The Department of Defense is seeking a contractor for painting and lighting upgrades in two buildings located in California, specifically targeting small businesses through a total small business set-aside. The project involves painting approximately 7,500 square feet of interior space and replacing incandescent light bulbs with LED fixtures. Interested contractors should note that a site visit is recommended but not mandatory, and they must complete a base access form to attend. Quotes must be submitted electronically as outlined in the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
CUI
CUI
STATEMENT OF WORK
PAINT AND REPLACE
LIGHTING IN B102 and 112
PROJECT NO: HAYW262012
24 March 2026
144TH FIGHTER WING
CALIFORNIA AIR NATIONAL GUARD, FRESNO
-- 1 of 13 --
2
CUI
CUI
TABLE OF CONTENTS
1.0 GENERAL SCOPE OF WORK ............................................................................................................................. 3
2.0 SITE OF WORK ...................................................................................................................................................... 3
3.0 PROJECT REQUIREMENTS................................................................................................................................ 3
4.0 MATERIAL SUBMITTALS ................................................................................................................................... 5
5.0 GENERAL REQUIREMENTS............................................................................................................................... 5
6.0 CLOSEOUT DOCUMENTATION ........................................................................................................................ 8
7.0 DEFINITIONS ......................................................................................................................................................... 8
8.0 ACRONYMS ............................................................................................................................................................ 9
9.0 APPLICABLE PUBLICATIONS ......................................................................................................................... 10
10.0 APPLICABLE FORMS ....................................................................................................................................... 10
TECHNICAL EXHIBIT I ........................................................................................................................................... 12
-- 2 of 13 --
3
CUI
CUI
1.0 GENERAL SCOPE OF WORK
This Statement of Work (SOW) defines the requirements for a contract to provide all labor,
materials, and equipment necessary to prepare and paint the interior surfaces and upgrade
the lighting in Building 102 and Building 110, located at Fresno Air National Guard. The
work encompasses two distinct areas: interior office space and main shop areas, each with
specific requirements.
The contractor shall furnish all supervision, labor, materials, equipment, and transportation
necessary to complete the interior painting and lighting replacement project as detailed
below. The work shall be performed in strict accordance with this SOW and all applicable
regulations.
Total Project Scope:
Painting:
Building 102:
• Office Wall Space: 1,995 sft*
• Shop Wall Space: 3,940 sft*
Building 110:
• Shop Wall Space: 1,530 sft*
Lighting Upgrade:
• Replacement of all interior incandescent lightbulbs with new LED bulbs in both
Building 102 and Building 110, including all office and shop areas.
Total Wall Space:
• Total Office Wall Space: 1,995 sft*
• Total Shop Wall Space: 5,470 sft*
*All areas are approximate. The contractor must verify all dimensions and quantities in the field
before submitting a bid or starting work.
2.0 SITE OF WORK
All work will occur at the:
144th Fighter Wing - Fresno Air National Guard Base
5323 McKinley Ave
Fresno, CA 93727
-- 3 of 13 --
4
CUI
CUI
3.0 APPLICABLE DOCUMENTS
The following documents are mandatory for this project and are incorporated by reference
into this SOW. The latest version of these documents at the time of contract award shall be
used.
Document Number Title
Air National Guard Engineering Technical Letters (ANGTEL)
ANGETL 24-02 Air National Guard Design
Objectives and Procedures
ANGETL 24-01-03 Fire Protection Design Guidance
ANGETL 24-01-05 Electrical and Communications
Engineering
ANGETL 15-01-01 Sustainable Design, Development,
and Resource Conservation
Unified Facilities Criteria
(UFC)
UFC 1-200-01 General Building Requirements
UFC 3-120-10 Interior Design
UFC 3-530-01 Interior and Exterior Lighting
Systems and Controls
Unified Facilities Guide Specifications (UFGS)
UFGS 09 90 00 Paints and Coatings
UFGS 26 51 00 Interior Lighting
Air Force Publications
AFMAN 32-1084 Facility Requirements Standards
-- 4 of 13 --
5
CUI
CUI
4.0 GENERAL REQUIREMENTS
4.1 Investigative Services & Personnel Qualifications
• Investigate Scope of Services: The contractor shall visit the site to determine the
appropriate services for the proposal, meet with the owner, share observations of existing
conditions, and submit a proposal.
• Technical Competence: Contractor shall provide proof of technical competence and
experience, including training certificates, accreditations, and references.
• Personnel Qualifications: Contractors must ensure that all personnel are fully trained,
licensed, certified, and otherwise qualified to provide services.
4.2 Pre-Construction Conference
• The Contractor shall attend a Pre-Construction Conference, scheduled after award and
prior to the Notice to Proceed (NTP). The project manager and site superintendent must
attend.
• The Contractor must provide the following documents prior to the NTP:
• Project Schedule
• Site Superintendent Letter of Appointment
• SF 1413 – Subcontractor Statement and Acknowledgement (if applicable)
• Notification of Compliance with Contract Insurance Requirements
• Contract Schedule of Values
• Safety Plan & Quality Control Plan
• Material Submittals & Material Safety Data Sheets (if applicable)
4.3 Access and Security
• General Policy: The contractor shall comply with all installation access and security
policies, including regulations for fire, traffic, and safety.
• Base Access: Base security requires all personnel to be cleared for access. The
contractor will provide all necessary PII for background checks (NCIC-III and TSDB) using
the WG Form and DBIDS Pre-Enrollment application at least ten working days pr…