Relay Switch Box, AN
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z03826QJ0000296
NAICS
336413
PSC
5930
Posted
August 25, 2026
Response due
August 27, 2026
Description
ATTACHMENT 3 – STATEMENT OF WORK
70Z03826QJ0000296
Page 1 of 3
1.0 Scope
This requirement is for the manufacture of the aircraft item listed in Attachment 1 –“Schedule with
First Article - 70Z03826QJ0000296” for any offeror who has not successfully passed a Form, Fit, and
Function (FFF) test, or Attachment 2 – “Schedule - 70Z03826QJ0000296” for any offeror that has
successfully passed a FFF test by the United States Coast Guard (USCG) Aviation Logistics Center
(ALC), the Contractor need not submit a first article.
1.2 The objective for the Contractor is to provide ALC with the item below to support our
Programmed Depot Maintenance (PDM) efforts.
Nomenclature Quantity National Stock Number Part Number
RELAY SWITCH BOX AN 1 5930-01-HS2-0460 1013M60T200-10
2.0 Major Tasks
2.1 Work under this Purchase Order shall be performed at the Contractor’s facility or USCG
approved facility. The Contractor shall provide all necessary materials, labor, tooling, and facilities to
manufacture the item listed in the Schedule. The Contractor shall manufacture the item in accordance
with (IAW) the ALC Drawing Numbers specified in Section 3.1. Attachment 1 – “Schedule with First
Article – 70Z03826QJ0000296”, Contract Line-Item Number (CLIN) 1 is subject to first article testing
IAW Federal Acquisition Regulation (FAR) 52.209-4 (Deviation 25-27). All services shall be
accomplished as directed by the Government. Requests for clarification shall be directed to the
Contracting Officer.
2.2 First Article
Any Contractor that has not previously passed FFF testing shall provide a quantity of one (1) each of
Line Item 1, Attachment 1 – “Schedule with First Article – 70Z03826QJ0000296”, within sixty (60)
days of receipt of the resulting purchase order. The First Article will be tested on Government aircraft
at ALC within thirty (30) days of receipt. Upon successful completion form, fit, and function testing on
the aircraft by the Government, USCG Engineering will approve the unit for the production phase. The
Contracting Officer will notify the Contractor in writing of conditional approval, approval, or
disapproval of the first article within sixty (60) calendar days after receipt of the first article. This
approval process is only required for first article units. Any production unit sent to the USCG without
approval will be returned at the offeror’s expense.
2.3 Manufacture
The item is to be manufactured as given in the ALC drawings specified in Section 3.1. Documentation
certifying that the item is in compliance with the ALC drawings must be provided with each item.
Payments will not be made until these certifications are received. The prices in Attachment 1 –
“Schedule with First Article – 70Z03826QJ0000296” or Attachment 2 – “Schedule –
70Z03826QJ0000296” for the manufacture of this item shall include all requirements outlined in the
relevant ALC drawings in Section 3.1. These requirements may include but are not limited to:
deburring, marking, testing, and applying finishes.
(Remainder of Page Intentionally Left Blank)
-- 1 of 3 --
ATTACHMENT 3 – STATEMENT OF WORK
70Z03826QJ0000296
Page 2 of 3
3.0 USCG Documents
3.1 Applicable Documents
Drawings for the Relay Switch Box are listed below:
2006M60H301, Rev B – Enclosure Cover
2006M60H302, Rev B – Enclosure Cover EMI Gasket
2006M60H303, Rev B – EMI Gasket – Pass Through
2006M60H320, Rev B – Labels
2006M60H702, Rev B – Ribbon Cable Assembly
2006M60H790, Rev D – Printed Wiring Assembly, ARC-210 (V) Switch. Antenna Unit
1013M60T200, Rev B – SA2791/ARC-210 (V) Switch, Antenna Unit
1013M60T302, Rev B – Identification Plate, SA-2791/ARC-210 (V) Relay Switch Box
1013M60T306, Rev B – Labels, ARC-210 RSB
1013M60T301, Rev B – Enclosure Assembly, ARC-210 RSB
1013M60T201, Rev A – Relay Assembly, ARC-210 RSB
3.2 Access to Documents
Drawings are available from the USCG. Before obtaining copies of these documents, Contractors shall
be registered in the Defense Logistics Agency's (DLA) Joint Certification Program (JCP). More
information on this certification can be found at http://www.dlis.dla.mil/jcp/Default.aspx. After
ensuring registration, the Contractor shall complete Attachment 5 – DHS Form 11000-6, Non-
Disclosure Agreement, specifically the section regarding “Other Sensitive but Unclassified (SBU)”
information. A written request for access to the drawings should be submitted to
Julie.G.Lininger@uscg.mil along with proof of JCP registration and the completed DHS-11000-6.
The USCG will only release these documents to United States (U.S.) businesses that have followed the
above procedures. The documents will not be released to any foreign entity. If the U.S. business plans
to release these documents to any foreign entity, they must first provide the USCG with a copy of a
valid Technical Assistance Agreement (TAA) and DSP-5 authorizing release to that entity.
4.0 Quality
4.1 Quality Control
The Contractor is required to be certified and maintain a quality system that complies with the
requirements of ISO 9001-2000 Quality Management Systems – Requirements or equivalent. The
Contractor is responsible for performing or assuring all inspections, tests and calibration necessary to
substantiate that the goods or services furnished conform to Government’s requirements. The
Contractor shall take prompt action to correct conditions that have or could result in goods or services
that do not conform to contractual requirements. Records of conformance shall be maintained on file at
the Contractor’s facility and made available or provided for review by the Government upon request.
The Government reserves the right to conduct surveillance at Contractor’s facility to verify the
existence, adequacy and effectiveness of the quality system. Upon request of the Government, the
Contractor shall forward a copy of their current certification and Quality Assurance Manual for review.
-- 2 of 3 --
ATTACHMENT 3 – STATEMENT OF WORK
70Z03826QJ0000296
Page 3 of 3
5.0 Warranty
The Contractor’s …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗