Remanufacture of the B-1 Electro-Mechanical Actuator

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA811826R0032
NAICS
336413
PSC
1680
Set-aside
No Set aside used
Posted
May 18, 2026
Response due
July 7, 2026
Place of performance
S Coffeyville, OK

What this opportunity is

The Department of Defense is seeking contractors for the remanufacture of the B-1 Electro-Mechanical Actuator, classified under NAICS 336413 and PSC 1680. This opportunity is open to all businesses as there is no set-aside, making it suitable for both small and large firms. Interested parties should note that this is a solicitation notice, indicating that they should prepare to submit bids rather than simply track the opportunity. The work will take place at Tinker Air Force Base in Oklahoma.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Appendix A PR Number: FD20302601232 SOW Form Rev 11: 4 MAR 2026 i DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 PR NO: FD20302601232 DATE: 5 MARCH 2026 AF CONTRACT NO: XXXXX-X STATEMENT OF WORK (SOW) TYPE OF WORK: Remanufacture of Electro-mechanical Rotary Actuator TABLE OF CONTENTS PREFACE SHEET......................................................................................................................... iii REVISION SHEET ....................................................................................................................... iv SECTION 1 GENERAL INFORMATION .................................................................................... 1 1.1. DEFINITIONS ..................................................................................................................... 1 1.2. INITIAL PRODUCTION EVALUATION REQUIREMENTS .......................................... 3 1.3. REPORTING/DATA REQUIREMENTS ........................................................................... 4 1.4. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS ..................... 5 1.5. SPECIAL TOOLS AND TEST EQUIPMENT ................................................................... 6 1.6. PRECIOUS METALS RECOVERY PROGRAM .............................................................. 7 1.7. NUCLEAR HARDNESS REQUIREMENTS ..................................................................... 7 1.8. PARTS CONTROL PROGRAM ......................................................................................... 7 1.9. OZONE DEPLETING SUBSTANCES ............................................................................... 8 1.10. TECHNICAL ORDER MAINTENANCE ........................................................................ 8 1.11. CONTRACTOR EMPLOYEES ........................................................................................ 9 1.12. SAFETY AND HEALTH STATEMENT ......................................................................... 9 1.13. ITEM UNIQUE IDENTIFICATION REQUIREMENTS ............................................... 10 1.14. SURGE ............................................................................................................................. 10 SECTION 2 DESCRIPTION OF WORK .................................................................................... 12 2.1. GENERAL ......................................................................................................................... 12 2.2. SPECIFIC WORK REQUIREMENTS .............................................................................. 14 2.3. DELIVERY SCHEDULE .................................................................................................. 16 SECTION 3 APPLICABLE DOCUMENTS................................................................................ 17 3.1. APPLICABLE TECHNICAL ORDERS ........................................................................... 17 3.2. OTHER PUBLICATIONS ................................................................................................. 17 3.3. CONTRACTOR DOCUMENTS ....................................................................................... 19 SECTION 4 GOVERNMENT PROPERTY ................................................................................ 20 -- 1 of 32 -- Appendix A PR Number: FD20302601232 SOW Form Rev 11: 4 MAR 2026 ii 4.1. GOVERNMENT PROPERTY .......................................................................................... 20 4.2. DISPOSITION OF GOVERNMENT PROPERTY ........................................................... 20 4.3. OTHER............................................................................................................................... 20 SECTION 5 CONSUMABLE PARTS REPLACEMENT REQUIREMENTS........................... 21 5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS ............................. 21 SECTION 6 SUPPLY CHAIN RISK MANAGEMENT (SCRM) .............................................. 22 6.1. GENERAL ......................................................................................................................... 22 6.2. CONTINUITY OF OPERATION (COOP) ....................................................................... 22 6.3. FOREIGN INFLUENCE ................................................................................................... 23 6.4. CYBERSECURITY ........................................................................................................... 24 -- 2 of 32 -- Appendix A PR Number: FD20302601232 SOW Form Rev 11: 4 MAR 2026 iii PREFACE SHEET END ITEM RECEIVED AS END ITEM TO BE DELIVERED AS LINE ITEM NUMBER NATIONAL STOCK NUMBER PART NUMBER NATIONAL STOCK NUMBER PART NUMBER 0001 1680-01-267-9557RK R16115 1680-01-267-9557RK R16115 -- 3 of 32 -- Appendix A PR Number: FD20302601232 SOW Form Rev 11: 4 MAR 2026 iv REVISION SHEET When a revision is received, it should be inserted into this Statement of Work (SOW). The superseded pages should be retained as a record. NOTE: The portion of text in this document affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph. After the revised pages have been inserted into the SOW, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page. DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE: -- 4 of 32 -- Appendix A PR Number: FD20302601232 SOW Form Rev 11: 4 MAR 2026 1 SECTION 1 GENERAL INFORMATION 1.1. DEFINITIONS 1.1.1. The following definitions are applicable to this SOW: a. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336413)