What this opportunity is
The Department of Defense is seeking a contractor for road maintenance at the Oahe Dam in South Dakota, under the NAICS code 237310. This opportunity is set aside for total small businesses, making it suitable for small contractors with relevant experience in construction and maintenance. Interested bidders should note that the solicitation is available for tracking and submission, and they must provide their bids in either Excel or Word format as specified in the solicitation documents.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
(For Construction Contract)
Solicitation Number W9128F26BA019
____________________________________________________________
IDCC Road
Maintenance 2026
Oahe Dam, SD
April 2026
US Army Corps
of Engineers
Omaha District
-- 1 of 282 --
This page was intentionally left blank for duplex printing.
-- 2 of 282 --
Oahe IDCC Road Maintenance 2026 - Oahe Dam, South Dakota OA00124
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 12 00 CONSTRUCTION GENERAL
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 41 26.01 24 (SOUTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 36.13 ASPHALTIC SEAL AND FOG COATS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 92 19 SEEDING
32 97 00.00 24 CRUSHING ASPHALT MIX MATERIAL
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
-- 3 of 282 --
This page was intentionally left blank for duplex printing.
-- 4 of 282 --
Oahe IDCC Road Maintenance 2026 - Oahe Dam, South Dakota OA00124
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.1.2.1 SPECIFICATIONS
1.2 OCCUPANCY OF PREMISES
1.3 EXISTING WORK
1.4 LOCATION OF UNDERGROUND UTILITIES
1.5 WORK SCHEDULING
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
-- 5 of 282 --
Oahe IDCC Road Maintenance 2026 - Oahe Dam, South Dakota OA00124
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
The following paragraphs describe the required work. The description of
the work in this section is abbreviated with the details provided in the
technical sections. The technical specifications are arranged by the
Construction Specifications Institute (CSI) numbering system, which does
not correspond with sequence in which the work has to be accomplished.
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
This section covers the technical specification to provide all labor,
materials, incidentals, and equipment to perform the work required to
maintain and improve roads in the areas around the Oahe Project in the
vicinity of the Oahe Dam near Pierre, SD. This list is a general summary
of the required work and is not all inclusive:
1.1.2 Location
The Oahe Project is located approximately 7 miles north of Pierre, SD.
The area included in this IDCC includes the general area of the Oahe Dam
and is outlined in the location map.
The exact locations will be as shown on drawings or by the Contracting
Officer's Representative.
1.1.2.1 SPECIFICATIONS
TECHNICAL SPECIFICATIONS LISTED BELOW COVER THE POTENTIAL REQUIRED TYPES
OF WORK:
00 10 00 Bid Schedule
01 11 00 Summary of Work
01 30 00 Administrative Requirements
01 33 00 Submittal Procedures
01 35 26 Governmental Safety Requirements
01 45 00.00 10 Quality Control
01 57 20.00 10 Environmental Protection
31 00 00 Earthwork
31 05 19 Geotextile Fabric
32 01 16.17 Cold Milling of Bituminous Pavements
32 01 17.16 Sealing of Cracks in Bituminous Pavements
32 11 23 Graded-Crushed Aggregate
32 12 11 Bituminous Surface Treatment
32 12 16 Hot Mix Asphalt
32 16 13 Concrete Sidewalks and Curbs and Gutters
32 17 24.00 10 Pavement Markings
32 92 19 Seeding
32 97 00.00 24 Crushing Asphalt Mix Material
33 40 00 Storm Drainage Utilities
SECTION 01 11 00 Page 2
-- 6 of 282 --
Oahe IDCC Road Maintenance 2026 - Oahe Dam, South Dakota OA00124
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this
Contract.
Before work is started, the Contractor shall arrange with the Contracting
Officer a sequence of procedure, means of access, space for storage of
materials and equipment, and use of approaches, corridors, and stairways.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation,
Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent
injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been
altered during construction operations to match existing or
adjoining work, as approved by the Contracting Officer. At the
completion of operations, existing work shall be in a condition
equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Scan the construction site with electromagnetic or sonic equipment, and
mark the surface of the ground, pier deck or paved surface where existing
underground utilities are discovered. Verify the elevations of existing
piping, utilities,and any type of underground or encased obstruction not
indicated to be specified or removed but indicated or discovered during
scanning in locations to be traversed by piping, ducts, and other work to
be conducted or installed.
Notify the Contracting Officer at least 48 hours prior to starting
excavation work.
1.5 WORK SCHEDULING
Contract work will be limited to the hours of 7 AM to 5 PM - Monday thru
Friday. No work will be permitted on Saturday, Sunday, or Federal
Holidays. Any work to be performed outside…