What this opportunity is
The Department of Defense is seeking a contractor to renovate the fitness room at the Fresno Air National Guard Base in California, focusing on interior and exterior reconditioning, including painting, mirror installation, floor leveling, and electrical upgrades. This opportunity is set aside for Women-Owned Small Businesses, making it suitable for eligible small firms in this category. As a solicitation notice, interested businesses should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CUI
CUI
PERFORMANCE WORK STATEMENT
Gym (B124) Interior Re-Conditioning
HAYW 26-2016
14 July 2026
144TH FIGHTER WING
CALIFORNIA AIR NATIONAL GUARD, FRESNO
-- 1 of 10 --
CUI
CUI
TABLE OF CONTENTS
1.0 DESCRIPTION OF SERVICES ............................................................................................................. 3
2.0 SITE OF WORK ................................................................................................................................... 3
3.0 STATEMENT OF WORK ....................................................................................................................... 3
4.0 CONTRACTOR QUALIFICATIONS ..................................................................................................... 4
5.0 PROJECT SPECIFIC REQUIREMENTS ............................................................................................... 4
6.0 GENERAL REQUIREMENTS............................................................................................................... 5
7.0 CLOSEOUT DOCUMENTATION ......................................................................................................... 7
8.0 DEFINITIONS ........................................................................................................................................ 7
9.0 ACRONYMS ........................................................................................................................................ 7
10.0 APPLICABLE PUBLICATIONS ........................................................................................................... 8
TECHNICAL EXHIBIT I ............................................................................................................................ 10
-- 2 of 10 --
CUI
CUI
1.0 DESCRIPTION OF SERVICES
This Statement of Work describes contractor requirements for the project titled "Gym (B124) Interior Re-
Conditioning”. All work will occur at the Fresno Air National Guard Base, California. The contractor is
responsible for furnishing and installing all project management, supervision, labor, materials, and equipment to
complete the items listed in this Statement of Work. The work involves reconditioning the interior and exterior of
the facility, specifically focusing on painting, mirror installation, floor leveling, the placement of athletic flooring
mats, electrical and lighting upgrades, and drainage modifications. The contractor shall provide the government
with a complete and usable product that will be inspected/accepted by the government at the completion of the
project. All information included in this document, along with the instructions and standards referenced in the
document, shall be considered as part of the Statement of Work.
2.0 SITE OF WORK
All work will occur at:
Fresno Air National Guard Base
5323 McKinley Ave
Fresno, CA 93727
3.0 STATEMENT OF WORK
3.1 Objectives: The purpose of this project is to accomplish five distinct facility improvement objectives at Gym
(B124).
Objective A: Facility Painting
The purpose of this sub-project is to prepare and paint both the interior and exterior portions of the building.
• 3.1.1 Visit the site to take precise measurements and verify the conditions of the interior and exterior
surfaces.
• 3.1.2 Remove all existing mirrors from the walls. Prepare all interior surfaces (approximately 5,651 sq. ft.
of wall, including the roof/ceiling) to ensure proper adhesion of the new paint.
• 3.1.3 Apply primer and paint to the 5,651 sq. ft. interior area, ensuring a smooth, even, and durable finish.
• 3.1.4 Prepare the exterior surfaces (approximately 5,078 sq. ft. of wall) to ensure proper adhesion and
weatherproofing.
• 3.1.5 Apply primer and exterior-grade paint to the 5,078 sq. ft. exterior area.
Objective B: Mirror Installation
The purpose of this sub-project is to install wall mirrors inside the gym.
• 3.1.6 Prepare the designated interior walls for mirror installation
• 3.1.7 Furnish and securely install gym mirrors covering a total of 2,214 sq. ft. of wall space. If any of the
existing mirrors were damaged during removal/storage, contractor is responsible for replacement. New mirrors
shall be of the same size and quality as the ones removed
• 3.1.8 Ensure all mirrors are level, properly supported, and free of defects, sharp edges, or distortion.
Objective C: Floor Preparation and Mat Installation
The purpose of this sub-project is to properly clean and seal the existing floor and install protective athletic
flooring mats inside the facility.
• 3.1.9 Prepare the existing interior floor by power washing and sealing all cracks on the existing concrete
surface to ensure a clean and smooth base
-- 3 of 10 --
CUI
CUI
• 3.1.10 If necessary, adjust and raise the existing interior floor drain(s) so they sit flush with the floor
elevation. Clean the existing drain line by hydro jetting from the interior drain (center of gym floor) to
the exterior (north) drain to assure all drains are flowing.
• 3.1.11 Furnish and install interlocking 3/8 inch (min) 2x2 foot square light gray rubber slip-resistant athletic mats
covering a total interior square footage of 2,592 sq. ft.
• 3.1.12 Ensure the mats are properly fitted, seamed (if applicable), and secured to prevent shifting or
tripping hazards.
Objective D: Electrical and Lighting Upgrades
The purpose of this sub-project is to update the facility's air circulation and lighting systems.
• 3.1.13 Demolish and remove ten (10) existing ceiling fans.
• 3.1.14 Furnish and install ten (10) 52-inch ceiling fans with LED lights.
• 3.1.15 Replace eight (8) exterior light bulbs with energy-efficient LED bulbs.
• 3.1.16 Replace twenty-five (25) interior light tubes with energy-efficient LED tubes.
Objective E: Drainage Improvements
The purpose of this sub-project is to mitigate backflow issues inside and outside the facility.
3.1.17 Furnish and install one-way drain flow traps on both the interior and exterior drain…
Source: SAM.gov, as posted. Verify the current solicitation before responding.