Paint and Lights Bldg 102 & Bldg 110

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S6T26QA027
NAICS
238320
PSC
N080
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
July 17, 2026
Place of performance
Fresno, CA

What this opportunity is

The Department of Defense is seeking a contractor for painting and lighting upgrades in two buildings located in California, specifically targeting small businesses through a total small business set-aside. The project involves painting approximately 7,500 square feet of interior space and replacing incandescent light bulbs with LED fixtures. Interested contractors should note that a site visit is recommended but not mandatory, and they must complete a base access form to attend. Quotes must be submitted electronically as outlined in the solicitation.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 CUI CUI STATEMENT OF WORK PAINT AND REPLACE LIGHTING IN B102 and 112 PROJECT NO: HAYW262012 24 March 2026 144TH FIGHTER WING CALIFORNIA AIR NATIONAL GUARD, FRESNO -- 1 of 13 -- 2 CUI CUI TABLE OF CONTENTS 1.0 GENERAL SCOPE OF WORK ............................................................................................................................. 3 2.0 SITE OF WORK ...................................................................................................................................................... 3 3.0 PROJECT REQUIREMENTS................................................................................................................................ 3 4.0 MATERIAL SUBMITTALS ................................................................................................................................... 5 5.0 GENERAL REQUIREMENTS............................................................................................................................... 5 6.0 CLOSEOUT DOCUMENTATION ........................................................................................................................ 8 7.0 DEFINITIONS ......................................................................................................................................................... 8 8.0 ACRONYMS ............................................................................................................................................................ 9 9.0 APPLICABLE PUBLICATIONS ......................................................................................................................... 10 10.0 APPLICABLE FORMS ....................................................................................................................................... 10 TECHNICAL EXHIBIT I ........................................................................................................................................... 12 -- 2 of 13 -- 3 CUI CUI 1.0 GENERAL SCOPE OF WORK This Statement of Work (SOW) defines the requirements for a contract to provide all labor, materials, and equipment necessary to prepare and paint the interior surfaces and upgrade the lighting in Building 102 and Building 110, located at Fresno Air National Guard. The work encompasses two distinct areas: interior office space and main shop areas, each with specific requirements. The contractor shall furnish all supervision, labor, materials, equipment, and transportation necessary to complete the interior painting and lighting replacement project as detailed below. The work shall be performed in strict accordance with this SOW and all applicable regulations. Total Project Scope: Painting: Building 102: • Office Wall Space: 1,995 sft* • Shop Wall Space: 3,940 sft* Building 110: • Shop Wall Space: 1,530 sft* Lighting Upgrade: • Replacement of all interior incandescent lightbulbs with new LED bulbs in both Building 102 and Building 110, including all office and shop areas. Total Wall Space: • Total Office Wall Space: 1,995 sft* • Total Shop Wall Space: 5,470 sft* *All areas are approximate. The contractor must verify all dimensions and quantities in the field before submitting a bid or starting work. 2.0 SITE OF WORK All work will occur at the: 144th Fighter Wing - Fresno Air National Guard Base 5323 McKinley Ave Fresno, CA 93727 -- 3 of 13 -- 4 CUI CUI 3.0 APPLICABLE DOCUMENTS The following documents are mandatory for this project and are incorporated by reference into this SOW. The latest version of these documents at the time of contract award shall be used. Document Number Title Air National Guard Engineering Technical Letters (ANGTEL) ANGETL 24-02 Air National Guard Design Objectives and Procedures ANGETL 24-01-03 Fire Protection Design Guidance ANGETL 24-01-05 Electrical and Communications Engineering ANGETL 15-01-01 Sustainable Design, Development, and Resource Conservation Unified Facilities Criteria (UFC) UFC 1-200-01 General Building Requirements UFC 3-120-10 Interior Design UFC 3-530-01 Interior and Exterior Lighting Systems and Controls Unified Facilities Guide Specifications (UFGS) UFGS 09 90 00 Paints and Coatings UFGS 26 51 00 Interior Lighting Air Force Publications AFMAN 32-1084 Facility Requirements Standards -- 4 of 13 -- 5 CUI CUI 4.0 GENERAL REQUIREMENTS 4.1 Investigative Services & Personnel Qualifications • Investigate Scope of Services: The contractor shall visit the site to determine the appropriate services for the proposal, meet with the owner, share observations of existing conditions, and submit a proposal. • Technical Competence: Contractor shall provide proof of technical competence and experience, including training certificates, accreditations, and references. • Personnel Qualifications: Contractors must ensure that all personnel are fully trained, licensed, certified, and otherwise qualified to provide services. 4.2 Pre-Construction Conference • The Contractor shall attend a Pre-Construction Conference, scheduled after award and prior to the Notice to Proceed (NTP). The project manager and site superintendent must attend. • The Contractor must provide the following documents prior to the NTP: • Project Schedule • Site Superintendent Letter of Appointment • SF 1413 – Subcontractor Statement and Acknowledgement (if applicable) • Notification of Compliance with Contract Insurance Requirements • Contract Schedule of Values • Safety Plan & Quality Control Plan • Material Submittals & Material Safety Data Sheets (if applicable) 4.3 Access and Security • General Policy: The contractor shall comply with all installation access and security policies, including regulations for fire, traffic, and safety. • Base Access: Base security requires all personnel to be cleared for access. The contractor will provide all necessary PII for background checks (NCIC-III and TSDB) using the WG Form and DBIDS Pre-Enrollment application at least ten working days pr

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238320)