Sustain Hangar Doors, Multi

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA663326Q0006
NAICS
238320
PSC
Z1EB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 20, 2026
Response due
July 31, 2026
Place of performance
Minneapolis, MN

Description

Sustain Hangar Doors, Multi QJKL260019 SECTION 01 11 00 SUMMARY OF WORK 02/24 PART 1 GENERAL 1.1 SUBMITTALS Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals 1.2 WORK COVERED BY CONTRACT DOCUMENTS 1.2.1 Project Description The work includes furnishing of all labor, materials, and equipment and performance of all work to sustain hangar door paint and incidental related work on buildings 821 and 870, in accordance with the contract drawings and specifications. 1.2.2 Location The work is located at the 934th Airlift Wing, approximately as indicated. The exact location will be shown by the Contracting Officer. 1.3 OCCUPANCY OF PREMISES Building(s) will be occupied during performance of work under this Contract. Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. 1.4 EXISTING WORK Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used. SECTION 01 11 00 Page 1 Revision 1 07-13-2026 -- 1 of 64 -- Sustain Hangar Doors, Multi QJKL260019 -- End of Section -- SECTION 01 11 00 Page 2 Revision 1 07-13-2026 -- 2 of 64 -- SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES Sustain Hangar Doors, Multi 01 33 00 SD-01 Preconstruction Submittals 1.7 G Submittal Register 01 74 19 SD-01 Preconstruction Submittals 1.5 G Construction Waste Management Plan SD-11 Closeout Submittals 1.7 G Final Construction Waste Diversion Report 02 83 00 SD-01 Preconstruction Submittals 1.5.1.1 G Competent Person 1.5.1.2 G Training Certification 1.5.2.6 G Lead Waste Management Plan 1.5.2.2 G Lead Compliance Plan 3.4.2.1 G Written Evidence of TSD Approval SD-11 Closeout Submittals 3.4.2.1 G Hazardous Waste Manifest 3.4.2.1 G Turn-In Documents or Weight Tickets 09 90 00 SD-03 Product Data 2.1 Product Data Sheets SD-04 Samples 2.2 G Color SD-08 Manufacturer’s Instructions 3.2.1 Application Instructions 2.1 Mixing SUBMITTAL REGISTER CONTRACT NO. TITLE AND LOCATION CONTRACTOR CONTRACTOR: SCHEDULE DATES CONTRACTOR ACTION APPROVING AUTHORITY A C T I V I T Y N O T R A N S M I T T A L N O S P E C S E C T DESCRIPTION ITEM SUBMITTED P A R A G R A P H # C L A S S I F I C A T I O N G O V T O R A / E R E V W R SUBMIT APPROVAL NEEDED BY MATERIAL NEEDED BY A C T I O N C O D E DATE OF ACTION DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR DATE FWD TO OTHER REVIEWER DATE RCD FROM OTH REVIEWER A C T I O N C O D E DATE OF ACTION MAILED TO CONTR/ DATE RCD FRM APPR AUTH REMARKS (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) Revision 1 07-13-2026 -- 3 of 64 -- SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES Sustain Hangar Doors, Multi 09 90 00 1.7.1 Manufacturer's Safety Data Sheets SUBMITTAL REGISTER CONTRACT NO. TITLE AND LOCATION CONTRACTOR CONTRACTOR: SCHEDULE DATES CONTRACTOR ACTION APPROVING AUTHORITY A C T I V I T Y N O T R A N S M I T T A L N O S P E C S E C T DESCRIPTION ITEM SUBMITTED P A R A G R A P H # C L A S S I F I C A T I O N G O V T O R A / E R E V W R SUBMIT APPROVAL NEEDED BY MATERIAL NEEDED BY A C T I O N C O D E DATE OF ACTION DATE FWD TO APPR AUTH/ DATE RCD FROM CONTR DATE FWD TO OTHER REVIEWER DATE RCD FROM OTH REVIEWER A C T I O N C O D E DATE OF ACTION MAILED TO CONTR/ DATE RCD FRM APPR AUTH REMARKS (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) Revision 1 07-13-2026 -- 4 of 64 -- Sustain Hangar Doors, Multi QJKL260019 SECTION 01 33 00 SUBMITTAL PROCEDURES 08/18, CHG 4: 02/21 PART 1 GENERAL 1.1 DEFINITIONS 1.1.1 Submittal Descriptions (SD) Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow: SD-01 Preconstruction Submittals Government approved Division 01 preconstruction submittals that are required prior to or commencing with the start of work must be submitted within 30 calendar days of contract award unless specified elsewhere in the specifications. Contractor approved Division 01 submittals that are required prior to or commencing with the start of work must be submitted within 45 calendar days of contract award unless specified elsewhere in the specifications. Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work. Certificates Of Insurance Surety Bonds List Of Proposed Subcontractors List Of Proposed Products Construction Schedule Submittal Register Schedule Of Prices Or Earned Value Report Work Plan SD-03 Product Data Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work. Samples of warranty language when the contract requires extended product warranties. SD-04 Samples SECTION 01 33 00 Page 1 Revision 1 07-13-2026 -- 5 of 64 -- Sustain Hangar Doors, Multi QJKL260019 Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics o

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238320)