PRE-SOLICITATION NOTICE- Overhaul of B1 Torque tube assembly

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
FD20302600598-1
NAICS
336413
PSC
J016
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
May 18, 2026
Response due
June 1, 2026
Place of performance
S Coffeyville, OK

What this opportunity is

The Department of Defense is seeking a contractor for the overhaul of B1 torque tube assemblies, as outlined in the presolicitation notice. This opportunity is set aside for total small businesses under NAICS 336413, making it suitable for small contractors with relevant capabilities. Interested businesses should note that this is a presolicitation notice, indicating they should track the opportunity closely for the forthcoming solicitation rather than submitting bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Appendix A PR Number: FD20302600598-00 PWS Form Rev 7: 17 DEC 2025 i DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 PR NO: FD20302600598-00 DATE: 22 December 2025 AF CONTRACT NO: XXXXX-X PERFORMANCE WORK STATEMENT (PWS) TYPE OF WORK: Overhaul of TORQUE TUBE ASSEMBLY TABLE OF CONTENTS PREFACE SHEET......................................................................................................................... iii REVISION SHEET ....................................................................................................................... iv SECTION 1 GENERAL INFORMATION .................................................................................... 1 1.1. DEFINITIONS ..................................................................................................................... 1 1.2. PRE-AWARD SURVEY REQUIREMENTS ..................................................................... 3 1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS .......................................... 3 1.4. REPORTING REQUIREMENTS........................................................................................ 4 1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS ..................... 5 1.6. SPECIAL TOOLS AND TEST EQUIPMENT ................................................................... 6 1.7. PRECIOUS METALS RECOVERY PROGRAM .............................................................. 7 1.8. NUCLEAR HARDNESS REQUIREMENTS ..................................................................... 7 1.9. PARTS CONTROL PROGRAM ......................................................................................... 7 1.10. OZONE DEPLETING SUBSTANCES ............................................................................. 8 1.11. TECHNICAL ORDER MAINTENANCE ........................................................................ 8 1.12. CONTRACTOR EMPLOYEES ........................................................................................ 9 1.13. SAFETY AND HEALTH STATEMENT ......................................................................... 9 1.14. ITEM UNIQUE IDENTIFICATION REQUIREMENTS ............................................... 10 1.15. SURGE ............................................................................................................................. 10 SECTION 2 DESCRIPTION OF WORK .................................................................................... 12 2.1. GENERAL ......................................................................................................................... 12 2.2. SPECIFIC WORK REQUIREMENTS .............................................................................. 13 2.3. DELIVERY SCHEDULE .................................................................................................. 16 SECTION 3 APPLICABLE DOCUMENTS................................................................................ 17 3.1. APPLICABLE TECHNICAL ORDERS ........................................................................... 17 3.2. OTHER PUBLICATIONS ................................................................................................. 17 3.3. CONTRACTOR DOCUMENTS ....................................................................................... 19 -- 1 of 34 -- Appendix A PR Number: FD20302600598-00 PWS Form Rev 7: 17 DEC 2025 ii SECTION 4 GOVERNMENT PROPERTY ................................................................................ 20 4.1. GOVERNMENT PROPERTY .......................................................................................... 20 4.2. DISPOSITION OF GOVERNMENT PROPERTY ........................................................... 20 4.3. OTHER............................................................................................................................... 20 SECTION 5 SERVICE SUMMARY ........................................................................................... 21 5.1. SERVICE SUMMARY...................................................................................................... 21 SECTION 6 CONSUMABLE PARTS REPLACEMENT REQUIREMENTS........................... 23 6.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS ............................. 23 SECTION 7 SUPPLY CHAIN RISK MANAGEMENT (SCRM) .............................................. 24 7.1. GENERAL ......................................................................................................................... 24 7.2. CONTINUITY OF OPERATION (COOP) ....................................................................... 24 7.3. FOREIGN INFLUENCE ................................................................................................... 25 7.4. CYBERSECURITY ........................................................................................................... 26 -- 2 of 34 -- Appendix A PR Number: FD20302600598-00 PWS Form Rev 7: 17 DEC 2025 iii PREFACE SHEET END ITEM RECEIVED AS END ITEM TO BE DELIVERED AS LINE ITEM NUMBER NATIONAL STOCK NUMBER PART NUMBER NATIONAL STOCK NUMBER PART NUMBER 0001 1680011435429RK NF53602-01B 1680011435429RK NF53602-01B -- 3 of 34 -- Appendix A PR Number: FD20302600598-00 PWS Form Rev 7: 17 DEC 2025 iv REVISION SHEET When a revision is received, it should be inserted into this Performance Work Statement (PWS). The superseded pages should be retained as a record. NOTE: The portion of text in this document affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph. After the revised pages have been inserted into the PWS, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page. DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE: PWS Fo

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336413)