Description
REFURBISH BEQ FACILITIES; B4168, and B4169;
MCAS CHERRY POINT, NORTH CAROLINA 28533-0006
WORK ORDER # 7593597
1.1 GENERAL INTENTION
The work includes multiple BEQ rehabs and incidental related
work.
1.2 LOCATION
The work is located at B4168, and B4169, MCAS Cherry Point,
approximately as indicated. The exact location will be shown
by the Contracting Officer.
1.3 DETAILED REQUIREMENTS.
Removable Furniture, Appliances
INVENTORY, REMOVE, STORE, AND PROTECT EACH PIECE OF FURNITURE
IN THE BUILDING. TYPICAL SLEEPING ROOM INCLUDES BUT IS NOT
LIMITED TO: (2) METAL WARDROBES, (2) METAL RACKS, (2)
MATTRESSES, (2) DESKS, (2) DESK CHAIRS, (2) NIGHT TABLES, AND
(2) LAMPS, DORM SIZE REFRIGERATOR, MICROWAVE, RUGS,
DRAPERIES, AND COMFORTERS. LOUNGE, LAUNDRY, AND DUTY
FURNITURE INCLUDES BUT IS NOT LIMITED TO: (3) COUCHES, (10)
CHAIRS, (12) WASHING MACHINES, (24) DRYERS, DESK, AND DESK
CHAIR. INSTALL FURNITURE BACK INTO EACH ROOM WHEN
CONSTRUCTION ACTIVITIES ARE COMPLETE IN THAT ROOM.
Painting
Paint all interior previously painted surfaces in BEQs
B4168, B4166, B4167, and B4169.
Painting Finish Schedule:
Symbol Color Location Notes MPI Primer/
Intermediate/
Topcoat
PNT-1 SW 7105
PAPERWHITE
Typical
walls and
ceiling,
Provide
unless
noted
otherwise
Walls in
Semigloss
finish.
149/147/147
Ceiling in
Flat finish.
149/144/144
-- 1 of 19 --
PNT-2 SW 6615
PEPPERY
Accent wall
in Barracks
Rooms
See IMG-1
for accent
wall
location.
Typical for
all Barracks
Rooms.
Semigloss
finish.
149/147/147
PNT-3 SW 6480
LAGOON
Accent wall
in Lounge
Rooms
See IMG-2
for typical
accent wall
location.
Semigloss
finish.
149/147/147
IMG – 2: Typical Lounge Room accent wall location highlighted in blue above
-- 2 of 19 --
Painting Surface Area Breakdown (All numbers are approximate
CTR shall field verify, the tables below cover 4168, and
4169.)
The total area to be painted is as follows:
Location Surface Area (sq
ft)
B4168
Area (sq
ft)
B4169
Barracks
Rooms
Ceilings 24,553 30,692
Walls 56,393 70,491
Bathrooms Ceilings 2,745 3,294
Walls 13,250 19,080
Laundry
Rooms
Ceilings 1,506 1,506
Walls 2,718 2,718
Duty Hut Ceiling 175 175
Walls 510 510
Hallways Ceilings 344 344
Walls 1,673 1,673
Lounge Ceiling 1,100 1,100
Walls 2,705 2,705
All Areas Doors 14,112 17,136
Total Area 121,784 151,424
The contractor shall establish and maintain clearly marked
barricades around all active work areas to prevent
unauthorized entry and ensure the safety of barracks
personnel.
All surfaces (walls, ceilings, and doors) must be properly
prepared. This includes but is not limited to: Cleaning all
surfaces to remove dirt, dust, and grease. Scraping and
removing any loose or peeling paint. Patching any cracks,
holes, or other imperfections. Sanding and smoothing all
patched areas to blend with the surrounding surface.
Protecting all floors, furniture, and fixtures from paint
and debris using drop cloths and plastic sheeting.
-- 3 of 19 --
A single coat of high-quality primer is to be applied to all
specified surfaces to ensure proper paint adhesion and a
uniform finish.
Two coats of high-quality, low-VOC interior latex paint are
to be applied to all specified surfaces. The paint should be
applied evenly and consistently, with no drips or runs.
The contractor will be responsible for daily cleanup of the
work area, as well as a final, thorough cleaning upon
project completion. This includes the removal of all
painting materials, debris, and protective coverings from
the premises.
Flooring
Provide Solid Vinyl Plank with the following properties:
1. Conform to ASTM F1700 Class III printed (wood grain
look), Type B (embossed). Provide 4.5” x 36” planks with
unbeveled edge. The flooring must include a protective
urethane for ease of maintenance and conform to ASTM E648,
Type III Class I. The flooring must require a no wax
finish. Provide vinyl flooring that is easily cleaned with
off-the-shelf products. Surface finishes requiring
manufacturer supplied or special-order cleaning solutions
are not acceptable. Solid vinyl planks must meet ADA slip-
resistance requirements.
2. Wear layer thickness (EN 429): 40 mils minimum
3. Fire Performance
a. Critical Radiant Flux (ASTM E648 and NFPA 253): > 0.45
W/cm, Class 1
b. Optical Smoke Density (ASTM E662 and NFPA 258) Non-
Flaming DM Correct: < 450; Pass
Solid Vinyl Plank Basis of Design:
Mannington Commercial
AMTICO Signature Collection
AROW7510 GOLDEN OAK
Provide Resilient Floor Base with the following properties:
1. Conform to ASTM F1861, Type TS (vulcanized thermoset
rubber) or Type TP (thermoplastic rubber), Style B (coved –
installed with resilient flooring). Provide 4” high and a
minimum 1/8” thick wall base. Provide job formed corners in
matching height, shape, and color.
-- 4 of 19 --
Resilient Floor Base Basis of Design:
Johnsonite
Traditional Wall Base
47 Brown
Flooring Area Breakdown
The total area for flooring replacement is as follows:
Location Area (sq ft)
B4168
Area (sq ft)
B4169
Lounge Rooms 1,100 1,100
Barracks
Rooms
24,553 30,692
Laundry Room 1,506 1,506
Duty Hut 175 175
Head 3294 4206
Hallway 344 344
Total Area 27,334 33,473
Remove and dispose of all existing flooring materials,
including any underlayment, tack strips, and adhesives, from
the specified areas. Properly dispose of all removed
materials off-site.
All subfloor surfaces must be properly prepared to ensure a
smooth, and solid base for the new LVP flooring. This
includes but is not limited to: Thoroughly cleaning the
subfloor. Grinding or sanding down any high spots. Filling
any cracks, holes, or low spots with an appropriate leveling
compound. Ensuring the entire subfloor is level to the LVP
manufacturer's specifications.
Install new, high-quality Luxury Vinyl Plank (LVP) flooring
according to the manufacturer's installation guidelines.
Install new underlayment if required by the LVP manufacturer
or project specifications. Ensure all planks are properly
seated, with tight seams and no gaps.
Install ne…