Painting IDIQ Maxwell AFB and Gunter Annex 2026 - AMENDED

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA330026R0020
NAICS
238320
PSC
Z2AA
Set-aside
Economically Disadvantaged Women-Owned Small Business
Posted
August 5, 2026
Response due
August 13, 2026
Place of performance
Montgomery, AL

Description

Section 00005 Page 1 of 1 SECTION 00005 SCHEDULE OF BID ITEMS ITEM 0001: Furnish all plant, labor, materials and equipment necessary to perform all work in connection with JUBJ 24- 7621, Paint Ext, Lodging Bldg 1017, Maxwell AFB, Gunter Annex, Alabama, in accordance with the attached specifications. Item No. Description Unit of Issue Total Amount 1 Pressure Wash & Paint Building & 1017 EA $ Total Bid Items:1 $________________________ COMPANY NAME: ___________________________________ PRINTED NAME: _____________________________________ SIGNATURE: _________________________________________ DATE: ________________________________________________ -- 1 of 111 -- JUBJ 24-7621 Pressure Wash & Paint Building 1017 42 CES/CEN, MAXWELL AFB, GUNTER ANNEX ALABAMA GENERAL REQUIREMENTS 01000-1 DIVISION 1: Section 01000: General Requirements 1.0 SUMMARY OF WORK 1.1 The work covered by these specifications consists of furnishing all plant, labor, equipment and materials and performing all operations in connection with the JUBJ 24-7621 PAINT EXTERIOR, LODGING BLDG 1017 to include all areas as indicated in strict accordance with these specifications and applicable drawings and subject to terms and conditions of the contract. The work generally consists of the following: 1.2 Service provider shall perform all work in accordance with Specification Section 09900, 07120 ELASTOMERIC COATING (or equal), Maxwell LBP Protocol, Maxwell Storm Water BMPS for Latex Paint, and Maxwell Storm Water BMPs for Oil Based Paint, Polyurethane, and Cleaning Solutions. 1.3 The contractor will be responsible for removing debris from jobsite daily. The contractor must ensure that the workplace is safe from hazards so that daily operations can be maintained, and the buildings occupied during the painting/pressure washing process. The contractor is responsible for all quantities to establish bid proposals. 1.4 The service provider will work with the facility manager to coordinate work with the areas to avoid interference with necessary activities. 1.5 Protect fire alarm/ mass notification / fire suppression devices from damage during high pressure water stream during pressure washing/painting. 1.6 Service provider shall furnish all necessary equipment, materials, labor, and transportation necessary to repair, pressure wash and paint exterior building1017, including all stair/ramps, railings, retaining walls and EFIS banisters connected to building 1017. 1.7 Include all planters/retaining walls in the clock tower area. 2.0 BUILDING OCCUPANCY 2.1 Building will be occupied during construction. The Contractor shall perform the majority of work during normal working hours. 3.0 SCHEDULE OF WORK 3.1 SCHEDULING: The Contractor shall be responsible for establishing a schedule to meet construction time. Contractor shall prepare a work schedule on forms provided for schedule of work. Contractor cannot start on site without submitting an initial schedule. Contractor shall have 180 calendar days to complete the work. -- 2 of 111 -- JUBJ 24-7621 Pressure Wash & Paint Building 1017 42 CES/CEN, MAXWELL AFB, GUNTER ANNEX ALABAMA GENERAL REQUIREMENTS 01000-2 3.2 PHASING OF WORK: The work herein will be completed in one phase 4.0 GENERAL 4.1 The contractor shall coordinate work with the government to avoid interference with necessary activities within and adjacent to the construction site. The Contractor shall coordinate the work of all trades to prevent any conflicts. The Contractor, before proceeding with the construction, shall resolve any conflicts of components. 4.2 The Contractor will perform all work during work hours between 7:00 A. M. and 4:00 P.M (normal working hours). The Contractor will not normally be permitted to work on weekends or on the following legal holidays (or the day the federal government observes these holidays) unless the contractor has coordinated such work with the Technical Monitor/Contract Administrator at least 72 hours in advance: a. New Year's Day g. Labor Day b. Martin Luther King, Jr.'s Birthday h. Columbus Day c. Washington’s Birthday i. Veteran's Day d. Memorial Day e. Juneteenth j. Thanksgiving Day f. Independence Day k. Christmas Day 5.0 SITE VISIT Contractor is responsible for site investigation in accordance with the contract clause entitled "Site Investigation and Conditions Affecting the Work" (FAR 52.236-3). 6.0 CONTRACT DRAWINGS AND SPECIFICATIONS The Contractor must comply with the contract clause entitled "Specifications and Drawings for Construction" (FAR 52.236-21). See paragraph 19.01 entitled "INTENT OF DRAWINGS". 7.0 DESCRIPTIVE DATA 7.1 The Contractor shall submit three (3) copies of AF Form 3000, Material Submittal Approval, to the Contracting Officer (CO) for approval. Included shall be manufacturer's descriptive data for materials, fixtures, and equipment the Contractor proposes to incorporate in the work. The submittal shall include catalog numbers, diagrams, drawings, and additional descriptive data and samples required to properly evaluate all items. When specifications require materials to conform to Federal, Military, Commercial, American Society for Testing Materials (ASTM), or other specifications and standards, the Contractor shall submit supplier's or manufacturer's Certification of Conformance in addition to other descriptive data. Catalog numbers and trade names specified indicate examples of a standard product. Other manufacturers' products may be substituted contingent upon approval. Approval of all items must be obtained prior to fabrication or purchase. Payment for work incorporating these materials will not be made if required material submittals have -- 3 of 111 -- JUBJ 24-7621 Pressure Wash & Paint Building 1017 42 CES/CEN, MAXWELL AFB, GUNTER ANNEX ALABAMA GENERAL REQUIREMENTS 01000-3 not been approved. Approval of materials, fixtures, and equipment will be based on manufacturer's published ratings and conformance with specifications. 7.1.1 The Material Descriptive Data Sub

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238320)