SABER IDIQ Westover Air Reserve Base

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA6606-26-R-0008
NAICS
236220
PSC
Z2JZ
Set-aside
8a Competed
Posted
July 1, 2026
Response due
July 30, 2026
Place of performance
Chicopee, MA

Description

1 WESTOVER AIR RESERVE BASE SABERCONTRACT #: XXXXXXXXXX TASK ORDER #01 STATEMENT OF OBJECTIVE: REPAIR ATCALS, BUILDING 5505 BASE PROJECT: YTPM 25-0005 17 FEBRUARY 2026 -- 1 of 6 -- 2 1. INTRODUCTION: In accordance with the SABER contract, the Government is issuing this Task Order to transition from concept definition to design-build services. The Contractor shall be capable of addressing and interpreting all aspects of Unified Facility Guide Specifications (UFGS) regarding this Task Order. 2. PURPOSE: To design and construct project YTPM 25-0005, Repair ATCALS, Building 5505 at Westover Air Reserve Base. The Contractor is responsible for the incidental design and construction work described in this Statement of Objective. The Task Order proposal process is outlined in the SABER SOW, Section B, Part 2. The design submission requirements are outlined in Section C. 3. DESIGN POLICY AND CRITERIA: The project design shall follow the codes and regulations outlined in the SABER SOW, Section A, Part 2, Subpart 2.6, including but not limited to: • International Building Code (IBC) • International Mechanical Code (IMC) • National Electrical Code (NEC) • UFC 3-501-01 Electrical Engineering • UFC 3-520-01 Interior Electrical Systems • UFC 3-401-01, Mechanical Engineering • UFC 3-530-01, Int./Ext. Lighting & Controls • UFC 3-410-01, HVAC Systems 4. STATEMENT OF OBJECTIVE: The objective of this project is to renovate/repair several features of Bldg. 5505. The areas of concern include: roof replacement, new flooring, new lighting, exterior/interior painting, bathroom fixture replacement, lighting upgrades, installation of two mini-split systems and the replacement of two motorized dampers. Further details shall be listed by division below. The Contractor shall prepare and provide a complete Statement of Work (SOW) and construction documents, consisting of a design analysis and 35% design drawings with technical specifications. The Contractor shall provide all labor, materials, and equipment to install, construct, and complete the work planned in accordance with this Statement of Objective. DIVISION 02 EXISTING CONDITIONS: 2.1. Demo the existing condenser servicing the radio room. 2.2. Demo the electrical disconnect and service to the radio room AHU and condenser. (abandon AHU in ceiling) 2.3. Demo existing hot water heater and associated electrical connections. -- 2 of 6 -- 3 2.4. Demo flooring and cove base in all spaces minus the radio room. -Multiple layers within rooms 1004, 1005, 1009 (asbestos floor tile & mastic) -VCT under carpet in room 1001 to remain 2.5. Demo the membrane roofing system down to the metal deck. 2.6. Demo the mechanical room steel door slab. 2.7. Demo the bathroom exhaust fan, toilet, sink and wet wall to expose plumbing. 2.8. Demo window A/C unit. 2.9. Demo water fountain. 2.10. Demo bathroom electrical outlets, switches and covers. 2.11. Demo gutters and downspouts. 2.12. Demo roof boots and chimney stack. 2.13. Demo ceiling tiles and blanket insulation throughout. 2.14. Demo the electrical baseboard heaters. (3) 2.15. Demo the supply/return grills and associated flex ducts within the radio room. 2.16. Demo the existing generator room exhaust dampers, filters and canopies. (2) 2.17. Demo interior and exterior lighting. (3 exterior) (26 interior) 2.18. Demo the abandoned disconnect switch at front of building and patch wall. 2.19. Terminate all disconnected electrical wires back at the panel and relabel. DIVISION 07 THERMAL & MOISTURE PROTECTION 7.1. Install new blocking, gravel stop, trim and fascia for the roof. 7.2. Install new fully adhered 60 mil white TPO membrane roof with 6-inch insulation board. 7.3. Install new aluminum gutters and downspouts 7.4. Replace all vent/chimney boots. DIVISION 08 OPENINGS 8.1. Install replacement windows in the radio room. (2) Windows to be 2’-0” x 3’-0” commercial grade aluminum, single-hung with insulating glass and bronze finish. 8.2. Install a new mechanical room insulated hollow core metal door with hardware. Door to be 3’-0” x 7’-0” x 1-3/4” thick, 18ga. commercial steel, flush, full panel, hollow core, hollow metal with baked enamel finish. Door closer operator, surface mounted, medium duty with regular arm. Door hardware to be lockset, heavy duty, cylindrical, with sectional trim, keyed with single cylinder function. 8.3. Install a new bronze aluminum square tube canopy at the entrance to the main administrative area. Two full height side wall panels with an opening to the front of 1/2 the width to restrict weather. (walls to be tinted vision panels and anchored to existing concrete pad) -- 3 of 6 -- 4 DIVISION 09 FINISHES 9.1. Prep and paint the existing intake hood for the generator. 9.2. Prep and paint exterior doors, frames, and walls. (patch as required) 9.3. Prep and paint all interior doors and frames. 9.4. Patch/prep and paint all interior walls except for the mech room, generator room, and radio room. 9.5. Provide (2) finish and (1) primer coats for exterior / interior walls, doors, frames and ceilings. 9.6. Install new 32oz carpet tile and 4” vinyl cove base in room 1001 over the existing VCT. Carpet tile to be neutral multi-colored tones/patterned/solid colors or earth tones. 9.7. Install VCT flooring and vinyl cove base in the break room, admin and bathroom space. (adjacent to the mechanical room) VCT Flooring to be marbleized, 12" x 12" x 1/8". 9.8. Install new ceiling tiles within existing grid system throughout building. (leave grid areas with wire penetrations open within the radio room) Suspended acoustic ceiling tiles to be white mineral fiber tile, lay-in, fine texture, 2' x 2' or 2' x 4', 5/8" thick. 9.9. Provide new metal transition strips as required between rooms. 9.10. Install/finish new moisture rated gypsum wall board on the wet wall of the restroom. 9.11. Install vanity with sink and faucet. Vanity base to be wood, 30” h x 21” d x 24” w, with 2 doors. Colors to be natural or amber with satin fi

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)