What this opportunity is
The Department of Agriculture is seeking quotations for the Multiple Trail Bridges Replacement Project Phase 2, which involves constructing seven new trail bridges, repairing one trail embankment, and building a boardwalk platform in Georgia. This opportunity is set aside for total small businesses under NAICS code 237310, which pertains to highway, street, and bridge construction. Interested small businesses should note that this is a combined synopsis/solicitation, meaning they must respond directly to this announcement rather than waiting for a separate solicitation document.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Solicitation 12******
Statement of Work
Tropical Storm Zeta’s Chattooga River Ranger District (CRRD)
Multiple Trail Bridges Replacement Project (Phase 2)
Page 1 of 21
TROPICAL STORM ZETA’S
CHATTOOGA RIVER RANGER DISTRICT (CRRD)
MULTIPLE TRAIL BRIDGES REPLACEMENT PROJECT (PHASE 2)
DESCRIPTION/SPECIFICATIONS / STATEMENT OF WORK
DESCRIPTION OF WORK
1. This work includes constructing (7)- new trail bridges, reconstruction of (1)- trail embankment
fill slope failure repair, and new construction of (1) - Boardwalk platform with ramp that shall
tie into the new Lake Russell M.P. 2.18 trail bridge.
• (4) of the new trail bridges to be constructed consists of constructing using reinforced
concrete abutments.
• (3) of the new trail bridges to be constructed consists of constructing using gabion’s
abutments.
2. This work shall consist of the Contractor providing any and all mobilization, equipment, labor,
materials, tools, supervision, safety and other incidentals necessary to perform all work for the
specified construction activities in accordance with the Schedule of Items, Forest Service
Supplemental Specification (FSSS), Standard Specifications for Construction of Roads and
Bridges on Federal Highway Projects per FP-14 Specifications, all supporting project specific
drawings, contract, laws, rules, and regulations.
3. The contractor shall be responsible for all soil erosion and sediment control, construction
surveying and staking, vegetation management, clearing and grubbing, disposal of clearing and
grubbing materials off govt. lands, removal of existing specified trail bridges and legally
disposal off govt. lands, embankment failure repairs, hauling activities, furnishing and
underdrain system construction, placement and construction including steel reinforcement,
gabions placement, gabions erection and construction, and furnishing, erection, and
construction of all trail bridges in its entirety, importing of specified materials, trail
embankment construction, geotextile placement, riprap keying and armoring, grouting
specified riprap, furnishing and constructing specified trail guardrails, importing, placement,
and compaction of foundation fill and aggregate surfacing, and turf establishment (seed &
mulching).
4. The contractor’s soil erosion and sediment control measures shall be incidental to the
contractor’s proposal along with the contractor’s soil erosion and sediment control plan.
5. All trail bridges were surveyed in 2020 and may be over vegetated. Therefore, it shall be the
contractor’s responsibility to locate and find the minimum amount of control points needed for
successful construction, surveying and staking of the new trail bridges and all associated work
with it. Findings of the minimum amount of control points required for successful construction,
surveying and staking and vegetation management that may be required to locate the existing
control points shall be incidental to the contractor’s proposal.
6. All specified work shall be confined within the limits of the existing trail traveled way,
adjacent ditches, shoulders, cut/fill slopes, and trail embankment stabilizations. Running off
the trails will not be allowed on project site and will result into write-up and Notice of
Non-Compliance.
-- 1 of 21 --
Solicitation 12******
Statement of Work
Tropical Storm Zeta’s Chattooga River Ranger District (CRRD)
Multiple Trail Bridges Replacement Project (Phase 2)
Page 2 of 21
7. At all times during the performance of this contract and until the work is completed and
accepted, the Contractor shall directly supervise the work or assign and have on the work site
a competent superintendent who is satisfactory to the Contracting Officer and has authority to
act for the Contractor. The superintendent shall be designated in writing to the Contracting
Officer prior to the commencement of work. This individual shall be able to read, speak, and
understand English.
8. Pole Creek Trail Bridge M.P. 0.75 shall consist of contractor using a crane to lift their
mechanized equipment over the existing highway bridge guardrail to access the trail.
Contractor shall refer to Subsheet 27 of 59 of the attached solicited drawings. There is no pay
item in the Schedule of Items to account for the contractor’s crane and flagger services. All
crane and flagger’s services to access Pole Creek Trail bridge M.P. 0.75 shall be incidental to
the contractor’s proposal.
9. Lick Log Trail Bridge M.P. 6.79 shall consist of contractor using an old timber road to access
the trail bridge located within the Wilderness. There are over 20 roadway berms that will be
required for removal to access the trail bridge and resetting after the Lick Log M.P. 6.79 trail
bridge is 100% completed. There is a respective pay item in the Schedule of Items under the
Lick Log Trail bridge to account for berms removal and resetting. Any tree clearing shall
require C.O. approval in advance due to being in the Wilderness.
PROJECT LOCATIONS
Project Site Latitude Longitude
Becky Branch Trail Bridge M.P. 18.84 34.883501 -83.352097
Bertram National Trail Fill Slope
Embankment Failure 34.883472 -83.352058
Dicks Creek Trail Bridge M.P. 9.25 34.868767 -83.247064
Lick Log Creek Trail Bridge M.P. 6.79 34.841958 -83.270822
Pole Creek Trail Bridge M.P. 0.75 34.819064 -83.309432
Sourwood Creek Trail Bridge M.P. 1.8 34.50769 -83.47340
Lake Russell Trail Bridge M.P. 0.10 34.498868 -83.483375
Lake Russell Trail Bridge M.P. 2.18 34.485576 -83.500331
WORKING HOURS
Normal operational hours are approximately from 06:30 am to 5:30 PM Eastern Standard Time, Monday
through Friday (Federal Holidays excluded). Weekend work may be permitted with written approval
from the Contracting Officer (C.O.) at a minimum of 7 business prior.
• Federal Holidays
1. New Year’s Day – January 1 st
2. Martin Luther King Junior’s Birthday – Third Monday in January
-- 2 of 21 --
Solicitation 12******
Statement of Work
Tropical Storm Z…
Source: SAM.gov, as posted. Verify the current solicitation before responding.