GT Wash Rack Upgrade & Maintenance

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA480326Q0087
NAICS
811310
PSC
J049
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 18, 2026
Response due
June 30, 2026
Place of performance
Charleston AFB, SC

What this opportunity is

The government is buying a commercial-grade vehicle wash rack system, including installation and maintenance. This procurement is set aside for total small businesses. The work will be performed in South Carolina, and as this is a solicitation notice, interested businesses should prepare to bid rather than just track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 STATEMENT OF WORK GROUND TRANSPORTATION WASH RACK ON SHAW AFB, SC 07 MAY 2026 -- 1 of 12 -- 2 Table of Contents 1. Scope of Work ............................................................................................................................. 4 2. Removal and Disposal Requirements ......................................................................................... 4 2.1 General Removal ...................................................................................................................... 4 2.2 Electrical Disconnection ........................................................................................................... 4 2.3 Handling and Transportation..................................................................................................... 4 2.4 Disposal..................................................................................................................................... 5 2.5 Salvage and Turn-In .................................................................................................................. 5 2.6 Site Restoration ......................................................................................................................... 5 3. Equipment Installation ................................................................................................................ 5 3.1 Equipment to be Installed ......................................................................................................... 5 4. Installation Requirements ........................................................................................................... 5 5. Integration Requirements ............................................................................................................ 6 6. Testing and Validation ................................................................................................................. 6 7. Safety and Compliance ............................................................................................................... 6 8. Site-Specific Requirements and Liabilities ................................................................................. 6 8.1 Service Location ....................................................................................................................... 6 8.2 Contractor Liability................................................................................................................... 7 8.3 Operational Phasing .................................................................................................................. 7 9. General Operating Procedures .................................................................................................... 7 9.1 Base Hours of Operation........................................................................................................... 7 9.2 Service Cancellation ................................................................................................................. 7 10. Security Requirements .............................................................................................................. 7 10.1 Base Access and Identification ............................................................................................... 7 10.2 Base Traffic Regulations ......................................................................................................... 7 10.3 Prohibition of Weapons ........................................................................................................... 8 10.4 Handling of Sensitive Information.......................................................................................... 8 10.5 Security Reporting .................................................................................................................. 8 10.6 Physical Security..................................................................................................................... 8 10.7 Delays Due to Military Operations ......................................................................................... 8 11, DETAILED TASK REQUIREMENTS FOR LONG-TERM MAINTENANCE PLAN ................ 8 -- 2 of 12 -- 3 11.1 High-Pressure Pump System (Hotsy) ..................................................................................... 8 11.2 Air Compressor System .......................................................................................................... 9 11.3 Industrial Vacuum System....................................................................................................... 9 11.4 Chemical Dispensing & Foaming System ............................................................................ 10 11.5 Hoses, Wands, Reels, and Nozzles ........................................................................................ 10 12. Contract Management, Scheduling, and Service Response .....................................................11 12.1 Contract Manager (CM).........................................................................................................11 12.2 Schedule of Service................................................................................................................11 12.3 Contractor Availability and Response Time ..........................................................................11 13. Contractor Service Report....................................................................................................... 12 -- 3 of 12 -- 4 1. Scope of Work The Contractor shall provide all labor, materials, tools, equipment, transportation, and supervision necessary to: • Remove and properly dispose of existing wash rack components • Install and integrate new system components • Test, validate, and ensure full operational functionality of the system 2. Removal and Disposal Requirements 2.1 General Removal • The Contractor shall safely disconnect, dismantle, and remove existi

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 811310)