Green River Lake Boundary Marking and Maintenance

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W912QR26QA064
NAICS
561730
PSC
F099
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 17, 2026
Response due
July 31, 2026
Place of performance
Campbellsville, KY

What this opportunity is

The Department of Defense is seeking services for boundary marking and maintenance at Green River Lake in Kentucky, classified under NAICS 561730. This opportunity is set aside for total small businesses, making it suitable for small contractors looking to engage with federal projects. As a solicitation notice, interested businesses should prepare to submit bids rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Special Instructions: This Request for Proposal (RFP) is for the contractor to preform boundary marking and maintenance at Green River Lake, in accordance with the attached Scope of Work (SOW). The contractor’s work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to ensure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. The Contractor shall begin work within 10 days of the Notice of Award. All the completed work shall be completed at Green River Lake within 266 calendar days from Notice of Award. One award will be made with this Solicitation. Location: Green River Lake 544 Lake Road Campbellsville, KY 42718 This procurement is 100% set-aside for Small Business, NAICS 561730 (Size Determination $9.5M). Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. One award will be made from this Solicitation. Note: The contract award will be based on Lowest Price to the Government. Quotes are due on 31 July 2026 at 10:00 AM Eastern Time. Electronic submittals will be accepted. You must submit your quote through PIEE (directions are attached). Fax, telephones, or mailed submittals will not be accepted. For contractual questions, please contact Kellsie Peacher by e-mail at kellsie.a.peacher@usace.army.mil. **ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov). PLEASE NOTE: SAM is completely free of charge for both registrants and users. Note: Page numbering in this document may not be accurate. -- 1 of 9 -- Bid Sheet Base for inspection and marking of boundary line = 75 miles Scope of Work Maintenance of Boundary Line U.S. Army Corps of Engineers Green River Lake 544 Lake Road Campbellsville, KY 42718 SPECIFICATIONS MAINTENANCE OF BOUNDARY LINE I. GENERAL. The work shall consist of inspecting and marking sections of the Government fee boundary line at Green River Lake located in Taylor and Adair counties. The Government will provide copies of segment maps of the work area as needed by the Contractor as the work progresses. The Contractor shall provide all personnel, boundary paint, tools, equipment, and transportation needed to perform this work. Plastic boundary sleeves and placards will be furnished by the government. The contractor inspection and marking of boundary line is to be completed by March 31, 2027. II. WORK TO BE COMPLETED. Mark the existing project fee boundary line with paint, or in areas designated by the government, boundary placards. Boundary placards are typically used in lieu of painting when the boundary line is following a road right of way. The contractor will keep field notes and records of boundary line marked and boundary points. Points on the fee line are marked in the field with typical USGS type brass monuments and posts with survey pins. The monuments are stamped with numbers, which correspond with monument numbers shown on project segment maps. In addition, each monument location and points on line are marked with metal monument posts, which are standard "farm type" T-shaped metal fence posts, which have been painted red. Line Bid Items Quantity Unit Unit Price Total Base 75 miles 1 mile Additional mileage not to exceed 25 miles 25 miles 1 mile Totals 100 Total miles X X -- 2 of 9 -- The Contractor is expected to locate the fee line by looking for monument posts, survey pins, and previously painted trees, however; previously applied paint may have lightened to the point where it is difficult or impossible to see. In these situations, a compass (Ranger type or similar) can be used to locate the fee line direction of travel by using the bearings noted on the segment maps provided by the government. Once the compass has been used to determine the direction of travel and previously painted trees or posts are not visible; the contractor will proceed forward (without painting trees) looking for the next monument post or previously painted trees that will verify that the direction of travel is correct. Once correct direction of travel is known, the contractor will have to backtrack to paint trees (according to distance specifications) that may have been passed while searching for the correct line of travel. a. Painting - All paint markings will be made red in color with paint specified to standards for marking trees. Paint shall be pre-approved by the

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 561730)