Mark Twain NF Beaver Lake Dam Rehabilitation

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
12363N26Q4161
NAICS
237310
PSC
Z1LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 14, 2026
Response due
July 20, 2026
Place of performance
MO

Description

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-14 U.S. Department of Transportation Federal Highway Administration Federal Lands Highway -- 1 of 762 -- Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 UNITED STATES DEPARTMENT OF TRANSPORTATION Federal Highway Administration -- 2 of 762 -- i PREFACE These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-14" indicating "Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and Metric units of measure. When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Federal Highway Administration are also governed by the following regulations: ● Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and ● Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12. The FAR and TAR regulations are not included in the FP-14. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402. U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure. -- 3 of 762 -- ii METRIC TO U.S. CUSTOMARY CONVERSION FACTORS (approximate) Symbol When You Know Multiply By To Find Symbol LENGTH μm micrometers 3.9 × 10 -5 inches in mm millimeters 0.039 inches in m meters 3.28 feet ft m meters 1.09 yards yd km kilometers 0.621 miles mi AREA mm2 square millimeters 0.0016 square inches in 2 m2 square meters 10.764 square feet ft2 m2 square meters 1.195 square yards yd 2 ha hectares 2.47 acres ac km2 square kilometers 0.386 square miles mi2 VOLUME mL milliliters 0.034 fluid ounces fl oz L liters 0.264 gallons gal m3 cubic meters 35.31 cubic feet ft3 m3 cubic meters 1.308 cubic yards yd 3 MASS g grams 0.035 ounces oz kg kilograms 2.2046 pounds lb Mg megagrams 1.1023 short tons T (or "t") (or "metric ton") (2000 lb) TEMPERATURE (exact) °C Celsius temperature 1.8C +32 Fahrenheit temperature °F ILLUMINATION lx lux 0.0929 foot-candles fc cd/m2 candela/m2 0.2919 foot-Lamberts fl MISCELLANEOUS J joule 0.7376 foot·poundforce ft·lbf N newtons 0.225 poundforce lbf kPa kilopascals 0.145 Poundforce per square inch lbf/in2 -- 4 of 762 -- iii TABLE OF CONTENTS DIVISION 100 GENERAL REQUIREMENTS ............................................................ 1 Section 101. — TERMS, FORMAT, AND DEFINITIONS........................................................ 2 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT ................................... 11 Section 103. — SCOPE OF WORK .......................................................................................... 14 Section 104. — CONTROL OF WORK .................................................................................... 16 Section 105. — CONTROL OF MATERIAL ........................................................................... 22 Section 106. — ACCEPTANCE OF WORK ............................................................................ 25 Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ............. 36 Section 108. — PROSECUTION AND PROGRESS ................................................................ 41 Section 109. — MEASUREMENT AND PAYMENT .............................................................. 45 DIVISION 150 PROJECT REQUIREMENTS ........................................................... 57 Section 151. — MOBILIZATION ............................................................................................. 58 Section 152. — CONSTRUCTION SURVEY AND STAKING .............................................. 59 Section 153. — CONTRACTOR QUALITY CONTROL ........................................................ 66 Section 154. — CONTRACTOR SAMPLING AND TESTING .............................................. 70 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS .................................. 72 Section 156. — PUBLIC TRAFFIC .......................................................................................... 81 Section 157. — SOIL EROSION AND SEDIMENT CONTROL ............................................ 85 Section 158. — WATERING FOR DUST CONTROL ............................................................. 91 DIVISION 200 EARTHWORK .................................................................................... 93 Section 201. — CLEARING AND GRUBBING ...................................................................... 94 Section 202. — ADDITIONAL CLEARING AND GRUBBING............................................. 96 Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS ............................. 98 Section 204. — EXCAVATION AND EMBANKMENT....................................................... 102 Section 205. — ROCK BLASTING ........................................................................................ 114 Section 206. — RESERVED ................................................................................................... 123 Section 207. — EARTHWORK GEOSYNTHETICS ............................................................. 124 Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237310)