HANEL LEAN LIFT CABINET (SOLE SOURCE)
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
SPMYM226Q7575
NAICS
332999
PSC
7125
Set-aside
No Set aside used
Posted
July 27, 2026
Response due
August 7, 2026
Place of performance
Silverdale, WA
Description
Specification for a
Shop 38B Delta Pier Vertical Storage Lift
Project # 388-360
27 Jul 26
1 SCOPE
This specification reflects those characteristics that are essential to the minimum needs of the
government for a Vertical Storage Lift (McManus Brothers, Inc., Hanel Lean Lift Vertical Lift
Module, Model Lean Lift 2860-825/281/320/75/650/40 or equal). The scope of work shall include
the “Turn-Key” set-up, operational testing and training of the equipment as specified herein. This lift
shall store various types of materials/components/parts used in the maintenance/repair of submarines
at the pier. The Vertical Storage Lift shall have the capability to store bulky, heavy and dissimilar
parts, with fast storage and retrieval times. The lift shall have a computerized lift/extractor at the
center of the cabinet, with storage shelves/containers in front and behind the extractor. An operator
shall be able to store/retrieve an item via a push button controller, using a micro-processor controller,
mounted on a swivel arm. Each container/shelf shall be able to hold a minimum of 1,433 lbs., with
the total system being able to hold a minimum of 88,000 lbs. The Vertical Lift Storage Lift shall be
designed in accordance with requirements identified in these specifications and shall meet all safety
requirements as outlined in enclosure 1. It is the government’s intent that a single (primary)
contractor be awarded this contract and be responsible for the accomplishment of all work detailed by
this specification.
2 APPLICABLE DOCUMENTS
The following documents form a part of this specification to the extent specified herein. Unless
otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals
shall apply.
2.1 SAFETY REQUIREMENTS
Safety Requirements for the Trident Refit Facility (TRF), Bangor Site
A copy of this document is attached to this specification (See Enclosure 1).
2.2 ADDITIONAL SAFETY REQUIREMENTS In addition to the safety requirements specified
in Paragraph 2.1, the following is requisite:
2.2.1 The equipment and its component parts shall be in compliance with applicable Code of Federal
Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and
approved by TRF, Bangor, if it meets specific Occupational Safety and Health Administration (OSHA)
conditions outlined in CFR Title 29, Part 1910; Subparts "O" and "S". Specifically, equipment will be
"Accepted" by TRF, Bangor, if it has been inspected and found by a Nationally Recognized Testing
Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment
(as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified
(by an OSHA authorized third party). One (1) “hard” copy of the NRTL certification report shall be
provided. If the equipment type/model has already been NRTL inspected and certified, a certification
report (one (1) ”hard” copy) or documentation mounted on the equipment, (which acknowledges it is
NRTL certified), shall be provided.
2.3 GENERAL ENVIRONMENTAL REQUIREMENTS
2.3.1 Hazardous Material Control shall include the following:
2.3.1.1 Estimated Contractors Hazardous Material Inventory (CHMI) Table provides quantities of
each hazardous material to be used on this project. Copies of all SDS's will be submitted to the Base
Environmental Office (BEO) and be kept on site where the work is being performed.
-- 1 of 20 --
Specification for a
Shop 38B Delta Pier Vertical Storage Lift
Project # 388-360
27 Jul 26
2.3.1.2 Contractor shall not use Hazardous Material (HM) composed of any of the following
chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene,
chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I ODS,
radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed
in 40 CFR 355.50 Appendix B.
2.3.1.3 If additional HM is required for this project, an SDS shall be submitted to the BEO for
approval before the HM is brought on board Naval Base Kitsap Bangor. The contractor shall not
bring on board Naval Base Kitsap Bangor any HM until approved by the BEO. All containers of
hazardous material shall be resealed, placed in a secure area while on base, and transported off base
for reuse of material at other contractor projects. The Contractor shall not generate any contractor
generated hazardous or dangerous waste on this project.
2.3.2 Waste Control shall include the following:
2.3.2.1 A trained individual from the shop with a current Waste Originator certification must be
present for each shift that hazardous waste is produced.
2.3.2.2 The shop shall submit completed NBK Bangor Waste Information Specification (WIS) forms
for all waste, hazardous and non-hazardous, expected to be encountered during the course of this
project. The BEO will provide final waste designation along with WIS instructions. If additional
wastes are produced after this plan is approved, waste is encountered not identified, or changes occur
to waste streams that have already been assigned a WIS number, a new or updated WIS's for each
waste stream must be submitted to the BEO for designation.
2.3.2.3 A hazardous waste label must be affixed to the appropriate container upon the first addition
of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous
Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the
control of the shop and located in the same area the waste is generated.
3 REQUIREMENTS:
3.1 GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum
government requirements for a “Turn-Key” Vertical Storage Lift.
3.2 WORK INCLUDED - The Contractor shall be responsible for the following:
Design, manufacture, test and groom all equipment required to provide a complete
system and in accordance with the requirement…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗