Z--GAOA SOUTH PRYOR ROADS

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140L3626R0001
NAICS
237310
PSC
Z1LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 24, 2026
Response due
August 17, 2026

Description

GAOA SOUTH PRYOR ROADS RENOVATION SPECIFICATION BUREAU OF LAND MANAGEMENT 111 Garryowen Road Miles City, Montana 59301 APRIL 2026 -- 1 of 21 -- TABLE OF CONTENTS TABLE OF CONTENTS GAOA South Pryor Road Renovations 1 DIVISION 100 – GENERAL REQUIREMENTS ......................................................... 100-1 SECTION 101 – TERMS, FORMAT, AND DEFINITIONS .................................................................. 100-1 SECTION 103 - SCOPE OF WORK ................................................................................................... 100-2 SECTION 104 - CONTROL OF WORK .............................................................................................. 100-3 SECTION 106 – ACCEPTANCE OF WORK ....................................................................................... 100-4 SECTION 107 – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC.............................. 100-4 DIVISION 150 – PROJECT REQUIREMENTS ......................................................... 150-1 SECTION 151 – MOBILIZATION ....................................................................................................... 150-1 SECTION 152 – CONSTRUCTION SURVEY AND STAKING........................................................... 150-2 SECTION 154 – CONTRACTOR SAMPLING AND TESTING........................................................... 150-2 SECTION 155 – SCHEDULES FOR CONSTRUCTION CONTRACTS ............................................. 150-3 SECTION 156 – TEMPORARY TRAFFIC CONTROL ....................................................................... 150-3 SECTION 157 – SOIL EROSION AND SEDIMENT CONTROL ........................................................ 150-4 SECTION 158 – WATERING FOR DUST CONTROL ....................................................................... 150-5 DIVISION 200 – EARTHWORK ................................................................................ 200-1 SECTION 201 – CLEARING AND GRUBBING .................................................................................. 200-1 SECTION 204 – EXCAVATION AND EMBANKMENT ....................................................................... 200-1 SECTION 212 – LINEAR GRADING ................................................................................................... 200-4 DIVISION 300 – AGGREGATE AND BASE COURSES .......................................... 300-1 SECTION 302 – CRUSHED AGGREGATE ........................................................................................ 300-1 DIVISION 600 – INCIDENTAL CONSTRUCTION .................................................... 600-1 SECTION 624 – TOPSOIL ............................................................................................................. 600-2 SECTION 625 – SEEDING ................................................................................................................. 600-3 DIVISION 700 – MATERIALS ................................................................................... 700-1 SECTION 703 – AGGREGATES ........................................................................................................ 700-1 SUBSECTION 703.06 – CRUSHED AGGREGATE....................................................................... 700-1 SECTION 713 – MISCELLANEOUS MATERIALS.............................................................................. 700-1 SUBSECTION 713.04 – SEED ...................................................................................................... 700-1 SUBSECTION 713.17 – ROLLED EROSION CONTROL PRODUCTS ......................................... 700-2 SUBSECTION 713.23 – WATER ................................................................................................... 700-2 -- 2 of 21 -- DIVISION 100 – General Requirements GENERAL REQUIREMENTS GAOA South Pryor Road Renovations 100-1 SECTION 101 – TERMS, FORMAT, AND DEFINITIONS 101.01 Specifications Format: These specifications are model after the FP-24. The FP-24 is divided into 10 Divisions as follows: 1. Division 100 consists of general contract requirements for which no direct payment is made. 2. Division 150 consists of project specific contract requirements. Work under Division 150 is paid for directly or indirectly according to the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made. 3. Divisions 200 through 600 consist of construction requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made. 4. Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600. 5. The first three digits of the pay item number in the bid schedule identify the Section under which the work is performed. 101.02 References: Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following: AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 225 Washington, DC 20001 ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103 FP Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects Superintendent of Documents Government Printing Office Washington, DC 20402 Fed. Spec. Federal Specification/Standard General Services Administration Specifications Branch Room 6039, GSA Building Seventh and D Streets, S.W. Washington, DC 20407 MDT Standard Specifications for Ro

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237310)