What this opportunity is
The Department of Defense is soliciting a Service-Disabled Veteran-Owned Small Business (SDVOSB) for the construction of sloped concrete sides for an F-15 display and removal of a traffic island, along with asphalt work in front of a guard shack at the Fresno Air National Guard Base in California. The project involves furnishing project management, supervision, labor, materials, and equipment to complete the specified work. This solicitation is a formal bid, requiring interested SDVOSBs to track the opportunity and submit a proposal.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CUI
CUI
STATEMENT OF WORK
CONSTRUCT SLOPED CONCRETE SIDES FOR F-15 DISPLAY & ISLAND REMOVAL AND ASPHALT
WORK IN FRONT OF WEST GATE GUARD SHACK
HAYW262017
18 May 2026
144TH FIGHTER WING
-- 1 of 11 --
CUI
CUI
CALIFORNIA AIR NATIONAL GUARD, FRESNO
TABLE OF CONTENTS
1.0 DESCRIPTION OF SERVICES................................................................................................3
2.0 SITE OF WORK ....................................................................................................................3
3.0 STATEMENT OF WORK .........................................................................................................3
4.0 CONTRACTOR QUALIFICATIONS .........................................................................................5
5.0 PROJECT SPECIFIC REQUIREMENTS ....................................................................................5
6.0 GENERAL REQUIREMENTS ..................................................................................................5
7.0 CLOSEOUT DOCUMENTATION ............................................................................................7
8.0 DEFINITIONS ......................................................................................................................7
9.0 ACRONYMS ........................................................................................................................8
10.0 APPLICABLE PUBLICATIONS .............................................................................................8
TECHNICAL EXHIBIT I ............................................................................................................. 10
-- 2 of 11 --
CUI
CUI
1.0 DESCRIPTION OF SERVICES
This Statement of Work describes contractor requirements for the project titled "Construct Sloped Concrete Sides
for F-15 Display & Island Removal and Asphalt Work in Front of West Gate Guard Shack.”
All work will occur at the Fresno Air National Guard Base, California. The contractor is responsible for furnishing
all project management, supervision, labor, materials, and equipment to complete the items listed in this Statement
of Work. The work involves the construction of sloped concrete sides (or "ramps") against an existing, raised
concrete block display pedestal. The contractor shall provide the government with a complete and usable product
that will be inspected/accepted by the government at the completion of the project. All information included in this
document, along with the instructions and standards referenced in the document, shall be considered as part of the
Statement of Work.
2.0 SITE OF WORK
All work will occur at:
Fresno Air National Guard Base
5323 McKinley Ave
Fresno, CA 93727
3.0 STATEMENT OF WORK
3.1 Objectives: The purpose of this project is to accomplish two distinct construction objectives. Contractors are
encouraged to visit the site to take measurements of the existing pedestal and surrounding area, and island to be
removed and repaved.
Objective A: Construct Sloped Concrete Sides. Similar to that shown in Exhibit A.
The purpose of Objective A is to construct sloped concrete sides around an existing raised pedestal for a static F-15
heritage aircraft display. All design, materials, and construction shall strictly adhere to the applicable Unified
Facilities Criteria (UFC) and Air National Guard Engineering Technical Letters (ANGETL).
3.1.1. Site Preparation: Prepare the site for construction, to include all necessary clearing, excavation, and
grading of the area surrounding the existing pedestal to establish a proper sub-base. Earthwork and
subgrade preparation shall be executed in accordance with UFC 3-220-01 (Geotechnical Engineering).
3.1.2 Surface Preparation: Prepare the surfaces of the existing pedestal to ensure proper adhesion of the
new concrete, removing any debris, organic material, or loose substrate.
3.1.3 Formwork: Install formwork to create a 60 degree (from horizontal) angled, sloped sides against the
existing pedestal.
3.1.4 Color Submittal & Approval: The concrete must be colored to match that shown in Exhibit A. The
contractor must submit a color swatch before pouring concrete. The Base Civil Engineer (BCE) will
approve the color swatch prior to the start of construction.
3.1.5 Concrete Pour & Finish: Pour and finish approximately three (3) cubic yards of concrete to form the
sloped sides, ensuring a seamless and durable bond with the existing pedestal. Contractor is responsible for
calculating the required quantity of concrete to meet all UFC’s and ANGETLS requirements for this type of
work. Concrete mix design, placement, and reinforcement (if applicable) must comply with UFC 3-301-01
(Structural Engineering) and applicable exterior flatwork guidelines in UFC 3-250-01.
3.1.6 Curing: Properly cure the new concrete in accordance with American Concrete Institute (ACI)
standards (e.g., ACI 301 and ACI 318) as required by UFC 3-301-01 to prevent cracking and ensure
maximum durability against weather exposure.
-- 3 of 11 --
CUI
CUI
3.1.7 Mandatory Compliance Standards: All site prep, design, and concrete construction operations for
this pedestal modification shall conform to the latest editions of the following foundational criteria:
ANGETL 24-01-07: Airfield and Vehicle Pavement Design Guidance (for exterior site concrete
considerations).
UFC 1-200-01: DoD Building Code (General Building Requirements).
UFC 3-201-01: Civil Engineering.
UFC 3-220-01: Geotechnical Engineering.
UFC 3-250-01: Pavement Design for Roads, Streets, Walks, and Open Storage Areas.
UFC 3-301-01: Structural Engineering (Governs DoD concrete construction and ACI standard
implementation).
Objective B: Demolish and Remove West Gate Island Area
The purpose of this sub-project is to demolish and remove the traffic island located in front of the West Gate guard
shack, cap all the underlying irrigation, and pave the area with Asphalt Concrete to match the existing driveway
entrance. …