RFI / Site Visit Notice - Replacement of Chillers, Bldg. 8280, Baumholder, Germany
DEPT OF DEFENSE
Notice type
Sources Sought
Solicitation #
RFI_GDP-B0683-6P
NAICS
561210
PSC
Z2AA
Set-aside
No Set aside used
Posted
June 17, 2026
Response due
June 25, 2026
Place of performance
Baumholder, DE-RP
What this opportunity is
The U.S. Army is seeking information for the replacement of chillers at Building 8280 in Baumholder, Germany, as part of project GDP-B0683-6P. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested parties should note that this is a Sources Sought notice, indicating that it is primarily for gathering information rather than immediate bidding; a formal solicitation will be issued later. Attendance at the scheduled site visit on June 25, 2026, is encouraged for those interested in participating.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Department of the Army
UNITED STATES ARMY GARRISON RHEINLAND-PFALZ
BAUMHOLDER MILITARY COMMUNITY
Directorate of Public Works
Unit 23152
APO AE 09054-3152
SPECIFICATION / LEISTUNGSVERZEICHNIS
PROJECT NO.:
PROJECT TITLE: Replace two Chillers for Bldg. #8280
In the event of a disagreement between the English text and the courtesy translation of this
specification the English text will govern.
Im Falle einer Unstimmigkeit zwischen dem englischen Text der Leistungsbeschreibung und der
Gefälligkeitsübersetzung ist der englische Text maßgebend
DRAFT
-- 1 of 23 --
Page 2 of 23
Table of Contents
A. PREAMBLE / VORBEMERKUNGEN ................................................................. 3
A1. DESCRIPTION OF WORK / BAUBESCHREIBUNG ............................... 3
A1.01 General / Allgemein ..................................................................................................... 3
A1.02 Location of Job Site / Lage der Baustelle ................................................................... 3
A1.03 Type and Scope of Work / Art und Umfang der Leistungen ....................................... 4
A2. GENERAL CONDITIONS / ALLGEMEINE BEDINGUNGEN ............................ 5
A2.01 ............................................................................................................................................ 5
Material and Structural Elements / Stoffe und Bauteile ............................................................... 5
A2.02 General Technical Provision VOB Part C / Allgemeine Technische........................... 6
Vorschriften für Bauleistungen VOB Teil C ................................................................................. 6
A2.03 Construction Site Equipment / Baustelleneinrichtung ................................................ 6
A2.04 Removable Material / Auszubauende Materialien ...................................................... 6
A2.05 Person of Contact / Kontaktperson.......................................................................... 7
A2.06 Safety and Health protection / Sicherheits- und Gesundheitsschutz ........................... 7
A2.07 Anti-Terrorism and Operations Security (AT/OPSEC) / Anti- ................................... 8
Terrormaßnahmen und Betriebliche Sicherheit ........................................................................... 8
A2.08 Supplementary Technical Conditions / Zusätzliche technische Bedingungen .......... 11
B. SPECIFICATION / LEISTUNGSBESCHREIBUNG ........................................... 15
0001 Disassembly work / Demontagearbeiten .............................................................. 15
0002 Chiller and system components / Kaltwassersatz (KWS)und Systemkomponenten15
0003 Electric & Utility Monitoring and Control System / Elektro & Mess-, Steuer- und
Regeltechnik ............................................................................................................................ 20
TECHNICAL EXHIBIT B...................................................................................................... 23
DELIVERABLES SCHEDULE ............................................................................................. 23
Attachment .............................................................................................................................. 23 DRAFT
-- 2 of 23 --
Page 3 of 23
A. PREAMBLE / VORBEMERKUNGEN
A1. DESCRIPTION OF WORK / BAUBESCHREIBUNG
A1.01 General / Allgemein
The project includes the dismantling and installation (including delivery) of two (2)
Chillers, as well as the replacement of the ICA & DDC incl. connection to the
Building Management System (BMS).
In order to get an exact overview of the location of the construction site, the project
must be visited after prior consultation with the contracting officer.
Since the facility is cooled by these Chillers, it is to minimize the downtime of the
cooling system. (depending on the outside temperature).
Das Projekt umfasst die Demontage und Installation (inkl. Lieferung) zweier (2)
Kaltwassersätze sowie die Erneuerung der MSR & DDC inkl. Aufschaltung und
Visualisierung auf die Gebäudeleittechnik (GLT).
Um sich einen genauen Überblick über die Lage der Baustelle machen zu können,
muss das Project nach vorheriger Absprache mit Contracting center besichtigt
werden.
Da das Gebäude ausschließlich über diese beiden Kaltwassersätze gekühlt wird, ist
die Ausfallzeit des Kühl Systems auf ein Minimum zu reduzieren. (je nach
Außentemperatur)
A1.02 Location of Job Site / Lage der Baustelle
Building # 8280 is located outside the Smith Barracks Area in a separately fenced-
off area in Baumholder and used as a training center.
The Chillers to be replaced is in the mechanical room in basement.
As the Chillers are installed in the basement, they can only be brought in through the
outdoor stairwell or the freight elevator. The opening and closing of auxiliary or
insertion openings and suitable lifting gear is part of the contract and must be taken
into account.
The use of the building should be possible during the construction work without
major disruption to operations. Accesses and emergency exits are to be kept free and
secured in such a way that users are not endangered. The work area is to be properly
secured during work interruptions (construction fence).
DRAFT
-- 3 of 23 --
Page 4 of 23
Das Gebäude # 8280 befindet sich außerhalb des Smith-Barracks-Geländes in einem
separat eingezäunten Bereich in Baumholder und wird als Trainingscenter genutzt.
Die zu erneuernden Kaltwassersätze stehen im Technikraum im Keller des
Gebäudes.
Da die Kaltwassersätze im Keller installiert sind, ist die Einbringung nur durch die
Außentreppe oder durch den Lastenaufzug möglich. Das Öffnen und Schließen von
Hilfs bzw. Einbringöffnungen und geeignetem Hebezeug ist Bestandteil des
Vertrages und ist mit einzukalkulieren.
Die Nutzung des Gebäudes soll während der Bauausführung ohne große
Beeinträchtigung des Betrie…