 2026
SBRF Crane Load Moment Indicator System
TRANSPORTATION, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 4, 2026
HPACs AERP, Remove, Re-install, & Operational Testing
DEPT OF DEFENSE · Sources Sought · due September 28, 2026