Navigation Obstruction Removal, Portland Harbor, Portland, ME

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W912WJ26BA014
NAICS
237990
PSC
Y1QA
Posted
July 2, 2026
Response due
June 12, 2026

What this opportunity is

The Department of Defense is soliciting bids for the removal of a navigation obstruction in Portland Harbor, Portland, Maine. This construction project is classified under NAICS 237990 and PSC Y1QA. Small businesses, particularly those with experience in underwater diving work and marine construction, may be well-suited to bid on this project. As it is a solicitation, bidders will need to carefully review the specifications and requirements outlined in the project documents, which include detailed information on work sequencing, scheduling, and quality assurance.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Solicitation Number: W912WJ26BA014 Remove Navigation Obstruction Portland Harbor, Portland, Maine Construction Solicitation and Specifications May 2026 -- 1 of 145 -- Remove Navigation Obstruction, Portland Harbor, Portland, ME PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 22 00 MEASUREMENT AND PAYMENT 01 30 00 ADMINISTRATIVE REQUIREMENTS 01 33 00 SUBMITTAL PROCEDURES 01 33 29 SUSTAINABILITY REPORTING 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 QUALITY CONTROL 01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 54 50 MARINE PLANT AND EQUIPMENT 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 01 71 23 FIELD ENGINEERING 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL DIVISION 02 - EXISTING CONDITIONS 02 41 00 NAVIGATION OBSTRUCTION REMOVAL AND DISPOSAL DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION 35 25 00 UNDERWATER DIVING WORK -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 -- 2 of 145 -- Remove Navigation Obstruction, Portland Harbor, Portland, ME SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.1 PROJECT LOCATION AND DESCRIPTION 1.2 PERIOD OF PERFORMANCE 1.3 SITE PHOTOGRAPHS AND SURVEY INFORMATION 1.4 REFERENCES 1.5 SUBMITTALS 1.6 SAFE HARBOR PLAN 1.7 PROJECT SITE CONDITIONS 1.7.1 Physical Data 1.8 SUPERINTENDENCE BY THE CONTRACTOR 1.9 WORK SEQUENCING AND SCHEDULING 1.9.1 Hours of Operations 1.9.2 Work Restrictions 1.9.3 Notification of Sturgeon Strikes 1.9.4 Work Sequence 1.9.4.1 General 1.9.4.2 Initial Project Schedule 1.9.4.3 Periodic Schedule Updates 1.9.4.4 Weekly Progress Meetings 1.9.4.5 Scheduling 1.9.5 Rate of Progress 1.10 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES 1.11 CONTRACTOR USE OF PREMISES 1.11.1 General 1.11.2 Access to the Site and Storage/Staging Areas 1.11.3 Temporary Facilities and Utilities, and Storage Areas 1.11.4 Work Limits 1.11.5 Government Access to Work Site 1.11.6 Protection and Security 1.11.7 Work By Other Contractors 1.11.8 Emergency Contacts 1.11.9 Damaged Property 1.11.10 Contractor's Receipt of Supplies 1.11.11 Daily Clean Up 1.11.12 Littering 1.11.13 Government Sanitary Facilities 1.12 QUALITY ASSURANCE 1.13 COORDINATION 1.13.1 Notice to Mariners 1.13.2 Aids to Navigation 1.13.3 Points of Contact 1.14 GENERAL SAFETY REQUIREMENTS 1.14.1 General 1.14.2 Contractor's Project Superintendent 1.15 ENVIRONMENTAL PROTECTION 1.16 PRECONSTRUCTION CONFERENCE 1.17 PRECONSTRUCTION SURVEY PROCESS MEETING PART 2 PRODUCTS SECTION 01 11 00 Page 1 -- 3 of 145 -- Remove Navigation Obstruction, Portland Harbor, Portland, ME PART 3 EXECUTION -- End of Section Table of Contents -- SECTION 01 11 00 Page 2 -- 4 of 145 -- Remove Navigation Obstruction, Portland Harbor, Portland, ME SECTION 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.1 PROJECT LOCATION AND DESCRIPTION The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications. The work of this project involves removal of a navigation obstruction from the Federal Channel in Portland, Maine. Works includes mobilization and demobilization of marine plant and equipment as necessary, removal of the navigation obstruction from the channel and from the water, and disposal of the obstruction at a land location secured by the Contractor and certified to accept disposal. The obstruction designated for removal appears to be a wood and metal piling with fendering in place. The pile is embedded at an angle in the channel bottom, with the high end reaching elevation -30.8 feet MLLW in the -35 foot MLLW deep channel. Approximately 32 feet of the pile is exposed above the mudline of the channel bottom. The full length of the pile is unknown. The intact fendering is at the mudline. The wood of the pile is anticipated to have been creosote-treated. The objective of the pile removal is to remove the full length of the pile, from above the mudline and below, from the water and handle, transport and dispose of the pile and associated items at a land location in accordance with Federal, state, and local laws, rules, and regulations pertaining to handling, transportation and disposal of creosote-treated materials. The Contractor must confirm the removal of the piling with photographic evidence at the channel bottom in the location of the pile removal. If, in the opinion of the Contracting Officer, the Contractor has shown that removal of the full pile is not possible after attempts at full removal have failed, the pile may be cut below elevation -35.5 feet MLLW with the portion below -35.5 feet MLLW remaining in place. The pile above -35.5 feet MLLW shall be removed and disposed of as stated above. The Contractor shall perform the work in strict accordance with the contract drawings and specifications and provide all supervision, plant, labor, materials, equipment, safety, and quality control necessary to perform all operations as necessary to accomplish the work, complete. The Contractor is responsible for providing and utilizing appropriate plant and equipment to remove and dispose of the navigation obstruction. 1.2 PERIOD OF PERFORMANCE The period of performance is defined in the SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The period of performance includes all work defined by this project. 1.3 SITE PHOTOGRAPHS AND SURVEY INFORMATION Attached at the end of the specification document are photographs and SECTION 01 11 00 Page 1 -- 5 of 145 -- Remove Navigation Obstruction, Portland Harbor, Portland, ME other survey information of the navigation obstruction taken at the project site during recent site investigations. The photographs and surve

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)