J--GC26 - MAINTENANCE OF JANUS FIRE
INTERIOR, DEPARTMENT OF THE
Notice type
Combined Synopsis/Solicitation
Solicitation #
140R4026Q0089
NAICS
541990
PSC
J012
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 20, 2026
Response due
July 23, 2026
Description
-- 1 of 5 --
-- 2 of 5 --
Inspection and Maintenance of Janus Fire System
Comprehensive Requirements for Contractors and Facility Managers
Background
The Glen Canyon Power Plant utilizes the Janus Fire Systems LPCO₂ fire suppression system
to safeguard the windings of its eight main generating units. This system is designed to
extinguish fires primarily through oxygen displacement or vapor phase reduction, effectively
halting combustion. It delivers at least 50% CO₂ concentration within the airtight generator
air housing in seven minutes. Since installation in 2015, the system has remained operational
but has not yet been inspected.
Scope of Work
The Bureau of Reclamation, Glen Canyon Field Division, requires inspection of the CO₂ fire
suppression system at the Glen Canyon Power Plant located in Page, Arizona, off Highway
89. The inspection is to ensure continued operation and compliance.
Requirement
The Contractor shall furnish all labor, tools, equipment, and technical expertise necessary for the
inspection. The following tasks must be performed annually unless otherwise specified:
System Inspection Tasks
Functional testing of fire suppression alarm control panel under normal and emergency
(battery backup) conditions
Testing of alarm initiating devices
Testing system disable switches
Functional testing of audio/visual notification devices
Functional testing of actuators or solenoids
Functional testing of auxiliary functions
Verification that system signals are received by third-party monitoring service
Visual inspection of room integrity and system enclosure
Visual inspection of CO₂ tanks for physical damage and secure mounting
Verification of CO₂ agent quantities
Visual inspection of distribution piping and discharge/actuation hoses
Testing of associated valves and pneumatic equipment
-- 3 of 5 --
Testing of time-delay and lockout valves
Inspection of Generator Air Housing Discharge Nozzles will only be able to be inspected during a
Unit outage.
The 1st inspection shall include hydrostatic testing of the hose and is not required
thereafter.
Ensure system compliance with NFPA 12 standards for CO₂ systems.
Key System Components
Two CO₂ storage tanks (rated for 300 PSI)
Distribution piping and nozzles
System actuators
Compressor condensing unit (Copeland CJAL-0200-TAD-001, 406 VAC, 3-phase, 500
PSI)
Inspection Report
Upon completion of the inspection, the Contractor shall submit a detailed report including:
System condition
Identified deficiencies or malfunctions
Recommended repairs or part replacements
Detailed cost estimates for all proposed parts and repairs, clearly separating labor and
parts costs; labeled photos of deficiencies or damaged equipment
No repair work is authorized until Reclamation reviews the report and the Contracting
Officer issues written authorization to proceed.
Inspection Scheduling
The Contractor must coordinate with the designated Contracting Officer Representative
(COR) to schedule the inspection within 60 days of contract award. Inspections should be
scheduled at least two weeks in advance.
Contact Information:
COR - Stephen (Brad) Owens
Email: sbowens@usbr.gov
Safety and Health Requirements
The Contractor must implement all necessary health and safety measures to protect personnel,
government employees, the public, and surrounding property. Compliance is required with:
All applicable federal, state, and local safety regulations
-- 4 of 5 --
The Bureau of Reclamation’s Reclamation Safety and Health Standards (RSHS), 2009
Edition (Available at: http://www.usbr.gov/ssle/safety/RSHS/rshs.html)
Contractor will provide their own PPE.
Onsite Job Hazard Analysis (JHA) will be provided to the Onsite Supervisor and Project
Manager.
Site Conditions
The CO₂ system is located within the Glen Canyon Dam Power Plant. The following facilities
are available to the Contractor at no cost:
Restrooms
Electricity
Non-potable water
Mobile phones and laptops are permitted. Photos should not be posted on social media.
The Contractor is responsible for conveying water and electricity to needed areas.
Work Hours
Monday through Thursday, 7:00 AM to 4:00 PM, excluding Federal holidays. Any work
outside these hours requires pre-approval from the COR or Contracting Officer.
Required Submittals
Please include the following information with your quote:
A four-year service contract beginning after initial inspection and any repairs, outlining
scheduled maintenance and coverage of all system components for ongoing compliance
and functionality.
Contractor must have at least 5 years’ experience working on CO₂ fire protection
systems. Provide details for at least two similar projects completed in the last five years,
including project description, contract value, company name, contact, and phone number.
A comprehensive list of inspection tasks, demonstrating all minimum requirements are
fully integrated in inspection procedures.
Proof of technician certification; test instruments must have proof of calibration.
Evidence of compliance with NFPA 12, if not already noted.
A proposed schedule or timeline.
If the Contractor fails to include the above required information in their quote, the quote can
be found nonresponsive and not be considered for award.
-- 5 of 5 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 541990)
Notice of Intent to Sole Source – Lori Carson Consulting LLC
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Presolicitation
MALU ETHNOGRAPHIC OVERVIEW MLK, JR. NHP
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due August 13, 2026
2d MarDiv CUAS ADFOR Support
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 1, 2026
Independent External Peer Reviews for the US Army Corps of Engineers
DEPT OF DEFENSE · Solicitation · due July 31, 2026
J042--Fire Alarm System Inspection, Testing, Maintenance, and Certification Services at the Bedford VA Medical Center
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 10, 2026
Average Annual Daily Traffic - Data Collection
TRANSPORTATION, DEPARTMENT OF · Sources Sought · due July 30, 2026