Paint and Repairs IDIQ
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W911S7-26-B-A006
NAICS
238320
PSC
Z2AZ
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 1, 2026
Response due
August 6, 2026
Place of performance
Fort Leonard Wood, MO
Description
PAINTING AND REPAIRS IDIQ
FORT LEONARD WOOD and LAKE OF THE OZARKS RECREATION AREA (LORA), MO
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 33 00 Submittals
DIVISION 2 - SITEWORK
02 41 00 Demolition
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 92 00 Caulking and Sealants
DIVISION 9 - FINISHES
09 23 00 Gypsum wallboard
09 51 00 Acoustical treatment
09 72 00 Wall Coverings
09 90 00 Painting, General
DIVISION 12 - FURNISHINGS
12 21 00 Window Blinds
-- 1 of 38 --
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
1. DESCRIPTION OF WORK:
1.1. Work to be Accomplished: The work consists of furnishing all
plant, labor and materials and performing all work in strict accordance
with these specifications as hereinafter described.
1.2. Location: The site of the proposed work is on the Fort Leonard
Wood Military Installation, Fort Leonard Wood, Missouri and Lake of the
Ozarks Recreation Area (LORA), Camden County, Missouri.
2. PRINCIPAL FEATURES: Work to be performed will include, but will not be
limited to painting and repairs in accordance with (IAW) the attached Task
Lists and specifications. This contract will be a delivery order style
contract. All work required shall be on a requirement basis as directed by
the Contracting Officer on a delivery order.
3. SEQUENCE OF WORK:
3.1. Occupied Buildings: The area concerned in this project is
Government owned and will be in use during the course of this project.
The Contractor shall arrange his operations to cause as little
interference as possible to the users and to adjacent buildings, or
other activities.
3.2. Schedule:
3.2.1. The Contractor shall schedule all activity at the job site
through the DPW Contract Inspection Branch a minimum of 24 hours
in advance of work. The Contract shall not be on site without
prior notification to the DPW Inspection Branch.
3.2.1.1. Unaccompanied Military Personnel Quarters: The
Contractor shall complete painting and repair work in
unaccompanied military personnel quarters within three (3)
consecutive work days. The time allowed for completion of
work required in each set of quarters will begin at 0730
hours the work day following requirement receipt.
3.2.1.2. Other Buildings: Interior painting and repairs in
all other buildings shall be completed within the time
indicated on the applicable delivery order.
3.2.2. Contractor shall schedule his working hours to coincide
with the working hours of the military reservation. Normal
working hours of the reservation are 7:30 a.m. to 4:00 p.m.,
Monday thru Friday, legal public holidays excepted. The
Contractor shall not perform work on the reservations beyond the
aforementioned working hours without the written approval of the
Contracting Officer.
-- 2 of 38 --
01 11 00 - 2
3.2.3. If the Contractor, for his convenience, desires to perform
work during other than normal working hours or on other than
normal workdays, he shall notify the Contracting Officer and the
Directorate of Public Works Inspection Branch at least 72 hours
in advance. The Contractor shall not perform work beyond the
normal working hours or normal workdays without written approval
of the Contracting Officer and the DPW Inspection Branch. The
Contractor shall reimburse the Government for any additional
expense occasioned the Government thereby, such as, but not
limited to, overtime pay for Government inspectors, utilities
service, etc.
3.2.4. Time extensions due to adverse weather, increase in scope
of work (SOW), or material lead time, must be received in writing
prior to scheduled completion date.
3.3. Inspection:
3.3.1. Prior to requesting inspection, the Contractor shall
ensure that all trash and disposal materials have been removed
from the worksite and the worksite is in a condition considered
to be satisfactorily clean to the Contracting Officer. When the
Contractor deems all required work in a single building to have
been completed, the Contractor shall notify the Inspection Branch
and Contracting Officer in writing to schedule a joint inspection
of the completed building.
3.3.2. Deficiencies: If the DPW Inspector finds the work to be
satisfactorily completed within the time allowed, except for
minor deficiencies, the Contractor will be given a written
deficiency list that shall be satisfactorily corrected. A copy of
the written deficiency list shall be provide to the Contracting
Officer.
3.4. Responsibility of the Contractor:
3.4.1. In unoccupied facilities, the Contractor shall be
responsible for the security of the facility; i.e., all exterior
doors shall be locked, windows closed and locked, etc. The
Contractor shall take all possible precautions to maintain the
work site, at all times, in a condition that will prevent damage
or injury to person or property, Government or otherwise. The
Contractor shall be responsible for all damages caused by the
negligent acts or omissions of his employees, sub-contractors, or
agents during Contract performance.
3.4.2. The Contractor shall be responsible for movement and
protection of Government owned furnishings in quarters during
Contract performance. The Contractor shall be responsible for all
damages caused by the negligent acts or omissions of his
employees, sub-contractors, or agents during Contract
performance.
-- 3 of 38 --
01 11 00 - 3
3.4.3. Any damages caused by negligence on the part of the
Contractor or his/her agents, employees or subcontractors, shall
be repaired by the Contractor at no cost to the Government and to
the complete satisfaction of the Contracting Officer.
4. WORK SITE HOUSEKEEPING AND CLEANING:
4.1. The Contractor shall remove all trash and disposal material from
the worksite before the end of each day, to the extent it is consistent
with standard construction practices on Government work sites. The
Contractor shall take all possible precautions to maintain the work
site, at all times, in a condition that will prevent damage or injury
to person or property, Government or otherwise. The a…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238320)
Z1DZ--531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 124, 120
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due July 21, 2026
Utility Building Exterior & Interior Wall Repairs
STATE, DEPARTMENT OF · Solicitation · due July 27, 2026
KES Enclosure Painting services
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026
Carson National Fish Hatchery Quarters 4 Interior
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due August 22, 2026
Sustain Hangar Doors, Multi
DEPT OF DEFENSE · Solicitation · due July 31, 2026
Z1DZ--531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 124, 120
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation