Refurbish Barrack Facilities, Buildings 4168 & 4169

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
N400857593597
NAICS
236220
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 14, 2026
Response due
August 14, 2026
Place of performance
Cherry Point, NC

What this opportunity is

The Department of Defense is soliciting a total small business set-aside contract for the refurbishment of Barrack Facilities, Buildings 4168 and 4169, at Marine Corps Air Station Cherry Point in North Carolina. The work includes multiple BEQ rehabs, painting, and incidental related work, such as removing and storing furniture, appliances, and rugs. This opportunity suits small businesses with experience in the construction industry, specifically in the NAICS code 236220. Bidders should track the solicitation, as it is a solicitation notice, and be prepared to establish and maintain safety barricades around active work areas to prevent unauthorized entry.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

REFURBISH BEQ FACILITIES; B4168, and B4169; MCAS CHERRY POINT, NORTH CAROLINA 28533-0006 WORK ORDER # 7593597 1.1 GENERAL INTENTION The work includes multiple BEQ rehabs and incidental related work. 1.2 LOCATION The work is located at B4168, and B4169, MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting Officer. 1.3 DETAILED REQUIREMENTS. Removable Furniture, Appliances INVENTORY, REMOVE, STORE, AND PROTECT EACH PIECE OF FURNITURE IN THE BUILDING. TYPICAL SLEEPING ROOM INCLUDES BUT IS NOT LIMITED TO: (2) METAL WARDROBES, (2) METAL RACKS, (2) MATTRESSES, (2) DESKS, (2) DESK CHAIRS, (2) NIGHT TABLES, AND (2) LAMPS, DORM SIZE REFRIGERATOR, MICROWAVE, RUGS, DRAPERIES, AND COMFORTERS. LOUNGE, LAUNDRY, AND DUTY FURNITURE INCLUDES BUT IS NOT LIMITED TO: (3) COUCHES, (10) CHAIRS, (12) WASHING MACHINES, (24) DRYERS, DESK, AND DESK CHAIR. INSTALL FURNITURE BACK INTO EACH ROOM WHEN CONSTRUCTION ACTIVITIES ARE COMPLETE IN THAT ROOM. Painting Paint all interior previously painted surfaces in BEQs B4168, B4166, B4167, and B4169. Painting Finish Schedule: Symbol Color Location Notes MPI Primer/ Intermediate/ Topcoat PNT-1 SW 7105 PAPERWHITE Typical walls and ceiling, Provide unless noted otherwise Walls in Semigloss finish. 149/147/147 Ceiling in Flat finish. 149/144/144 -- 1 of 19 -- PNT-2 SW 6615 PEPPERY Accent wall in Barracks Rooms See IMG-1 for accent wall location. Typical for all Barracks Rooms. Semigloss finish. 149/147/147 PNT-3 SW 6480 LAGOON Accent wall in Lounge Rooms See IMG-2 for typical accent wall location. Semigloss finish. 149/147/147 IMG – 2: Typical Lounge Room accent wall location highlighted in blue above -- 2 of 19 -- Painting Surface Area Breakdown (All numbers are approximate CTR shall field verify, the tables below cover 4168, and 4169.) The total area to be painted is as follows: Location Surface Area (sq ft) B4168 Area (sq ft) B4169 Barracks Rooms Ceilings 24,553 30,692 Walls 56,393 70,491 Bathrooms Ceilings 2,745 3,294 Walls 13,250 19,080 Laundry Rooms Ceilings 1,506 1,506 Walls 2,718 2,718 Duty Hut Ceiling 175 175 Walls 510 510 Hallways Ceilings 344 344 Walls 1,673 1,673 Lounge Ceiling 1,100 1,100 Walls 2,705 2,705 All Areas Doors 14,112 17,136 Total Area 121,784 151,424 The contractor shall establish and maintain clearly marked barricades around all active work areas to prevent unauthorized entry and ensure the safety of barracks personnel. All surfaces (walls, ceilings, and doors) must be properly prepared. This includes but is not limited to: Cleaning all surfaces to remove dirt, dust, and grease. Scraping and removing any loose or peeling paint. Patching any cracks, holes, or other imperfections. Sanding and smoothing all patched areas to blend with the surrounding surface. Protecting all floors, furniture, and fixtures from paint and debris using drop cloths and plastic sheeting. -- 3 of 19 -- A single coat of high-quality primer is to be applied to all specified surfaces to ensure proper paint adhesion and a uniform finish. Two coats of high-quality, low-VOC interior latex paint are to be applied to all specified surfaces. The paint should be applied evenly and consistently, with no drips or runs. The contractor will be responsible for daily cleanup of the work area, as well as a final, thorough cleaning upon project completion. This includes the removal of all painting materials, debris, and protective coverings from the premises. Flooring Provide Solid Vinyl Plank with the following properties: 1. Conform to ASTM F1700 Class III printed (wood grain look), Type B (embossed). Provide 4.5” x 36” planks with unbeveled edge. The flooring must include a protective urethane for ease of maintenance and conform to ASTM E648, Type III Class I. The flooring must require a no wax finish. Provide vinyl flooring that is easily cleaned with off-the-shelf products. Surface finishes requiring manufacturer supplied or special-order cleaning solutions are not acceptable. Solid vinyl planks must meet ADA slip- resistance requirements. 2. Wear layer thickness (EN 429): 40 mils minimum 3. Fire Performance a. Critical Radiant Flux (ASTM E648 and NFPA 253): > 0.45 W/cm, Class 1 b. Optical Smoke Density (ASTM E662 and NFPA 258) Non- Flaming DM Correct: < 450; Pass Solid Vinyl Plank Basis of Design: Mannington Commercial AMTICO Signature Collection AROW7510 GOLDEN OAK Provide Resilient Floor Base with the following properties: 1. Conform to ASTM F1861, Type TS (vulcanized thermoset rubber) or Type TP (thermoplastic rubber), Style B (coved – installed with resilient flooring). Provide 4” high and a minimum 1/8” thick wall base. Provide job formed corners in matching height, shape, and color. -- 4 of 19 -- Resilient Floor Base Basis of Design: Johnsonite Traditional Wall Base 47 Brown Flooring Area Breakdown The total area for flooring replacement is as follows: Location Area (sq ft) B4168 Area (sq ft) B4169 Lounge Rooms 1,100 1,100 Barracks Rooms 24,553 30,692 Laundry Room 1,506 1,506 Duty Hut 175 175 Head 3294 4206 Hallway 344 344 Total Area 27,334 33,473 Remove and dispose of all existing flooring materials, including any underlayment, tack strips, and adhesives, from the specified areas. Properly dispose of all removed materials off-site. All subfloor surfaces must be properly prepared to ensure a smooth, and solid base for the new LVP flooring. This includes but is not limited to: Thoroughly cleaning the subfloor. Grinding or sanding down any high spots. Filling any cracks, holes, or low spots with an appropriate leveling compound. Ensuring the entire subfloor is level to the LVP manufacturer's specifications. Install new, high-quality Luxury Vinyl Plank (LVP) flooring according to the manufacturer's installation guidelines. Install new underlayment if required by the LVP manufacturer or project specifications. Ensure all planks are properly seated, with tight seams and no gaps. Install ne

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)