What this opportunity is
The government is buying a commercial-grade vehicle wash rack system, including installation and maintenance. This procurement is set aside for total small businesses. The work will be performed in South Carolina, and as this is a solicitation notice, interested businesses should prepare to bid rather than just track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
STATEMENT OF WORK
GROUND TRANSPORTATION WASH RACK
ON
SHAW AFB, SC
07 MAY 2026
-- 1 of 12 --
2
Table of Contents
1. Scope of Work ............................................................................................................................. 4
2. Removal and Disposal Requirements ......................................................................................... 4
2.1 General Removal ...................................................................................................................... 4
2.2 Electrical Disconnection ........................................................................................................... 4
2.3 Handling and Transportation..................................................................................................... 4
2.4 Disposal..................................................................................................................................... 5
2.5 Salvage and Turn-In .................................................................................................................. 5
2.6 Site Restoration ......................................................................................................................... 5
3. Equipment Installation ................................................................................................................ 5
3.1 Equipment to be Installed ......................................................................................................... 5
4. Installation Requirements ........................................................................................................... 5
5. Integration Requirements ............................................................................................................ 6
6. Testing and Validation ................................................................................................................. 6
7. Safety and Compliance ............................................................................................................... 6
8. Site-Specific Requirements and Liabilities ................................................................................. 6
8.1 Service Location ....................................................................................................................... 6
8.2 Contractor Liability................................................................................................................... 7
8.3 Operational Phasing .................................................................................................................. 7
9. General Operating Procedures .................................................................................................... 7
9.1 Base Hours of Operation........................................................................................................... 7
9.2 Service Cancellation ................................................................................................................. 7
10. Security Requirements .............................................................................................................. 7
10.1 Base Access and Identification ............................................................................................... 7
10.2 Base Traffic Regulations ......................................................................................................... 7
10.3 Prohibition of Weapons ........................................................................................................... 8
10.4 Handling of Sensitive Information.......................................................................................... 8
10.5 Security Reporting .................................................................................................................. 8
10.6 Physical Security..................................................................................................................... 8
10.7 Delays Due to Military Operations ......................................................................................... 8
11, DETAILED TASK REQUIREMENTS FOR LONG-TERM MAINTENANCE PLAN ................ 8
-- 2 of 12 --
3
11.1 High-Pressure Pump System (Hotsy) ..................................................................................... 8
11.2 Air Compressor System .......................................................................................................... 9
11.3 Industrial Vacuum System....................................................................................................... 9
11.4 Chemical Dispensing & Foaming System ............................................................................ 10
11.5 Hoses, Wands, Reels, and Nozzles ........................................................................................ 10
12. Contract Management, Scheduling, and Service Response .....................................................11
12.1 Contract Manager (CM).........................................................................................................11
12.2 Schedule of Service................................................................................................................11
12.3 Contractor Availability and Response Time ..........................................................................11
13. Contractor Service Report....................................................................................................... 12
-- 3 of 12 --
4
1. Scope of Work
The Contractor shall provide all labor, materials, tools, equipment, transportation, and
supervision necessary to:
• Remove and properly dispose of existing wash rack components
• Install and integrate new system components
• Test, validate, and ensure full operational functionality of the system
2. Removal and Disposal Requirements
2.1 General Removal
• The Contractor shall safely disconnect, dismantle, and remove existi…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 811310)
Airfield Vehicle Gates Maintenance and Repair Services
DEPT OF DEFENSE · Sources Sought · due June 29, 2026
BUTLER HIGH SPEED TIP GRINDER PM/RM
DEPT OF DEFENSE · Special Notice · due July 7, 2026
F-16 Static Display Renovation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 26, 2026
RAFL/M Aircraft Parts Washers BPA
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 6, 2026
P500--623-26-2-5455-0261 CHIP-IN Elevator Decommissioning (VA-26-00040484)
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation · due June 25, 2026
J041--FY 26 | 1X Services | Daikin M1C Compressor Replacement | 528A6
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due June 23, 2026