Restroom Repair (MOF)

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S8U26RA010
NAICS
236220
PSC
Z2AA
Set-aside
Small Business Set Aside - Total
Posted
August 23, 2026
Response due
August 25, 2026
Place of performance
Tulsa, OK

Description

STATEMENT OF WORK pg. 1 MOF Restroom Repair XHZG250314 1 DEC 2025 General 1. The contractor shall provide all labor, materials, tools, equipment and transportation necessary to complete the work identified in this Statement of Work. 2. All debris is to be disposed of off base with proper documentation in accordance with the waste management plan generated by the contractor after the project is awarded. 3. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within government-controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. a. For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. 4. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. 5. This project is to be in accordance with the current version of the EMS Environmental Protection Statement. A copy of this document will be provided to bidding contractors via sam.gov as an attachment. -- 1 of 5 -- STATEMENT OF WORK pg. 2 6. This project is to be in accordance with the current version of the 138FW Safety and Accident Prevention Guide. A copy of this document will be provided to bidding contractors via sam.gov as an attachment. 7. The contractor shall apply all environmental health and safety procedures required by local, state and federal regulations. 8. All work to be performed 7:00 AM to 5:30 PM Monday thru Thursday in accordance with the general conditions stated in the general conditions of the specifications. If alternate work schedule is desired, it must be requested in writing and approved by CE and Security 48 hours prior to the desired schedule. 9. The contractor is required to provide an AF Form 103 (Work Clearance Request) prior to any earthwork or wall penetrations. 10. The contractor is responsible for marking/locating all underground utilities. All base underground utilities are not covered by the Call OKIE service, contractor will be responsible for locating and marking those utilities as well. The only utilities that Call OKIE service will mark is Natural gas and Cox communications. All other utilities to include base communications fiber optic lines, electric, sewer and water will be the contractor’s responsibility to mark. Contractor must have all utilities marked in an area before a dig permit is issued. a. If a utility is damaged, the contractor will repair per current code specifications or base standards. 11. Prior to any work, the contractor shall submit for approval by CE, one electronic copy of technical literature for all products to be used. Provide Safety Data Sheets for all appropriate products. Provide a Form 889 for all equipment/items that will need to be purchased to maintain or repair the equipment at a later date. a. Two Ways to Get a Form 889 i. Check SAM.gov FAR 52.204-26 (Oct 2020) ii. Use RPA tool (Email a blank email with the UEI # in the subject line to OSD.section889request@mail.mil) 12. All DBIDS Contractor passes will be approved by the BCE and issued by SFS after completion of required background checks. REAL IDs are required to receive a DBIDS Contractor Pass. Final payment to the general contractor will not be made at the completion of the construction project until all contractor badges have been returned or the continuing need is validated and documented in writing by SFS and BCE personnel. 13. Contractor will be responsible for keeping a log of all debris disposed of off base to include tonnage, volume, and disposal site. This data will need to be readily available through the project for semi-annual data calls or inspections. 14. Contractor shall collaborate with Civil Engineering’s project manager to complete and submit the AF Form 1354 as part of the closeout documentation upon 100% completion of the project. -- 2 of 5 -- STATEMENT OF WORK pg. 3 15. Contractor shall submit the project schedule and material submittals utilizing AF Form 3000. Civil Engineering’s project manager shall be available to aid with document completion as needed. 16. The Contractor shall coordinate with Civil Engineering’s project manager to arrange for initial base access and to schedule escorts, as required, for the duration of the construction period. Scope of Work Bathroom 1: 17. Demolition and Preparation: a.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)