What this opportunity is

The Department of Defense is seeking a contractor to perform repairs on the C-130 Pressure Altimeter, identified by NSN 6610-01-212-6464. This opportunity is set aside for total small businesses under NAICS 336413. As a presolicitation notice, interested vendors should prepare to track the opportunity and respond accordingly, as the formal solicitation has not yet been released. The work will be performed at Tinker Air Force Base in Oklahoma.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

26 Mar 2026 i FD20302600941 DEPARTMENT OF THE AIR FORCE AIR FORCE SUSTAINMENT CENTER TINKER AIR FORCE BASE, OKLAHOMA 73145 Performance Work Statement (PWS) TYPE OF WORK: Repair of C130 Pressure Altimeter PURCHASE REQUEST: FD2030-26-00941 REVISION: 00 DATE: PREPARED BY: James Braxton 422 SCMS/GUMC TINKER AFB, OK. 73145-3031 DSN 339-4442 -- 1 of 45 -- 26 Mar 2026 ii FD20302600941 REVISION SHEET Note: All revisions to the contents of this PWS will now be listed on this Revision Sheet. The original content of this PWS will not be removed, but will be superseded or added to by the paragraph revisions shown on this page. Revision Date Paragraph Paragraph is added or revised to read as follows: Original No revisions -- 2 of 45 -- 26 Mar 2026 iii FD20302600941 PREFACE SHEET END ITEM RECEIVED AS END ITEM TO BE DELIVERED AS END ITEM NOMENCLATURE NATIONAL STOCK NO(S) PART NO(S) NATIONAL STOCK NO(S) PARTS NO(S) 1-Pressure Altimeter 6610-01-212-6464 518-28007-921 6610-01-212-6464 518-28007-921 -- 3 of 45 -- 26 Mar 2026 iv FD20302600941 TABLE OF CONTENTS REVISION SHEET ii PREFACE SHEET iii TABLE OF CONTENTS iv 1 DESCRIPTION OF SERVICES/GENERAL INFORMATION 1 1.1 PURPOSE 1 1.2 INITIAL PRODUCTION EVALUATION (IPE) REQUIREMENTS 1 1.3 QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS 2 1.4 SUPPLY CHAIN RISK MANAGEMENT 3 1.5 FOREIGN INFLUENCE 3 1.6 OBSOLESCENCE STATEMENT 4 1.7 CYBERSECURITY 4 1.8 CONDEMNATION CANDIDATES 6 1.9 SUPPORT EQUIPMENT (SE), INCLUDING SPECIAL TOOLS (ST) AND SPECIAL TEST EQUIPMENT (STE) 6 1.10 PRECIOUS METALS RECOVERY PROGRAM 7 1.11 NUCLEAR HARDNESS REQUIREMENT 7 1.12 CONFIGURATION MANAGEMENT 8 1.13 PARTS CONTROL PROGRAM 8 1.14 COUNTERFEIT PREVENTION PLAN (CPP). 9 1.15 OZONE DEPLETING SUBSTANCES (ODS) 11 1.16 LEAD (Pb) FREE ELECTRONICS 11 1.17 TECHNICAL ORDER MAINTENANCE 12 1.18 CONTRACTOR IDENTIFICATION 12 1.19 GENERAL WORK REQUIREMENTS 12 1.20 SPECIFIC WORK REQUIREMENTS 13 1.21 SPECIAL REQUIREMENTS 16 1.22 SAFETY AND HEALTH REQUIREMENTS 16 1.23 PRODUCTION SURGE/CAPABILITIES ANALYSIS PLAN 17 1.24 MISSION ESSENTIAL SERVICES 17 1.25 DELIVERY SCHEDULE 18 1.26 INFORMATION REQUESTS 18 -- 4 of 45 -- 26 Mar 2026 v FD20302600941 1.27 REPORTING REQUIREMENTS 18 2 SERVICE SUMMARY 20 2.1 SERVICE SUMMARY 20 3 GOVERNMENT PROPERTY 22 3.1 GOVERNMENT FURNISHED MATERIAL, EQUIPMENT, AND PROPERTY 22 3.2 DISPOSITION OF GOVERNMENT PROPERTY 22 3.3 REPORTING LOSS OF GOVERNMENT PROPERTY 22 3.4 DISCREPANCIES INCIDENT TO SHIPMENT 23 APPENDIX A 25 Definitions 25 APPENDIX B 29 Applicable Documents, Technical Orders, Directives, and Technical Guidance 29 APPENDIX C 32 Data Item Description (DID) List 32 APPENDIX D 34 Category of Repair Descriptions 34 APPENDIX E 35 Commercial Asset Visibility Air Force 35 -- 5 of 45 -- 26 Mar 2026 1 FD20302600941 1 DESCRIPTION OF SERVICES/GENERAL INFORMATION 1.1 PURPOSE 1.1.1 The purpose of the Performance Work Statement (PWS) is to define the repair requirements for the items specified on the Preface Sheet of this PWS. The Contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality serviceable product. 1.2 INITIAL PRODUCTION EVALUATION (IPE) REQUIREMENTS 1.2.1 An Initial Product Evaluation(IPE) is not required if the contractor is the OEM or is the incumbent repair contractor, however, if the Contractor moves this workload to a new facility, or novates/divests his rights during the life of this contract an IPE may be required at the Governments discretion. 1.2.2 If an IPE is required: All Support Equipment, including Special Tools and Special Test Equipment required to accomplish the scope of work to be completed on end-items under this contract shall be in possession of the Contractor prior to the Initial Production Evaluation (IPE) team visit. Such equipment is listed in the Technical Orders or OEM repair procedures listed in Appendix B of this PWS. The Contractor shall show documentation certifying the accuracy of all calibrated SE to the Administrative Contracting Officer (ACO) prior to work being performed, as outlined in this PWS, paragraph 1.7.2, Support Equipment Calibration Requirements. The IPE will be conducted on three units of each line item. The condition of the items at IPE will be as follows: one unit removed from shipping container and packaging and ready to follow the entire repair procedure, including disassembly and functional testing, one unit fully disassembled, cleaned, and ready for assembly and functional testing, and one unit assembled and ready for functional testing. The Contractor shall furnish a written notice to the PCO through the ACO within fifteen (15) calendar days after the required quantity of units are available for the IPE. 1.2.3 The PCO will notify the Contactor of the projected dates that the Government IPE Evaluation Team will arrive at the Contactor’s facilities to conduct the IPE. The Contractor shall permit the Government’s IPE Evaluation Team members entrance into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Government IPE Evaluation Team members to consult with appropriate Government personnel in the accomplishment of the IPE evaluation. 1.2.4 Under no circumstances shall the Contractor accomplish repair on any other quantity of items on order. Other than the three IPE units that will be evaluated by the Government IPE Team members prior to the accomplishment of the IPE. Only after written approval of the IPE by the cognizant Engineer and/or Equipment Specialist (the Government IPE Evaluation Team Leader) -- 6 of 45 -- 26 Mar 2026 2 FD20302600941 and direction of the PCO shall the Contractor proceed with repair on the remaining items on order. The Government’s delive

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 336413)