What this opportunity is
The Department of Defense is soliciting bids for the RPR Facilities Facades, MULTI project, under NAICS code 236220 (Construction of Buildings). This project is set aside for small businesses and requires a firm fixed price construction contract. The scope of work includes repairing and finishing facades and annex elements at Morón Air Base, ES-AN, and involves activities such as paint removal, cement mortar application, and painting steel surfaces. Bidders should track the solicitation as it is not a set-aside for a specific business type.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PREPARED FOR DEPARTMENT OF THE
AIR FORCE
BY
KBR
ENGINEERING DESIGN SECTION
MORÓN AIR BASE
PERFORMANCE TECHNICAL SPECIFICATIONS FOR:
PROJECT QUUG 25-1012
RPR FACILITY FAҪADES, MULTI
Prepared by: ___________________________________________________________________
Reviewed by: ___________________________________________________________________
Approved by: ___________________________________________________________________
Page 1 of 70
-- 1 of 70 --
PROJECT QUUG 25-1012 SOW
PT-2
LIST OF SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Scope of Work & Drawings 4
01 11 01 General Conditions 31
01 11 02 Special Conditions 2
DIVISION 4 - MASONRY
04 22 00.00 40 Masonry Unit 5
DIVISION 7 - THERMAL AND MOISTURE
PROTECTION
07 92 00 Sealants 4
DIVISION 9 - FINISHES
09 23 24 Plaster and Stuccos 7
09 90 00 Paints and Coatings 15
Page 2 of 70
-- 2 of 70 --
PROJECT QUUG 25-1012
01 11 00 - 1
SECTION 01 11 00
SCOPE OF WORK AND DRAWINGS
1. SCOPE OF WORK: The scope of work consists of furnishing all labor, materials,
plant, transportation, equipment and services to perform all work in strict accordance with the plans
and specifications, complete and ready for use under a firm fixed price construction contract. The
Contractor shall be responsible for temporary marking, beaconing and lighting of the area affected by
the work and, if required, shall provide flaggers, escorts and foreign object controllers (FOD) during
working hours. A single phase has been established for the execution of the project. The work
includes, among others, the following activities, which include tests to be performed by an
independent laboratory for quality control.
This project is composed of a Basic Package and three additive items. All works to be executed consist
on the repair and finish works of the facades and annexes elements as indicated below:
1.1 CLIN 1 Building 202. (Base Bid)
1.1.1. (01) Removal & reinstallation of cables, accessories & other equipment.
1.1.2. (06) Paint removal.
1.1.3. (08) Cement mortar application.
1.1.4. (11) Clean and disinfect grease and oil-impregnated surfaces with quaternary
ammonium degreaser and rinse with high-pressure hot water.
1.1.5. (12) Clean mildew-covered surfaces by brushing with a fungicide solution and
rinsing with tepid water.
1.1.6. (14) Paint Unpainted Steel Surfaces with 2 component epoxy-polyamide primer
with zinc phosphate and 2 component polyurethane acrylic enamel.
1.1.7. (17) Enamel Painted Steel and Galvanized steel surfaces with synthetic enamel
coats.
1.1.8. (18) Enamel Unpainted Wood Surfaces with alkyd sealant primer and alkyd resin
based synthetic enamel.
1.1.9. (23) Paint Exterior plaster, cement, masonry and other derivative smooth surfaces
with high performance, resistance and coverage power vinyl copolymer based paint.
1.1.10. (36) Paint 10 cm height lettering on concrete surfaces.
1.1.11. (38) Paint 17 cm with traffic lane on asphalt floor surfaces.
1.1.12. (44) Disassemble gutter & downspout joints, prepare joint surfaces, apply new
sealant and reassemble gutter joint.
1.1.13. (48) Clean gutters, downspouts and splashes, readjust and replace deteriorated
anchorage.
1.1.14. (49) Remove broken exposed brick units and replace them with new units.
1.1.15. (50) Remove broken, missing or unadhered ceramic units and replace them with
Page 3 of 70
-- 3 of 70 --
PROJECT QUUG 25-1012
01 11 00 - 2
new units.
1.1.16. (51) Remove unadhered sealing material and backing rods, clean joints and apply
new back rod, primer and sealing material.
1.1.17. (52) Remove unadhered sealing material, clean joints and apply new primer and
sealing material in roof flashing.
1.1.18. (54) Apply waterproofing emulsion for exterior surfaces to parapet, lintels and sill
drips.
1.1.19. (55) Repair cracks on concrete elements as indicated.
1.1.20. (56) Waterproof lintel joints as indicated.
1.1.21. (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms
and carry out the works in a safety manner in accordance with the regulations.
1.1.22. (58) Final cleaning.
1.1.23. (59) Separate, treat, transport and delivery waste from the demolition and repairing
works to authorized dump.
1.2. CLIN 2 Building 231 (Additive item #01)
1.2.1. (01) Removal & reinstallation of cables, accessories & other equipment.
1.2.2. (06) Paint removal.
1.2.3. (12) Clean mildew-covered surfaces by brushing with a fungicide solution and
rinsing with tepid water.
1.2.4. (13) Apply fungicide treatment on exterior plaster and concrete surfaces
1.2.5. (14) Paint Unpainted Steel Surfaces with 2 component epoxy-polyamide primer
with zinc phosphate and 2 component polyurethane acrylic enamel.
1.2.6. (15) Paint Unpainted Galvanized Steel Surfaces with 2 component phosphate and
passivator primer with corrosion inhibitor and 2 component polyurethane acrylic enamel.
1.2.7. (23) Paint Exterior plaster, cement, masonry and other derivative smooth surfaces
with high performance, resistance and coverage power vinyl copolymer based paint.
1.2.8. (36) Paint 10 cm height lettering on concrete surfaces.
1.2.9. (48) Clean gutters, downspouts and splashes, readjust and replace deteriorated
anchorage
1.2.10. (57) Provide the appropriate auxiliary systems, equipment, scaffoldings, platforms
and carry out the works in a safety manner in accordance with the regulations.
1.2.11. (58) Final cleaning.
1.2.12. (59) Separate, treat, transport and delivery waste from the demolition and repairing
works to authorized dump.
1.3. CLIN 3 Building 221 (Additive item #02)
1.3.1. (01) Removal & reinstallation of cables, accessories & other equipment.
1.3.2. (04) Cement mortar removal.
1.3.3. (06) Paint removal.
Page 4 of 70
-- 4 of 70 --
PROJECT QUUG 25-1012
01 11 00 - 3
1.3.4. (08) Cement mortar application.
1.3.5. (11) Clean and disinfect grease and oil-impregnated surfaces with quaternary
ammonium degreaser and rinse with high-pressure hot water.
1.3.6. (12) Clean mildew-covered…