Refurbish/Repaint Antenna Towers
TRANSPORTATION, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
697DCK-26-R-00351
NAICS
238320
PSC
Z1BG
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 16, 2026
Response due
July 20, 2026
Place of performance
Shelton, CT
What this opportunity is
The Department of Transportation is soliciting bids for the refurbishment and repainting of antenna towers, a project classified under NAICS code 238320 (Building Finishing Contractors). This total small business set-aside opportunity is open to small businesses, making it a suitable fit for eligible companies. As a solicitation, bidders will need to track the opportunity and submit a formal bid in response to the solicitation. The work will be performed in Connecticut.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Purpose of Amendment 01 is to release the official question and answer (Q&A) and provide clarification on bonding requirements as follows:
FIRST: When it comes to bonding and if it is required with your proposal, the answer is yes if your proposal exceeds the threshold of $150,000.00. There was a discrepancy discovered between between pages 03 and 77 of the solicitation. Therefore, the amount found on page 77 is incorrect and should read as the following:
L.2 REQUIRED DOCUMENTS
The Offeror MUST return the following completed documents as part of its offer to be considered eligible for award.
FACTOR 1: OFFER AND OTHER DOCUMENTS
1.Cover letter stating that no exceptions are taken to any specification requirements or contract terms and condition, or detailed summary of all exceptions taken.
2. Signed SOLICITATION, OFFER AND AWARD form and acknowledgement of any issued amendments.
3. Price proposal that includes all costs necessary to perform all work in accordance with each associated Statement of Work (SOW), and the Davis Bacon Wage Rates. All these attachments can be found in Section J.
4. Section K, Representations, Certifications, & Other Statements of Offerors.
5. Certificate of Liability from your insurance company that shows you can meet the requirements identified in this solicitation.
6. Performance bonding is required if your proposal exceeds $150,000.00.
This has also been further explained in attachment J-3, Official Question and Answers for 697DCK-26-R-00351.
********************************
SECOND: Attachment J-3, Official Question and Answers for 697DCK-26-R-00351 is hereby released.
********************************
THIRD: The due date for proposals remains unchanged: Noon (Eastern Time) on July 20, 2026.
********************************
FOURTH: All other terms and conditions remain unchanged and in full effect.
SCOPE OF WORK:
1. Surface preparation:
i. Remove any visible oil, grease or salt contaminants.
ii. All steel surfaces must be prepared in accordance with SSPC-SP 2 (Hand Tool Cleaning), SSPC-SP 3 (Power
Tool Cleaning) and SSPC-SP 11 (Power-Tool Cleaning to Bare Metal) Standards. SP11 must only take place when
necessary. Following hand and power tool cleaning, all surfaces must be brushed, blown clean with compressed air
or vacuumed to remove all dust, and debris before the application of any coating. The Contractor must prevent the
migration of debris, paint chips and dust to adjacent properties. All debris must be collected at the end of each
workday. No debris must be left on-site overnight, and the premises must be returned to a clean condition upon
completion of work.
iii. Hazardous Materials Requirements: The FAA completed lead, heavy metal (chromium and cadmium) and
polychlorinated biphenyl (PCB) sampling on the 75’ towers which were found to be detected. The contractor must
review the attached sampling report to ensure awareness of the presence of hazardous materials and must ensure that
all surface preparation work must comply with all local, state and federal requirements.
1. Summarized Results:
Tower A: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium.
Tower B: Detected lead-based paint, chromium and cadmium. PCBs were found to be not detected but Contractor must assume PCBs are present.
Tower C: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium.
Tower references are shown in a diagram in the last page of the sampling report.
a. Contractor must submit on a project specific Health and Safety Plan mitigating all hazard identified in the tower sampling report. All work must be completed in accordance with OSHA, EPA, SSPC/AMPP Standards and all other relevant standards. The Contractor must have a class 3P containment to prevent debris from spreading outside the worksite. See submittal section for all required submittals.
b. All waste must be disposed according to Connecticut Department of Energy and Environmental Protection and EPA regulations and disposed at waste facilities that accept the associated hazardous materials.
c. Contractor must provide a manifest in accordance with all federal, state and local standards.
2. Spot Prime Coat: All bare steel surfaces must receive one spot prime coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color 1243 Metallic Aluminum at 4-6 mil Dry Film Thickness (DFT). Follow all manufacturer requirements.
3. Full coat: Apply full coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color DC74 Off-White at 4-6 mil DFT on all exterior surfaces. Follow all manufacturer requirements.
4. Full Finish Coat: Apply one full finish coat of Tnemec Series 1095 Endura-Shield polyurethane, or approved equal, at 2.5-3.5 mils DFT on all exterior surfaces. Follow all manufacturer requirements.
5. The towers are equipped with a ladder and rail combination MSA dynaglide ladder safety system. The ladder safety system is hot dip galvanized, approximately 15 years old and in good condition. The contractor must only prepare and coat the ladder where it mounts to the tower. The Contractor must remove any paint that is mistakenly placed inside the fall arrestor channel, so it does not affect the performance of the system.
6. Remove rust at the conduit threads at the base of each tower. Coat with above coating system.
7. Measure thickness of coatings according to SSPC-PA 2. Take 4 sets of 3 individual readings per tower for each coat. Provide to the FAA copies of these results.
8. Apply new silane concrete sealer to existing exposed concrete foundation surfaces.
9. At the base of each tower is a bare #6 ground, partially in rigid conduit, that is clamped to a tower leg with a washer and structural bolt. Remove the #6 and associated rigid conduit to 1.5’ below grade. Remove the existing bolt that was used to clamp the #6 and replace with an ASTM A325 bolted co…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238320)
Utility Building Exterior & Interior Wall Repairs
STATE, DEPARTMENT OF · Solicitation · due July 27, 2026
Z1DZ--531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 124, 120
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due July 21, 2026
KES Enclosure Painting services
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 31, 2026
Carson National Fish Hatchery Quarters 4 Interior
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due August 22, 2026
Sustain Hangar Doors, Multi
DEPT OF DEFENSE · Solicitation · due July 31, 2026
Z1DZ--531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 124, 120
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation