Refurbish 138 KV OCB Breaker

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO

Notice type
Combined Synopsis/Solicitation
Solicitation #
FY265281014
NAICS
335313
PSC
5925
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 15, 2026
Response due
June 19, 2026
Place of performance
Del Rio, TX

What this opportunity is

The International Boundary and Water Commission is seeking quotes from small businesses to refurbish a 138 KV OCB breaker at their Amistad Field Office in Del Rio, TX. This opportunity is a total small business set-aside under NAICS code 335313, which pertains to switchgear and switchboard apparatus manufacturing. Proposals are due by June 19, 2026, and must be submitted via email; contractors are encouraged to attend a site visit before this date. The contract will be awarded to the lowest price, technically acceptable offeror based on specified criteria.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

DO NOT DELETE pages prior to cover sheet until you have saved as pdf! DELETE these pages in the pdf file only. This document is set to link to information on these preliminary pages. Jump to Table of Contents Jump to Title Page By entering the items in GREEN, you will insert these items into the document. They are referenced by style name so do not change the style. Throughout this document items in RED need to be reviewed since they are very project specific. After reviewing and changing to meet project requirements, change text to BLACK. --Remember to review the items in black too.-- Items in BLUE are references, notes, or instructions. After reading and abiding by these notes, delete items in BLUE. (RGB 0,00,254) Ignore hyperlinks. Enter the USIBWC Project associated with this work: Falcon Power Plant Style Reference: IBWC Project Enter the Project Name: Main Control Improvements Style Reference: IBWC Project Name Enter the County of the Project: Starr County Style Reference: IBWC Project County Enter the State of the Project: Texas Style Reference: IBWC Project State Is this a Solicitation, RFP, or a Contract? Solicitation Style Reference: IBWC Contract Enter applicable Contractual number: 191BWC19R**** Style Reference: IBWC Contract Num Enter Date of Document: May 3, 2019 Style Reference: IBWC Date To update the whole document, including all tables of contents, press this button. It should run a macro that will update everything.Update It may take 15 minutes to run! USUAL CHOICES FOR PROJECT Rio Grande Canalization Project Rio Grande American Canal Extension Rio Grande Rectification Project Presidio Valley Flood Control Project Lower Rio Grande Flood Control Project South Bay International Wastewater Treatment Plant Tijuana River Flood Control Nogales International Wastewater Treatment Plant Amistad Reservoir and Dam Falcon Dam and Reservoir -- 1 of 20 -- Instructions to Create the Final PDF File 1. Run the "Update" macro to ensure that all items are updated. 2. Double check that all cross references are valid. a. Click on Home, Find and enter "Error" in the search box. b. If any cross references are invalid, they will show "Error! Reference source not found." 3. Go to File, Save As and set file type to pdf. 4. Once the file type is set to pdf, an Options… box will appear. 5. Click on Options… 6. Ensure that the box next to "Create bookmarks using" is checked. Once the box is checked, the radio button next to Headings should be filled. 7. Click OK. 8. Save the file. Instructions on the use of this template are in a separate file entitled PWS Design Services Boiler Plate Instructions.docx -- 2 of 20 -- International Boundary and Water Commission United States and Mexico UnitedStatesSection Front Cover Performance Work Statement (PWS) Falcon Power Plant Refurbish 138 KV Breaker (OCB) ValverdeStarr County, Texas May 27, 2026 International Boundary and Water Commission United States and Mexico United States Section Operations and Maintenance Division -- 3 of 20 -- USIBWC Amistad Power Plant Refurbish 138 KV OCB Breaker Valverde County, Texas May 27, 2026 Performance Work Statement Page-i of ii TABLE OF CONTENTS Section 1 Project Specific Information...................................................................................................... 1 1.1 Project Overview.................................................................................................................... 1 1.2 General ................................................................................................................................... 1 1.3 Description of Services .......................................................................................................... 1 1.4 Objective ................................................................................................................................ 1 1.5 Project Location ..................................................................................................................... 1 1.6 Period of Performance............................................................................................................ 1 1.7 Investigation of Site Conditions ............................................................................................. 2 1.8 Duty to Inquire ....................................................................................................................... 3 1.9 Work Restrictions .................................................................................................................. 3 1.10 Department of Homeland Security......................................................................................... 3 Section 2 Project Requirements ................................................................................................................. 3 2.1 General ................................................................................................................................... 3 2.2 Main Controls ...................................................................... Error! Bookmark not defined. 2.3 Clean-Up and Disposal of Waste Materials ........................................................................... 5 2.4 Testing and Training .............................................................................................................. 5 2.5 Warranty................................................................................................................................. 5 Section 3 Existing Conditions..................................................................................................................... 6 3.1 General ................................................................................................................................... 6 3.2 Government Furnished Utilities ............................................................................................. 6 3.3 Use of Government Land ..........................

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 335313)