SBRF Crane Load Moment Indicator System

TRANSPORTATION, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
6991PE26Q000009
NAICS
336611
PSC
J019
Set-aside
Small Business Set Aside - Total
Posted
August 25, 2026
Response due
September 4, 2026
Place of performance
Benicia, CA

What this opportunity is

The Department of Transportation is seeking a contractor to replace the Appleton Marine Crane Load Moment Indicator System for the Maritime Administration. This opportunity is set aside for small businesses, making it suitable for companies within the NAICS code 336611. The notice type is a Combined Synopsis/Solicitation, indicating that interested vendors should prepare to respond with proposals rather than just track the opportunity. The work will take place in California and must adhere to various regulatory standards.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SOW Page 1 DESCRIPTION/SPECIFICATIONS/WORK STATEMENT GENERAL INFORMATION Appleton Marine Crane Load Moment Indicator (LMI ) Replacement 1. The subject crane is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). 2. The contractor shall provide all labor, material, and equipment necessary to make all removals and restorations; remove and replace interferences; rig and unrig; make all removals and subsequent installation to accomplish the work specified herein. All work shall be in compliance with the latest Regulatory Body requirements. The term, “Regulatory Bodies” includes the American Bureau of Shipping (ABS), United States Coast Guard (USCG), United States Public Health Service, the Department of Labor (DOL) Occupational Safety and Health Administration (OSHA), and the Institute of Electrical and Electronic Engineers as applicable. 3. If, in the performance of any work required in these Specifications, it becomes necessary to remove or disturb any structural part of the crane or vessel upon which the crane is installed, the contractor shall, upon completion of that work, reinstall or renew if necessary, any affected structural part and restore to original conditions of durability, appearance, and seaworthiness. All temporary removals in the way of the work are to be replaced in good order. 4. All work specified shall be accomplished and completed in conformity with the highest standards of maritime practices. All items contained in these Specifications must be proved to the satisfaction of the Contracting Officer’s Representative (COR). 5. The terms “Replace” or “Renew” mean to remove the existing unit, equipment, or systems, including all interferences and to install a new unit, equipment or system which is either identical to or equal to that which was removed; the installation shall include at a minimum all hook-up, supports, and adapters which are required to effect a fully operational installation complete in all respects. 6. Any repairs or other work resulting from recommendations or other discoveries during the course of completing this work are to be brought to the attention of the COR immediately by use of a contractor generated inspection report. Any such additional work will be subject to a delivery order. Additional work to be accomplished ONLY WHEN AUTHORIZED IN WRITING WITHIN THE LIMITED DELGATION OF THE COR OR BY THE CONTRACTING OFFICER. 7. The contractor shall gas-free or inert all spaces affected by the work described in this Specification and is responsible for determining all spaces requiring gas freeing. All safety precautions contained in the United States Department of Labor Safety and -- 1 of 4 -- SOW Page 2 Health Regulations for Ship Repairing, Title 29 CFR Parts 1501.10, 1501.11, 1501.12, 1501.14, and 1501.15 must be strictly observed. A copy of the gas-free certificate is to be presented to the COR before beginning work on the repairs. Initial Certificates are to be issued by a Certified Chemist, as will recertification if conditions change which will affect the Certificate. Gas-Free Certificates shall be updated daily by competent persons. 8. All welding shall meet ABS and USCG requirements and conform to American Welding Society (AWS) standards. All welds shall be cleaned prior to painting. All surfaces which have been cut, drilled, welded, or otherwise modified shall be cleaned, free of grease, slag and foreign matter; and painted in accordance with the coating sections of these Specifications. Prior to any surface preparations the contractor will conduct a joint inspection of the welding repairs with the COR. 9. All dirt and debris resulting from the work required by these Specifications shall be removed from the vessel and disposed of at contractor’s expense. All affected areas shall be left clean and in good order at the end of the installation and testing. 10. Contractor shall follow Original Equipment Manufacturer (OEM) installation instructions and direction for all new equipment and hardware installed during the execution of this work package. 11. Other than making the crane and vessel available, the Government is not providing any material or equipment for this project. 12. To the maximum extent possible and consistent with the Federal Acquisition Regulations Part 23, the Government requires during the performance of the work under this Statement of Work (SOW) the Contractor to provide or use products that are: energy efficient (ENERGY STAR® or Federal Energy Management Program (FEMA)-designated); water-efficient; biobased; environmentally preferable (e.g., EPEAT-registered, or non-toxic or less toxic alternatives); non-ozone depleting; or made with recovered materials. Unless otherwise identified in this SOW, each recovered materials or biobased product provided and delivered must meet, but may exceed, the minimum recovered materials or biobased content of an EPA- or USDA- designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be: (1) delivered to the Government during contract performance; (2) acquired by the contractor for use in performing services (including construction) at a Federally-controlled facility; (3) furnished by the contractor for use by the Government; or (4) specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.” 13. The Appleton Marine Crane is mounted aboard SBRF’s self-propelled crane barge FS-65 MARY ANN. The crane’s particulars are: Model Number: EB190-80-40 Serial Number: 11213 -- 2 of 4 -- SOW Page 3 Year installed: 1999 Last Overhauled: 2025 14. Place of Performance: The FS-65 MARY ANN is located at Suisun Bay Reserve Fleet (SBRF), 2595 Lake Herman Road, Benicia, CA 94510. Because the craft is not considered deep-sea worthy, all work must be performed on the vessel in the San Francisco Bay

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336611)