FCC Yazoo City - Air Cooled Condensors Replacement

JUSTICE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
23Z3AJ2
NAICS
238220
PSC
4120
Posted
June 9, 2026
Response due
June 22, 2026
Place of performance
Yazoo City, MS

What this opportunity is

The Department of Justice is seeking a contractor to replace the existing geothermal system with air-cooled condensers at the Federal Correctional Complex in Yazoo City, Mississippi. This opportunity falls under NAICS code 238220 and is suitable for small businesses specializing in HVAC installation and maintenance. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the opportunity closely for further details rather than submit immediate bids.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

US DEPARTMENT OF JUSTICE Federal Bureau of Prisons FCC Yazoo City, MS STATEMENT OF WORK 23Z3AJ2 – Install Air-Cooled Condensers Camp Core and Education FCC Yazoo City, Mississippi 05-12-2026 A. SUMMARY OF WORK & PLACE OF PERFORMANCE The Federal Bureau of Prisons (FBOP), Federal Correctional Complex (FCC), Yazoo City (YAZ), Federal Prison Camp (FPC) located at 2225 Haley Barbour Parkway, Yazoo City, MS. intends to make a single award to a responsible entity to replace the aging and non- functioning Geothermal System. The new System will utilize Air-Cooled Condensers for the Camp Core and Education locations. The Contractor shall provide all the necessary equipment, materials, incidentals, etc. and labor to install the new Air-Cooled Condensers at the FPC as described in this Statement of Work below. The Contractor shall cap and abandon the original Geothermal System in place. All materials and craftsmanship shall comply with Federal, state, and local regulations, environmental best practices and regulations, codes, and standards as well as industry standards for a correctional setting. B. SCOPE OF WORK The Contractor shall provide all materials and labor for the installation of air-cooled condenser units for the approximately 15,500 sq. ft. Camp Core and Education Buildings. The contractor shall be responsible for providing three of the following specific systems or mechanically similar: • Unit Casing: Direct Coil Air-Cooled Condensers to be fabricated with 16-gauge Galvanized Steel with structural members made from 14 or 12 gauge as required for maximum support. • The mounting design shall be easy to ship, fast for rigging and installation. • Fan Motor assembly: All fans operate in fully baffled sections to provide efficient heat transfer and prevent wind milling. This unit is provided with 2.00 fans; each consists of a 550 RPM 800 mm diameter High Efficiency unit such as ZIEHL-ABEGG AC Fan motor (or technically equivalent). • Fans shall be the “sickle blade” type to ensure quiet operation. The motor type must enable the fan to produce a sound pressure level of 46 dBA at 10m, maximum. • Motors to have Thermal Overload Protector, plus moisture and hot climate protection. • Motors to be rated for 460 Main Power. Coil: High heat transfer Tube & Fin coils of generous face area with tubes mechanically expanded into self-spacing fin collars for maximum heat transfer. • All coils should have a maximum operating pressure of 600 psig. Coils to be factory leak tested at 600 psig with dry air and sealed prior to shipment. Type L or K copper headers -- 1 of 4 -- US DEPARTMENT OF JUSTICE Federal Bureau of Prisons FCC Yazoo City, MS are used for inlets and outlets with ODF solder copper connections for field connections. • Controls: The unit is designed for a single point electrical entry with the Control Panel mounted on the return bend end. Unit mounted complete with Pressure Fan Cycling with Dual Circuits. The contractor will also be responsible for pouring concrete equipment pad for the system as well will be responsible for core drill building wall for refrigeration piping and electrical. The contractor will also be needed to connect electrical and refrigerant piping between the indoor and outdoor units as well as insulate all refrigerant piping. The Contractor will also evacuate per manufacturer specifications. As well the Contractor will be responsible to charge units with the required refrigerant and to provide and install all necessary BAS/unit controls. The Contractor will be responsible to provide factory startup/commissioning for the start up for the new system. C. EQUIPMENT / SUPPLIES The contractor shall provide all labor, materials, drawings, services, supervision, tools, apparatus, conveyance, equipment, scaffolding, transportation, and incidental expenses to Install Air Cooled Condensers for Camp Core and Education Buildings for the FCC Yazoo City FPC. The Contractor will be responsible for any materials and supplies necessary to provide the completion of the above-mentioned work. The Contractor will be responsible for delivery of the materials, components and accessories to the site and of the acceptance of the deliveries. The storage of such deliveries will be coordinated with the COR prior to deliveries being scheduled. D. GOVERNMENT PROVIDED MATERIALS FCC Yazoo City FPC will make sure the area will be sectioned off and clear of any unnecessary items to make removal and installation as easy as possible. The Contractor will have full access to the project area for the duration of the project to expedite completion. FPC Yazoo will provide electricity (120V) for battery chargers and small hand tools. Potable water and restroom facilities will be available for the contractor at no charge. E. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS The installation will be monitored by a representative of the Facilities Department. Related work in this statement of work includes, but is not limited to, project data submission and testing necessary to ensure compliance with all applicable local, state and national codes and laws. The contractor will observe all safety regulations (i.e. OSHA) and Government security regulations. Minor material and work not specified or shown, but necessary for the completion of this project, shall be provided, without additional compensation from the Government. -- 2 of 4 -- US DEPARTMENT OF JUSTICE Federal Bureau of Prisons FCC Yazoo City, MS The performance of these services will also be verified by the Contracting Officer’s Representative (COR) for this project. The Bureau of Prisons reserves the right to suspend, limit or revoke the Contractor’s privileges at the Bureau of Prison facility due to violations of FBOP security procedures. F. WORKING REGULATIONS All Contractor’s personnel must adhere to the following rules and regulations when performing work at FPC Yazoo: • All Contractors and Subcontractors will provide a check list of all employees on s

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238220)