Description
STATEMENT OF WORK (SOW)
70Z03826QB0000147
Amendment 02
Page 1 of 5
Contractor Requirement
1. This requirement is for the service of the items listed in the following table utilized on the
United States Coast Guard (USCG) Fleet Units and Cutters in support of the MH-65
helicopter as listed below. Upon receipt of the samples, the Contractor shall perform a test
and evaluation to determine the condition of the samples.
Description Quantity
Water Sample
Testing
100
2. This requirement shall conduct water sample testing in accordance with Section 303 of the
Clean Water Act and USCG testing standards. Samples shall be collected from USCG units
listed below. Quotes should include costs for packaging, shipping, water testing, wash water
testing containers, sample collection instructions, and chain of custody.
Due to the volume of cutters within the USCG fleet, a definitive need of water samples
cannot be determined. However, the units listed below have been approved for water
sample testing along with any cutter requesting water sample testing.
Any USCG Cutter requesting a water sample test, must receive the tracking number as
soon as the container has been issued to the cutter. A shipping method without tracking
shall not be used for the cutters.
List of USCG Units
USCG Aviation Training Center CGAS Atlantic City
8501 Tanner Williams Road FAA Technical Training Center, Bldg 350
Mobile, AL 36608-9682 Egg Harbor Township, NJ 08234-9393
Email: Email:
CGAS Detroit CGAS Miami
c/o Selfridge ANB 15000 NW 42nd Ave
Mt. Clemons, MI 48045-5011 Opa Locka, FL 33054-2397
Email: Email:
CGAS San Francisco CGAS Savannah, GA
SFO International Airport Bldg 1020 1297 N. Lightning Road Bldg. 830 HAAF
San Francisco, CA 94128-3099 Savannah, GA 31409-5053
Email: Email:
USCG AIRFAC Newport USCG AIRFAC Waukegon
c/o CGAS North Bend c/o CGAS Detroit
2000 Connecticut Ave c/o Selfridge ANGB
North Bend, OR 97459-2399 Mt. Clemons, MI 438045-5011
Email: Email:
-- 1 of 5 --
STATEMENT OF WORK (SOW)
70Z03826QB0000147
Amendment 02
Page 2 of 5
USCG AIRFAC Muskegon USCG AIRFAC Charleston
c/o CGAS Detroit c/o CGAS Savannah
c/o Selfridge ANGB Hunter AAF Post Office
Mt. Clemons, MI 48045-5011 Savannah, GA 31409-5053
Email: Email:
CGAS Houston CGAS Barbers Point
1178 Ellington Field 1 Coral Sea Rd.
Houston, TX 77034-5569 Kapolei, HI 96707-3693
Email: Email:
CGAS Humboldt Bay CGAS North Bend
Mckinleyville, CA 95521-5000 2000 Connecticut Ave
Email: North Bend, OR 97459-2399
Email:
CGAS Corpus Christi USCG HITRON
8930 Ocean Drive Cecil Field, Hangar 13
Corpus Christi, TX 78419-5220 13520 Aerospace Way
Email: Jacksonville, FL 32215
Email:
CGAS Port Angeles
1 Ediz Hook Road
Port Angeles, WA 98362-0159
Email:
3. The contractor shall provide aspect, potential hydrogen (pH), conductivity, dissolved solids,
and ash reports to the USCG/ALC. The Contractor shall provide the wash water sample
report within (7) days after receipt of the wash water samples. Reports shall be electronically
emailed and mailed to ALL of the following:
AVI3 Jonathan Shockley
SRR Technical Services Representative
1664 Weeksville Road, Hangar 75
Elizabeth City, NC 27909
Email:
*Remainder of this page is intentionally left blank*
-- 2 of 5 --
STATEMENT OF WORK (SOW)
70Z03826QB0000147
Amendment 02
Page 3 of 5
4. Water sampling under this contract should be performed at the Contractor’s facility. Testing
conducted outside the contractor’s facilities will be considered by the USCG provided all
other requirements listed in this statement of work can be met. The contractor shall provide
all necessary parts, materials, labor, tooling, and test equipment to evaluate the components
listed in the task order at the firm fixed prices listed in the schedule. Any deviations to the
inspection criteria or schedule must be approved by the USCG.
5. The contractor must have access to required documentation, repair specifications and/or/to
test acceptance criteria and any other required data to ensure all components are tested and
repaired IAW the OEM’s current specifications and procedures. The USCG may review
documentation and performance test/acceptance criteria as required.
6. The Contractor shall, immediately upon discovery, notify and disclose conditions to the
Contracting Officer of any event, supply change, material change, supply malfunction,
counterfeit/suspect parts or material, discovery of defect found could potentially cause a non-
conformity to the original specifications of this contract. The Government reserves the right
to inspect any non-conforming product of component. Therefore, the Contractor shall obtain
approval from the Contracting Officer prior to the disposition of any non-conforming product
or component.
7. The Contractor’s quality control manual shall address in detail the contractor’s risk
management, test, inspection, non-conforming product and counterfeit /suspect parts process.
8. Upon notification of the change, the Contracting Officer will approve or deny the change.
Facility location changes may require the Government to perform a facility inspection. The
contractor shall allow the Government access to all applicable areas of the contractor’s
facilities to ensure compliance with contractual requirements. In the event that the
Contracting Officer does not approve the change, the task order may be cancelled or
terminated in accordance with FAR.
9. Unless otherwise specified, the Contractor shall flow down all requirements in this contract
to their supply chain, to include all subcontractors and suppliers.
10. The contractor shall provide aspect, potential hydrogen (pH), conductivity, dissolved solids,
and ash testing and reports to the USCG/ALC. Reports shall be electronically mailed and
mailed to the following: (Listed above, List of USCG Units)
*Remainder of this page is intentionally left blank*
-- 3 of 5 --
STATEMENT OF WORK (SOW)
70Z03826QB0000147
Amendment 02
Page 4 of 5
Task Order Requirements
1. The following ta…
Source: SAM.gov, as posted. Verify the current solicitation before responding.