New CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
W50S9326QA011
NAICS
237130
PSC
J059
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 21, 2026
Response due
August 5, 2026
Place of performance
Carolina, PR
Description
CUI
CUI
CUI
PUERTO RICO AIR NATIONAL GUARD
FIBER OPTIC INFRASTRUCTURE
INSTALLATION FOR NEW
COMMUNICATIONS FACILITY
SCOPE OF WORKS
-- 1 of 15 --
Fiber Optic Infrastructure Installation for New Communications Facility
2
CUI
CUI
1.0 General.
1.1. Scope. Perform communications infrastructure installation for the new Communications Squadron facility.
The Contractor shall provide all personnel, labor, equipment, tools, materials, supervision, and quality control
necessary, except as specified in Section 4.0 as Government Furnished, to engineer, install, terminate and test new
and augmented fiber optic infrastructure as specified herein. The overall objective is to connect the new CS facility
to key buildings across the installation, providing both new primary and redundant connectivity at Muñiz Air
National Guard Base, Carolina Puerto Rico 00979, as defined in this SOW.
1.2. Background. The 156th Wing's primary network core node, located in Building 5, must be relocated as the
building has been condemned to be demolished. A new, purpose-built Communications Squadron (CS) facility has
been constructed to serve as the new primary service delivery point for the installation. This project is a mission-
essential action to establish the necessary fiber optic pathways to make the new CS facility fully operational and
ensure the continuity of all base network operations.
1.3. Period of Performance (PoP). The Period of Performance shall not be more than sixty calendar days (60)
starting from receipt of award to include final inspections and acceptance. Extensions to the Period of Performance
may be granted if supply chain constraints are evidenced and formally submitted to the Government.
2.0 General Requirements.
2.1. Quality Control (QC). The Contractor should develop and maintain an effective Quality Control Plan (QCP)
to ensure services are performed in accordance with this SOW. The Contractor shall develop and implement
procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is how it
assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall
develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements
Summary and Technical Exhibit 2. After acceptance of the QCP, the Contractor shall obtain from the Contracting
Officer’s (KO) acceptance in writing of any proposed changes to its QCP.
2.2. Quality Assurance (QA). The Government shall evaluate the Contractor’s performance under this contract in
accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government must do to ensure that the Contractor has performed in accordance with the performance standards. It
defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality
level(s) (defect rate(s)).
2.3. Recognized Holidays. The following are recognized US holidays. The Contractor shall not perform services
on these days:
• January 1, 2026 - New Year’s Day
• January 20, 2026 - Martin Luther King, Jr.’s Birthday
• February 17, 2026 - President’s Day
• May 25, 2026 - Memorial Day
• July 3, 2026 - Independence Day
-- 2 of 15 --
Fiber Optic Infrastructure Installation for New Communications Facility
3
CUI
CUI
• September 7, 2026 - Labor Day
• October 12, 2026 - Columbus Day
• November 11, 2026 - Veteran’s Day
• November 28, 2026 - Thanksgiving Day
• December 25, 2026 - Christmas Day
2.4. Place and Performance of Services. Performance shall be at Muñiz Air National Guard Base, Carolina,
Puerto Rico. The base is accessible for Contractor work from 0600 to 1800, Monday through Friday; however, the
Government client and Point of Contact (POC) are only available between the hours of 0730 to 1600, Monday
through Friday, except on recognized US holidays or when the installation is closed due to local or national
emergencies. The Contractor shall always maintain an adequate workforce for the uninterrupted performance of all
tasks defined within this SOW when the Government facility/installation is not closed for the above reasons. When
hiring personnel, the Contractor should keep in mind that stability and continuity of the work force are essential.
Telecommuting is not authorized.
2.5. Security Requirements. The Contractor shall comply with all applicable installation/facility access and local
security policies and procedures, which may be obtained from the contract Point of Contact (POC). The Contractor
shall also provide all information required for background checks to meet installation access requirements to be
accomplished by installation Security Forces Squadron and the Director of Emergency Services. The Contractor
shall ensure compliance with all personal identity verification requirements as directed by DOD, HQDA and/or
local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in
Contractor security matters or processes.
2.6. Unscheduled gate closures by the Security Forces may occur at any time causing all personnel entering or
exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not
compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search
pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in
the termination of the Contractor employee’s installation driving privileges.
2.7. The Contractor’s employees shall become familiar with and obey the regulations of the installation, including
fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter
restricted areas when required to do so and only upon prior approval. All contract employees shall always carry
proper identification with them. The Contractor shall ensure compliance with all regulation…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237130)
178th Wing Base Microgrid Construction
DEPT OF DEFENSE · Solicitation · due August 14, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
XUMU 20260001 OSP Oak Mountain Fiber Relocation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 21, 2026
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 27, 2026
U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID
DEPT OF DEFENSE · Solicitation · due July 31, 2026
Eareckson Air Station Container Tower
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 25, 2026