SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD
TRANSPORTATION, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
6982AF26B000008
NAICS
237310
PSC
Y1LB
Set-aside
No Set aside used
Posted
June 10, 2026
Response due
June 16, 2026
Place of performance
SD
What this opportunity is
The Department of Transportation is soliciting bids for the rehabilitation of Madison WMD HQ Road in South Dakota, under NAICS code 237310, which pertains to highway construction. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare and submit bids for consideration.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STANDARD
SPECIFICATIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY
PROJECTS
FP-24
U.S. Department
of Transportation
Federal Highway
Administration
Federal Lands
Highway
-- 1 of 902 --
Standard Specifications
for Construction of
Roads and Bridges on
Federal Highway Projects
FP-24
UNITED STATES DEPARTMENT
OF TRANSPORTATION
Federal Highway Administration
-- 2 of 902 --
-- 3 of 902 --
-- 4 of 902 --
i
PREFACE
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects
are issued primarily for constructing roads and bridges on Federal Highway projects under the direct
administration of the Federal Highway Administration. These specifications are cited as "FP-24"
indicating "Federal Project" Standard Specifications issued in 2024.
When designated in a contract, the FP-24 becomes part of the contract and binding upon all parties to the
contract. Construction contracts of the Federal Highway Administration are also governed by the
following regulations:
• Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and
• Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.
The FAR and TAR regulations are not included in the FP-24. A complete copy of the FAR is available
from the Superintendent of Documents, Congressional Sales Office, U.S. Government Publishing Office,
Washington, DC 20402.
U.S. Customary units of measure are used in the FP-24. The references to Metric or Metric units apply
only where standardized testing requires Metric units of measure.
-- 5 of 902 --
ii
METRIC TO U.S. CUSTOMARY CONVERSION FACTORS (approximate)
Symbol When You Know Multiply By To Find Symbol
LENGTH
μm micrometers 3.9 × 10 -5 inches in
mm millimeters 0.039 inches in
m meters 3.28 feet ft
m meters 1.09 yards yd
km kilometers 0.621 miles mi
AREA
mm 2 square millimeters 0.0016 square inches in 2
m 2 square meters 10.764 square feet ft2
m 2 square meters 1.195 square yards yd 2
ha hectares 2.47 acres ac
km 2 square kilometers 0.386 square miles mi2
VOLUME
mL milliliters 0.034 fluid ounces fl oz
L liters 0.264 gallons gal
m 3 cubic meters 35.31 cubic feet ft3
m 3 cubic meters 1.308 cubic yards yd 3
MASS
g grams 0.035 ounces oz
kg kilograms 2.2046 pounds lb
Mg megagrams 1.1023 short tons T
(or "t") (or "metric ton") (2000 lb)
TEMPERATURE (exact)
°C Celsius
temperature
1.8C +32 Fahrenheit
temperature
°F
ILLUMINATION
lx lux 0.0929 foot-candles fc
cd/m 2 candela/m 2 0.2919 foot-Lamberts fl
MISCELLANEOUS
J joule 0.7376 foot·poundforce ft·lbf
N newtons 0.225 poundforce lbf
kPa kilopascals 0.145 Poundforce
per square inch
lbf/in 2
-- 6 of 902 --
iii
Table of Contents
DIVISION 100 GENERAL REQUIREMENTS ..................................................................................1
Section 101. — TERMS, FORMAT, AND DEFINITIONS .................................................................2
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT ............................................12
Section 103. — SCOPE OF WORK ....................................................................................................14
Section 104. — CONTROL OF WORK .............................................................................................16
Section 105. — CONTROL OF MATERIAL .....................................................................................26
Section 106. — ACCEPTANCE OF WORK ......................................................................................29
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ......................40
Section 108. — PROSECUTION AND PROGRESS .........................................................................45
Section 109. — MEASUREMENT AND PAYMENT .......................................................................48
DIVISION 150 PROJECT REQUIREMENTS .................................................................................60
Section 151. — MOBILIZATION ......................................................................................................61
Section 152. — CONSTRUCTION SURVEY AND STAKING .......................................................62
Section 153. — CONTRACTOR QUALITY CONTROL ..................................................................69
Section 154. — CONTRACTOR SAMPLING AND TESTING ........................................................73
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS ...........................................75
Section 156. — PUBLIC TRAFFIC ....................................................................................................84
Section 157. — SOIL EROSION AND SEDIMENT CONTROL......................................................88
Section 158. — WATERING FOR DUST CONTROL ......................................................................93
DIVISION 200 EARTHWORK ...........................................................................................................94
Section 201. — CLEARING AND GRUBBING ................................................................................95
Section 202. — ADDITIONAL CLEARING AND GRUBBING ......................................................97
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS ......................................98
Section 204. — EXCAVATION AND EMBANKMENT ................................................................102
Section 205. — ROCK BLASTING..................................................................................................113
Section 206. — RESERVED .............................................................................................................122
Section 207. — EARTHWORK GEOSYNTHETICS ......................................................................123
Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237310)
HUM MALSR Demo and Replacement
TRANSPORTATION, DEPARTMENT OF · Solicitation · due July 10, 2026
Repair and Widen Taxiways Phase III, PSTE 162013
DEPT OF DEFENSE · Solicitation · due June 25, 2026
Repair Carswell Ave.
DEPT OF DEFENSE · Solicitation · due July 17, 2026
WA NP MORA 11(1), Fryingpan Creek Bridge
TRANSPORTATION, DEPARTMENT OF · Solicitation · due July 1, 2026
Fort Sam Houston National Cemetery, Phase 3 Expansion - Additional Road Repairs
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 30, 2026
Y--GOGA 244458 & FOPO 186401 Construct Bike Path at W
INTERIOR, DEPARTMENT OF THE · Solicitation · due July 17, 2026