Z--Friant Dam Compressor System Replacement

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140R2026B0002
NAICS
237990
PSC
Z1KA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 23, 2026
Response due
August 6, 2026

What this opportunity is

The Department of the Interior is seeking a contractor for the replacement of the Obermeyer Crest Gates Compressor System at Friant Dam, part of the Central Valley Project in California. This project is set aside for total small businesses under FAR 19.5, making it suitable for small contractors with relevant experience in construction and mechanical systems. Interested businesses should note that this is a solicitation notice, indicating they should prepare to submit bids rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Table of Contents 00 01 10 - 1 SECTION C - DESCRIPTION / SPECIFICATIONS TABLE OF CONTENTS DIVISION 01 – GENERAL REQUIREMENTS 01 11 00 Summary of Work 01 12 10 Other Contracts 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 20 Reservoir Operations 01 14 30 Interruption of Service 01 31 22 Coordination Meetings 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 35 50 Site Security 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 79 20 Training 01 91 13 Commissioning and Testing DIVISION 02 – EXISTING CONDITIONS 02 83 33 Disposal of Equipment with Coatings Containing Hazardous Materials 02 87 20 Removal and Disposal of Used Oil DIVISION 03 – CONCRETE 03 20 60 Concrete Anchors 03 62 20 Nonshrink Grout for Equipment and Metalwork -- 1 of 506 -- Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Table of Contents 00 01 10 - 2 03 81 14 Concrete Repair DIVISION 05 – METALS 05 50 00 Metal Fabrications DIVISION 09 – FINISHES 09 96 20 Coatings DIVISION 22 – PLUMBING 22 05 04 Removal of Mechanical Equipment 22 05 23 General-Duty Valves for Piping 22 05 29 Hangers and Supports for Piping and Equipment 22 11 80 Cooling Water Piping and Pump 22 15 00 Compressed Air Systems 22 15 13 Compressed Air Piping 22 15 17 Air Plumbing Cabinets 22 15 19 Compressed Air Equipment DIVISION 25 – INTEGRATED AUTOMATION 25 12 10 Programmable Logic Controller DIVISION 26 – ELECTRICAL 26 05 02 Basic Electrical Materials and Methods 26 05 04 Electrical Demolition and Removal 26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding 26 05 33 Raceways and Boxes 26 05 80 Equipment Wiring Checkout and Operational Tests 26 24 20 Control Panels and Enclosures 26 28 16 Fused Disconnect Switch DIVISION 33 – UTILITIES 33 09 12 Water Level Measuring Device DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION 35 22 20 Crest Gate Position Indicator -- 2 of 506 -- Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Table of Contents 00 01 10 - 3 DIVISION 40 – PROCESS INTEGRATION 40 61 93 Input/Output List DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS 51 00 00 Information Available to Offerors 51 00 20 Photographs, Gate 1 Compressor System 51 00 21 Photographs, Gate 3 Compressor System 51 00 22 Photographs, Air and Water Distribution Piping 51 00 23 Photographs, Cooling Water System 51 00 24 Photographs, Electrical Components 51 00 25 Photographs, Stairs 51 00 26 Photographs, Site, Staging, and Access 51 00 30 Gate Bladder Test and Inspection Results 51 00 50 Electronic Media Release 51 02 82 Hazardous Materials Survey and Analytical Results DIVISION 52 – DRAWINGS 52 00 00 Drawings END OF CONTENTS -- 3 of 506 -- Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Table of Contents 00 01 10 - 4 This page intentionally left blank. -- 4 of 506 -- Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Summary of Work 01 11 00 - 1 SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.01 LOCATION A. Work is located at Friant Dam approximately 15 miles northeast of Fresno, California, in Fresno County and Madera County. 1.02 PRINCIPAL COMPONENTS OF WORK A. Removal and Disposal of the following existing features: 1. Compressors. 2. Air dryers. 3. Air plumbing cabinets. 4. Air piping. a. Flexible hose connection to air bladders is not included in scope of work. 5. Cooling water piping and pumps. a. Existing carbon steel cooling water pipe is not included in scope of work. 6. Programmable logic controller (PLC) cabinet. B. Metalwork: 1. Rehabilitating existing staircases. C. Mechanical: 1. Furnishing and installing the following new features: a. Compressors. b. Air dryers. c. Air plumbing cabinets. d. Air piping: 1) All air distribution piping. 2) Making new emergency compressor connection line to top dam. e. Cooling water piping and pumps. D. Electrical: 1. Furnishing and installing: -- 5 of 506 -- Obermeyer Crest Gates Compressor System Replacement Friant Dam, Friant Division Central Valley Project, California Specifications No. 20-C0944 Summary of Work 01 11 00 - 2 a. A new Electronic Processing Unit (EPU) Control Cabinet. b. A new communication card for future Central Valley Automated Control System (CVACS). c. New gate position inclinometers. d. New draw-wire encoder for existing float system. 1.03 SPECIFICATIONS REQUIREMENTS A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52. B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated. C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase. 1.04 DEFINITIONS A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued. 1.05 ACRONYMS A.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)