N--UMESC HYDRONIC BOILER REPLACEMENT
INTERIOR, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
140G0226R0008
NAICS
238220
PSC
N041
Posted
June 15, 2026
Response due
June 30, 2026
What this opportunity is
The Department of the Interior is soliciting bids for the replacement of a hydronic boiler at the U.S. Army Corps of Engineers' Upper Mississippi River Restoration Program's headquarters in Urbana, Illinois. This opportunity is suitable for small businesses that specialize in plumbing, heating, and air conditioning contractors. As a solicitation, bidders will need to submit a formal bid package to be considered for the contract.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Scope of Work
Hydronic System Upgrades
GENERAL INFORMATION
Introduction The Department of the Interior (DOI), U.S. Geological Survey (USGS), Upper Midwest Environmental Sciences Center (UMESC) 2630 Fanta Reed Road, La Crosse, Wisconsin 54603 requires replacement of existing hydronic boilers and installation of new standard efficiency boilers and all appurtenances.
Background: The existing facility hot water system is served by three Thermal Solutions (Model Number EVA3000BN1) 3,000,000 BTU/hr non-condensing hot water boilers. The boilers have reached the end of their useful life and are in need of replacement.
Scope: Services, construction, to provide all equipment, labor, travel, and materials (unless otherwise provided herein) necessary replace existing hydronic boilers and any required changes to new boiler venting, all piping and appurtenances complete.
REFERENCE STANDARDS: Abbreviations of standards organizations referenced in other sections are as follows:
AABC Associated Air Balance Council
ABMA American Boiler Manufacturers Association
ADC Air Diffusion Council
AGA American Gas Association
AMCA Air Movement and Control Association
ANSI American National Standards Institute
ARI Air Conditioning and Refrigeration Institute
ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AWWA American Water Works Association
AWS American Welding Society
BMS Building Management System
BACnet Building Automation Control Network
MSTP Master-Slave Token Pass
CSA Canadian Standards Association
CSD Controls and Safety Devices
CGA Compressed Gas Association
CTI Cooling Tower Institute
EPA Environmental Protection Agency
GAMA Gas Appliance Manufacturers Association
IEEE Institute of Electrical and Electronics Engineers
ISA Instrument Society of America
MCA Mechanical Contractors Association
MICA Midwest Insulation Contractors Association
MSS Manufacturer's Standardization Society of the Valve & Fitting Industry, Inc.
NBS National Bureau of Standards
NEBB National Environmental Balancing Bureau
NEC National Electric Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
SMACNA Sheet Metal and Air Conditioning Contractors' National Association. Inc.
UL Underwriters Laboratories Inc.
ASTM E814 Standard Test Method for Fire Tests of Through-Penetration Fire Stops
ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials
UL1479 Fire Tests of Through-Penetration Firestops
UL723 Surface Burning Characteristics of Building Materials
TL USGS Technical Liaison
COR Contracting Officer’s Representative
PROJECT REQUIREMENTS:
Project Submittals: Prior to construction, the Contractor shall present the proposed system layout to the TL for approval. Finished system will include venting, piping, power, instrumentation and wiring to connect new boilers complete to existing facility hydronic system. Contractor shall be responsible for connecting boiler controls to the existing Automated Logic Webctrl Building Automation System (BAS). Contractor shall install system complete, with all appurtenances fully installed per manufacturers guidelines and applicable codes to provide a complete working system.
Submit for all equipment required to complete this Requirement as a complete installed system. Mark general catalog sheets and drawings to indicate specific items being submitted and proper identification of equipment by name and/or number.
Before submitting electrically powered equipment, verify that the electrical power and control requirements for the equipment are in agreement with the existing site conditions and existing power supplied to the existing boilers and pumps. Include a statement on the shop drawing transmittal that the equipment submitted and the existing power available are in agreement.
Include wiring diagrams of electrically powered equipment.
New boilers shall meet or exceed specifications of existing boilers.
Demolition: Contractor shall demolish and remove the three existing Thermal Solutions boilers. Any existing control sensors from facility BAS to be retained for reuse.
System Requirements: System shall meet or exceed the following minimum requirements:
New Boilers: Existing boilers are Thermal Solutions EVA3000BN1) 3,000,000 BTU/hr non-condensing hot water boilers. New boilers shall match specifications of existing boilers, including but not limited to:
Boiler shall have turndown capacity 3:1 or better.
Electrical requirements matching existing boilers.
Input/Output to/from BAS.
Contractor shall be responsible for any system modifications, including but not limited to: piping, electrical and venting modifications, as needed to install new boilers.
Contractor shall furnish complete and install all piping, venting, electrical, controls and safeties according to manufacturer’s guidelines and relevant building codes.
Pumps: Contractor shall confirm that existing boiler loop pumps conform to manufacturers recommendations. If existing pumps are not in compliance with new boiler requirements, Contractor shall provide and install new pumps for each boiler that conform to each boiler requirements and manufacturer guidelines.
Venting: Contractor shall provide and install all venting. All material and work according to boiler manufacturers recommendations. Contractor shall include an electric vent stack damper on the stack outlet of each boiler sized and installed per boiler manufacturer recommendations. Stack damper shall be interlocked to the boiler start command such that the boiler shall not start unless the damper is proven open.
Electrical: Contractor shall use existing power feeds at each boiler location. All electrical work to be installed complete. Contractor is responsible …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
N--George Washington Birthplace National Monument- RE
INTERIOR, DEPARTMENT OF THE · Solicitation · due June 26, 2026
RFQ - RFQ - 19ZA6026Q0004 - FAC NEC CHILLER MAINTENANCE- FAC NEC CHILLER MAINTENANCE
STATE, DEPARTMENT OF · Solicitation · due July 20, 2026
Installation of an Engineered Fire Suppression System
DEPT OF DEFENSE · Solicitation · due June 25, 2026
J045--High Pressure Steam Piping Replacement
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 6, 2026
1698- CE Chiller Maintenance/Service Recompete
DEPT OF DEFENSE · Solicitation · due June 22, 2026
VGLZ 252018 - Repair HVAC Building 303
DEPT OF DEFENSE · Presolicitation