What this opportunity is
The Department of the Interior is seeking a contractor for the replacement of the Obermeyer Crest Gates Compressor System at Friant Dam, part of the Central Valley Project in California. This project is set aside for total small businesses under FAR 19.5, making it suitable for small contractors with relevant experience in construction and mechanical systems. Interested businesses should note that this is a solicitation notice, indicating they should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 12 10 Other Contracts
01 14 10 Use of Site
01 14 12 Work Restrictions
01 14 20 Reservoir Operations
01 14 30 Interruption of Service
01 31 22 Coordination Meetings
01 31 30 Contract Document Management System
01 32 10 Construction Program
01 33 00 Submittals
01 33 26 Electrical Drawings and Data
01 35 10 Safety Data Sheets
01 35 20 Safety and Health
01 35 30 Contractor’s Onsite Safety Personnel
01 35 50 Site Security
01 42 10 Reference Standards
01 46 00 Quality Procedures
01 51 00 Temporary Utilities
01 55 00 Vehicular Access and Parking
01 55 20 Traffic Control
01 56 10 Protection of Existing Installations
01 56 32 Temporary Safety Fence
01 57 20 Environmental Controls
01 57 30 Water Pollution Control
01 60 00 Product Requirements
01 74 00 Cleaning and Waste Management
01 78 30 Project Record Documents
01 79 20 Training
01 91 13 Commissioning and Testing
DIVISION 02 – EXISTING CONDITIONS
02 83 33 Disposal of Equipment with Coatings Containing Hazardous Materials
02 87 20 Removal and Disposal of Used Oil
DIVISION 03 – CONCRETE
03 20 60 Concrete Anchors
03 62 20 Nonshrink Grout for Equipment and Metalwork
-- 1 of 506 --
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Table of Contents
00 01 10 - 2
03 81 14 Concrete Repair
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 09 – FINISHES
09 96 20 Coatings
DIVISION 22 – PLUMBING
22 05 04 Removal of Mechanical Equipment
22 05 23 General-Duty Valves for Piping
22 05 29 Hangers and Supports for Piping and Equipment
22 11 80 Cooling Water Piping and Pump
22 15 00 Compressed Air Systems
22 15 13 Compressed Air Piping
22 15 17 Air Plumbing Cabinets
22 15 19 Compressed Air Equipment
DIVISION 25 – INTEGRATED AUTOMATION
25 12 10 Programmable Logic Controller
DIVISION 26 – ELECTRICAL
26 05 02 Basic Electrical Materials and Methods
26 05 04 Electrical Demolition and Removal
26 05 10 Conductors and Cables
26 05 20 Grounding and Bonding
26 05 33 Raceways and Boxes
26 05 80 Equipment Wiring Checkout and Operational Tests
26 24 20 Control Panels and Enclosures
26 28 16 Fused Disconnect Switch
DIVISION 33 – UTILITIES
33 09 12 Water Level Measuring Device
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 22 20 Crest Gate Position Indicator
-- 2 of 506 --
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Table of Contents
00 01 10 - 3
DIVISION 40 – PROCESS INTEGRATION
40 61 93 Input/Output List
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors
51 00 20 Photographs, Gate 1 Compressor System
51 00 21 Photographs, Gate 3 Compressor System
51 00 22 Photographs, Air and Water Distribution Piping
51 00 23 Photographs, Cooling Water System
51 00 24 Photographs, Electrical Components
51 00 25 Photographs, Stairs
51 00 26 Photographs, Site, Staging, and Access
51 00 30 Gate Bladder Test and Inspection Results
51 00 50 Electronic Media Release
51 02 82 Hazardous Materials Survey and Analytical Results
DIVISION 52 – DRAWINGS
52 00 00 Drawings
END OF CONTENTS
-- 3 of 506 --
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Table of Contents
00 01 10 - 4
This page intentionally left blank.
-- 4 of 506 --
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located at Friant Dam approximately 15 miles northeast of Fresno, California, in
Fresno County and Madera County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Removal and Disposal of the following existing features:
1. Compressors.
2. Air dryers.
3. Air plumbing cabinets.
4. Air piping.
a. Flexible hose connection to air bladders is not included in scope of work.
5. Cooling water piping and pumps.
a. Existing carbon steel cooling water pipe is not included in scope of work.
6. Programmable logic controller (PLC) cabinet.
B. Metalwork:
1. Rehabilitating existing staircases.
C. Mechanical:
1. Furnishing and installing the following new features:
a. Compressors.
b. Air dryers.
c. Air plumbing cabinets.
d. Air piping:
1) All air distribution piping.
2) Making new emergency compressor connection line to top dam.
e. Cooling water piping and pumps.
D. Electrical:
1. Furnishing and installing:
-- 5 of 506 --
Obermeyer Crest Gates Compressor System Replacement
Friant Dam, Friant Division
Central Valley Project, California Specifications No. 20-C0944
Summary of Work
01 11 00 - 2
a. A new Electronic Processing Unit (EPU) Control Cabinet.
b. A new communication card for future Central Valley Automated Control
System (CVACS).
c. New gate position inclinometers.
d. New draw-wire encoder for existing float system.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless
otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by
inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations
(FAR), definition of the word or term shall be in accordance with FAR sections in effect
at the time solicitation was issued.
1.05 ACRONYMS
A.…
Source: SAM.gov, as posted. Verify the current solicitation before responding.