N--George Washington Birthplace National Monument- RE
INTERIOR, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
140P4326R0013
NAICS
238220
PSC
N045
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 19, 2026
Response due
June 26, 2026
Place of performance
Colonial Beach, VA
What this opportunity is
The Department of the Interior is soliciting a Service-Disabled Veteran-Owned Small Business (SDVOSB) for the renovation of a facility at the George Washington Birthplace National Monument in Virginia. The NAICS code 238220 indicates that the primary work involves general building contractors. The PSC code N045 suggests the acquisition involves construction services. Bidders should track the solicitation for updates and submission instructions.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
GEORGE WASHINGTON
BIRTHPLACE
NATIONAL MONUMENT
1732 Popes Creek Road
Colonial Beach, VA 22443
Upgrade HVAC System at
Memorial House Museum
PMIS No.: 305342
February 9, 2026
National Park Service
U.S. Department of the Interior
Northeast Region
PROJECT MANUAL
-- 1 of 463 --
Upgrade HVAC System
George Washingtons Birthplace National Monument PMIS # 305342
February 2026 PROJECT MANUAL COVER 00 01 00 - Page 2 of 2
FRONT COVER:
George Washington Birthplace National Monument
Mailing Address:
George Washington Birthplace National Monument
1732 Popes Creek Road
Colonial Beach, VA 22443
To review general information about
George Washingtons Birthplace National Monument
please visit:
www.NPS.gov/GEWA
-- 2 of 463 --
Upgrade HVAC System
George Washington Birthplace National Monument PMIS # 305342
February 2026 TABLE OF CONTENTS 00 00 01 - Page 1 of 2
TABLE OF CONTENTS
01 00 00 GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 26 01 CONTRACT MODIFICATION PROCEDURES
01 27 00 DEFINITION OF CONTRACT LINE ITEMS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 16 CONSTRUCTION SCHEDULE
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 13.22 ARCHEOLOGICAL PROTECTION
01 35 23 SAFETY REQUIREMENTS
01 35 91 HISTORIC PRESERVATION TREATMENT PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 42 00 REGERENCE STANDARDS
01 67 00 PRODUCT REQUIREMENTS
01 73 29 CUTTING AND PATCHING
01 73 40 EXECUTION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 79 00 DEMONSTRATION & TRAINING
02 41 19 SELECTIVE DEMOLITION
03 10 00 FORMWORK
03 30 00 CAST-IN-PLACE CONCRETE
23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING-EXISTING SYSTEMS
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 14 VARIABLE-FREQUENCY CONTROLLERS
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 MECHANICAL INSULATION
23 08 00 COMMISSIONING OF HVAC
23 09 00 HVAC INSTRUMENTATION AND CONTROLS
23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23 21 00 HYDRONIC PIPING DISTRIBUTION SYSTEMS
23 21 13.13 UNDERGROUND HYDRONIC PIPING
23 25 00 HVAC WATER TREATMENT
23 31 13 AIR DISTRIBUTION SYSTEMS-METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 52 23 CAST-IRON BOILERS
23 65 00 COOLING TOWERS
-- 3 of 463 --
Upgrade HVAC System
George Washington Birthplace National Monument PMIS # 305342
February 2026 TABLE OF CONTENTS 00 00 01 - Page 2 of 2
23 81 46.13 WATER-TO-AIR HEAT PUMPS
26 00 10 GENERAL ELECTRICAL PROVISIONS
26 05 19 LOW-VOLTAGE ELECTICAL POWER CONDUCTORS AND CABLES
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 28 16 ENCLOSE SWITCHES AND CIRCUIT BREAKERS
31 00 00 EARTHWORK
32 11 00 BASE COURSE
32 13 13 CONCRETE PAVING
32 31 13 CHAIN LINK FENCES AND GATES
32 92 00 SEEDING, FERTILIZING, MULCHING
32 92 05 TOPSOIL
33 44 13 STORM UTILITY DRAINS
-- 4 of 463 --
Upgrade HVAC System
George Washington Birthplace National Monument PMIS # 305342
February 2026 GENERAL REQUIREMENTS 01 00 00 -Page 1 of 7
SECTION 01 00 00 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 INTENT AND ARRANGEMENT OF DOCUMENTS
A. The specifications and drawings are intended to include everything necessary to perform the
entire work properly. Every item necessarily required may not be specifically mentioned or
shown. Unless expressly stated, all systems and equipment shall be complete and operable.
B. Titles and headings to divisions, sections and paragraphs in these contract documents are
introduced for convenience and shall not be taken as a correct or complete segregation of the
several units of materials and labor. No responsibility either direct or implied is assumed by the
government for omissions or duplications by the contractor or the contractor's lower-tier
contractors, due to real or alleged error in arrangement of matter in the subcontract documents.
C. The terms of the contract, general provisions, and general requirements apply to each division
of these specifications as fully as if repeated within that division.
D. Items listed under scope of work for each division of the specifications are not necessarily all
inclusive. The contractor shall be responsible for the complete job.
E. Portions of these specifications are of the abbreviated, simplified type and may include
incomplete sentences.
1. Omissions of words or phrases such as: the contractor shall, in conformity with, shall be,
as noted on the drawings, in accordance with details, a, the, and all are intentional.
Omitted words or phrases shall be supplied by inference in the same manner as they are
when a note occurs on the drawings.
2. Such terms as: approved, reviewed, equal, as directed, as required, as permitted,
acceptable, and satisfactory mean by or to the government.
1.2 DEFINITIONS AND STATUS OF INDIVIDUALS
A. The terms defined in the contract, general conditions, and general provisions shall apply
throughout. Certain additional terms and refinements shall apply as specified below.
B. Owner: the term “Owner” or “government” shall mean the United State Government,
Department of the Interior, National Park Service.
C. Government: the term “government” shall mean the person duly authorized by the Owner to act
as the Contracting Officer; and person or persons duly authorized by the Contracting Officer.
D. Contracting Officer (CO) shall mean the official Government Representative for the Project.
The CO shall be assigned by the Government and made known to the Contractor at the time of
Award. The CO's contact information shall be issued at that time.
1. The designation of Contracting Officer (CO) may include:
a. Contracting Officer's Representative (COR).
b. Any other designated person as selected by the Government.
2. Lines of communication between the Government, the CO and the Contractor will be
covered at the Preco…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
Installation of an Engineered Fire Suppression System
DEPT OF DEFENSE · Solicitation · due June 25, 2026
RFQ - RFQ - 19ZA6026Q0004 - FAC NEC CHILLER MAINTENANCE- FAC NEC CHILLER MAINTENANCE
STATE, DEPARTMENT OF · Solicitation · due July 20, 2026
J045--High Pressure Steam Piping Replacement
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 6, 2026
1698- CE Chiller Maintenance/Service Recompete
DEPT OF DEFENSE · Solicitation · due June 22, 2026
15B20126Q00000011- USP ALLENWOOD COMM SHOP AC DESIGN AND SUPPLY
JUSTICE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 22, 2026
J045--Boiler Tuning Services at the Chalmers P Wylie VA Ambulatory Care Center (VAAC)
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due June 26, 2026