Lake Red Rock Playground Equipment with Installation
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W912EK26QA047
NAICS
339920
PSC
7830
Posted
July 21, 2026
Response due
August 3, 2026
Place of performance
Knoxville, IA
Description
INSTRUCTIONS: NOTICE TO OFFERORS
SUPPLY AND INSTALLATION OF PLAYGROUND EQUIPMENT FOR
WALLASHUCK CAMPGROUND
LAKE RED ROCK PROJECT, IOWA
1. REQUIRED SAM REGISTRATION: Prior to submitting an offer, vendors must be
actively registered in the System for Award Management (SAM) website, Registration
instructions may be obtained, and online registration may be accomplished, at www.sam.gov.
2. SCHEDULE OF PRICES (CLINS): Offeror’s must read the entirety of this document and
submit their quote to be considered for award. Offers received not complying with this
requirement will be considered non-responsive and will be rejected.
3. LOW PRICE PROCUREMENT: Award will be made to the responsive, responsible Small
Business only vendor capable of providing the SOW requirements at the lowest price to the
Government.
4. DOCUMENTS TO RETURN: In order to be considered responsive, offerors shall
complete and return all of the following:
Solicitation Cover Sheet, including taxpayer ID number, CAGE code, point of
contact, phone number and email address.
First page of solicitation, including offeror’s complete mailing address, telephone
number, offeror’s name, title, and signature.
Schedule of Prices (CLINs)
Offerors must complete all fill-ins and assure all return pages are received by the due date.
5. TELEPHONE NUMBER: Offerors must provide on the first page of this solicitation a
telephone number at which they can be contacted for a period of one week following the due
date of this solicitation. Quotes from persons who cannot be contacted by telephone during
normal office hours (8:00 a.m. through 4:00 p.m., CST) within the one-week period
following closing of this RFQ will be considered non-responsive and will be removed from
further consideration.
6. PRE-BID SITE VISIT: No formal site visits are scheduled; however, offerors are encouraged
to inspect the site where the work will be performed. Site visits may be arranged during normal
business hours of 7:30AM through 4:00PM. Contact the following to set up a site visit:
Jessica Huston
Lake Red Rock Project Office
1105 N Hwy T-15
Knoxville, IA 50138
641-828-7522 x6431
Jessica.J.Huston@usace.army.mil
-- 1 of 12 --
Page 2 of 7
SCHEDULE OF PRICES (CLINs)
ITEM NO SUPPLIES/ QUANTITY UNIT AMOUNT
SERVICES
1 JOB $ _________________
0001
SUPPLY AND INSTALLATION OF PLAYGROUND EQUIPMENT AND
SURFACING
WALLASHUCK CAMPGROUND, LAKE RED ROCK
Provide, deliver, and install composite playground equipment, rubber mulch
playground surfacing, and underlayment fabric
TOTAL AMOUNT: $___________________
SPECIFICATIONS FOR SUPPLY AND INSTALLATION OF
PLAYGROUND EQUIPMENT
PART 1 – GENERAL
1.1 SCOPE OF WORK: This specification covers requirements for supervision, labor,
transportation, materials, coordination, and other items necessary for the installation of
the playground equipment at Wallashuck Campground at Lake Red Rock in Marion
County, Iowa. The work location is approximately 35 miles southeast of Des Moines,
Iowa in Knoxville, Iowa. Lake Red Rock is a flood control reservoir in Iowa, with
numerous parks and access areas managed by or leased from the U.S. Army Corps of
Engineers. All supplies, equipment, transportation and installation shall be in accordance
with these specifications and drawings in addition to the manufacturer’s specifications.
All work shall be accomplished in a safe, workmanlike manner and in accordance with
the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, most
current, all applicable Federal, State, and local safety codes and practices.
1.2 REFERENCES: References as follows:
⁻ EM 385-1-1 – Current Edition (available as a download at
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequir
-- 2 of 12 --
Page 3 of 7
ementsManual.aspx
⁻ All applicable Federal, State, and local safety codes, rules, and regulations
⁻ ADA Standards for Accessible Design
⁻ ASTM F1487
⁻ ASTM F1292
1.3 BASIS FOR PAYMENT: The contractor shall provide a firm-fixed price proposal for
the supply and installation of the playground equipment by the date and time identified in
the Solicitation.
1.4 INVOICING: Send invoices via email after completion of work for payment processing:
Jessica Huston
U.S. Army Corps of Engineers
Lake Red Rock Project Office
Jessica.J.Huston@usace.army.mil
1.5 HOURS: Regular work hours will be from 7:00 am – 4:00 pm Monday through Friday,
excluding federal holidays. Any proposed changes to the work hours must be coordinated
with the Government POC.
1.6 COMPLETION TIME: Work shall be fully complete by 1 November 2026.
1.7 ENVIRONMENTAL CLEANUP: The contractor shall maintain a clean work area at all
times. The contractor shall be responsible for the protection of the environment and will
be required to restore all damages subject to the approval of the contracting officer. The
contractor shall remove and dispose of all debris off Government property in a state
approved disposal site unless specified otherwise. The contractor will be required to
comply with all Federal and State environmental requirements.
PART 2 – PRODUCTS
2.1 MATERIALS & EQUIPMENT SUPPLIED BY CONTRACTOR: All materials shall
be new, undamaged, and meet or exceed the specifications and drawings as detailed in
this scope of work.
⁻ Composite Play Structure to meet ASTM F1487 standards and specifications detailed in
Part 3, section 2.
⁻ Americans with Disabilities Act (ADA) approved 100% recycled rubber mulch, brown in
color, designed for playground surfacing application meeting ASTM F1292 standards to
cover all playground use zone surface area at a depth to meet necessary critical fall height
according to ASTM standards.
⁻ Fabric designed for underlayment of rubber playground mulch.
2.2 SUSTAINABILITY: The contractor shall meet the recycled content requirements set
forth by EPA. The link is provided. The list is periodically updated; reviewers should
-- 3 of 12 --
Page 4 of 7
check EPA’s website.
⁻ http://www3.epa.gov/epawaste/conserve/to…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 339920)
Customized Interactive reflex and agility training system
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 27, 2026
Target Repair, Refurbishment and Upgrade Services
DEPT OF DEFENSE · Presolicitation · due August 20, 2026
Cold Plunge Tubs
DEPT OF DEFENSE · Solicitation · due July 23, 2026
Gym Equipment
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 6, 2026
Golf/Multi-Sport Simulator System
DEPT OF DEFENSE · Solicitation · due July 31, 2026
Gym Court Dividers
DEPT OF DEFENSE · Solicitation · due July 28, 2026