What this opportunity is
The Department of Homeland Security is buying overhaul services for pumps and valves used on HC-130H and HC-130J aircraft, which suits businesses with experience in aviation logistics and component repair, as indicated by the NAICS code 336413. This is a combined synopsis and solicitation, meaning businesses should track the opportunity closely as it proceeds directly to solicitation. The contract requires the contractor to return components in an airworthy condition, with firm fixed pricing for overhaul at a fully burdened rate.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK -- Overhaul
Page 1 of 10 Rev. 8/23/2024
STATEMENT OF WORK (SOW)
FOR OVERHAUL
1.0 GENERAL
1.1 BACKGROUND
The U.S. Coast Guard (USCG) Aviation Logistics Center (ALC) requires overhaul services for the
applicable Part Numbers (P/N), National Stock Numbers (NSN), and quantity estimates as specified on
the Schedule of Supplies/Services (Schedule). The Contractor shall be required to overhaul components
to be returned to USCG in a ready for issue (RFI) condition per section titled Applicable Documents.
The Long Range Surveillance Product Line Division (LRS) supports the HC-130H and HC-130J aircraft
by providing logistics, inventory management, and sustainment support for USCG aviation assets utilized
by Air Stations geographically located in and outside the continental United States. As part of this
responsibility, the LRS has a requirement for sustainment of numerous components used on the aircraft.
1.2 SCOPE
All overhaul actions shall be In Accordance With (IAW) the applicable technical directive or alternate
standard approved in writing by USCG LRS Contracting Officer. Components furnished hereunder shall
be returned by the Contractor in an airworthy condition and in all respects suitable for installation on the
HC-130H and HC-130J aircraft. Certification and documentation requirements apply.
Firm fixed pricing for overhaul shall be at a fully burdened rate. The Contractor shall supply all parts,
labor, and materials required to restore these components to a Ready for Issue (RFI) condition.
Incorporation of Service Bulletins (SB) or repairs for Unusual Damage will be priced separately.
The technical requirements in the SOW are identified as the minimum acceptable standards of
performance to define an operationally effective system. The Contractor must have access to the
applicable technical directives cited in paragraph titled Applicable Documents. In addition to these
directives, the Contractor must have access to all performance/test/acceptance criteria and necessary data
to ensure the items specified in the Schedule are overhauled, calibrated, and operating IAW the applicable
technical directives.
The work required by this SOW is not limited to the installation of overhaul kits. The work shall
include repair of all failed components and include replacement of missing hardware, broken parts,
and the removal of any foreign matter or corrosion.
1.3 OBJECTIVE
This purchase order will provide an acquisition vehicle for the USCG to maintain an inventory of RFI
components to supply depot level maintenance and the field units. It will continue to enhance the USCG’s
ability to perform the congressionally mandated missions such as search and rescue, law enforcement,
international ice patrol, marine environmental protection, and marine resource conservation. With such a
demanding operational tempo, aircraft condition and availability are essential to mission success.
**Remainder of Page Left Intentionally Blank**
-- 1 of 10 --
STATEMENT OF WORK -- Overhaul
Page 2 of 10 Rev. 8/23/2024
1.4 Contractor Facility Certifications
The Contractor shall be either a FAA Overhaul Facility or OEM Certified Overhaul Facility or OEM
Certified Distributor or DoD Certified Overhaul Facility to perform overhaul services on the components
listed in the Schedule.
1.4.1 FAA-Certified Facility
To demonstrate that the Contractor is properly certified by the FAA, the Contractor must submit their
repair station certificate. If the Contractor holds a limited rating, the Contractor must also submit: 1) a
capabilities list identifying the relevant part numbers specified on the schedule of services IAW 14
CFR 145.215, and 2) a self-evaluation affirming that the repair station has all of the housing,
facilities, equipment, material, technical data, processes, and trained personnel in place to perform the
work on the articles identified in the schedule of services IAW 14 CFR 145.215. At the request of the
Contracting Officer, the Contractor may be required to submit a copy of the repair station manual and
quality control manual.
1.4.2 OEM Certified Facility
To demonstrate that the Contractor is certified by the OEM, the Contractor must submit
documentation from the OEM stating that the Contractor is certified to perform the services required
herein. This documentation must specifically identify the part numbers identified in the Schedule.
Otherwise, the Contractor must provide an OEM point of contact that will allow the USCG to
independently verify the Contractor is, in fact, certified by the OEM to repair the components listed
on the Schedule.
1.4.2.1 OEM Certified Distributor
To demonstrate that the Contractor is certified by the OEM as an authorized distributor of the
components for the purpose of administrating contractual agreements between OEM and the USCG,
the Contractor shall provide documentation specifically identifying the components listed on the
schedule, which shall be repaired or overhauled as required by the SOW at the OEM facility.
Otherwise, the Contractor must provide an OEM point of contact that will allow the USCG to
independently verify the Contractor is, in fact, certified by the OEM as a distributor for components
listed on the Schedule.
1.4.3 DoD or USCG Certified Facility
To demonstrate that the Contractor is certified by a DoD service or the USCG to perform overhaul
services on the components listed on the Schedule, the Contractor must provide a signed repair source
approval memo indicating the Contractor is approved to repair the components listed on the Schedule.
1.4.4 Changes Affecting Contractor Certification
If during the period of performance of the contract, the Contractor’s certification status changes (e.g.
the FAA suspends the repair station’s certificate), the Contractor shall immediately notify the USCG
and this may be grounds for contract termination. The USCG will review the circumstances affecting
the certification status and make a final determination. The USCG retain…
Source: SAM.gov, as posted. Verify the current solicitation before responding.