Sequoia National Forest Toilet Installation Project
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
127EAU26Q0064
NAICS
327390
PSC
5410
Posted
June 30, 2026
Response due
July 16, 2026
Place of performance
Dunlap, CA
Description
1
US Department of Agriculture (USDA)
Statement of Work
-- 1 of 5 --
2
Contents
Project ........................................................................................................................................................................................................ 3
General Information .................................................................................................................................................................................. 3
1.0 Scope of Work .................................................................................................................................................................................. 3
2.0 Background ...................................................................................................................................................................................... 3
Contractor Requirements .......................................................................................................................................................................... 3
3.0 Technical Requirements / Tasks....................................................................................................................................................... 3
4.0 Government Furnished .................................................................................................................................................................... 4
5.0 Deliverables / Schedule .................................................................................................................................................................... 4
6.0 Travel ............................................................................................................................................................................................... 4
7.0 Contractor’s Key Personnel .............................................................................................................................................................. 4
8.0 Security Requirements ..................................................................................................................................................................... 5
9.0 Data Rights ....................................................................................................................................................................................... 5
10.0 Section 508 – Electronic and Information Technology Standards ................................................................................................. 5
Attachment ............................................................................................................................................................................................ 5
-- 2 of 5 --
3
Project
2026 SEQUOIA NATIONAL FOREST TOILET INSTALLATION PROJECT
General Information
1.0 Scope of Work
This project involves the removal and replacement of twenty-six (26) pre-cast concrete vault toilet buildings and also the
removal of five (5) vault toilet buildings without replacement. The work consists of prefabrication, on-site delivery, off-
loading, placement, assembly, and complete installation of new precast concrete vault toilets. Site work and earthwork is
included for the installation of new toilets. When removing old vault toilets, Contractor shall pump out, clean, and remove
the existing vault and toilet; and minimize over excavation and damage to adjacent improvements and vegetation. The
new toilet shall be installed in the location of the existing toilet after removal, or as shown on the plans. The new toilet
shall be installed in the approximate location of the old toilet, as approved by the government on site.
2.0 Background
Sequoia National Forest would like to maintain safe toilet building conditions for the public and employees through the
forest. This work is essential to the recreational and public health and safety aspects of the mission. The vault toilet
buildings being replaced are old vault toilets that have exceeded their life expectancy. The vault toilets being replaced
are much harder to keep sanitary and safe for the public than the new concrete style vault toilets we are replacing them
with. The newer concrete vault toilets are much more resistant to fire than the older vault toilets. Some vault toilet
locations are also being moved to more appropriate spots for the current conditions of the respected campground or
trail head.
Contractor Requirements
3.0 Technical Requirements / Tasks
The Contractor shall provide all management, labor, tools, parts, materials, and equipment necessary to meet the
requirements and specific tasks under this contract and to provide required services.
A. Delivery of twenty-six (26) new vault toilet buildings.
1. The Contractor shall transport the toilet buildings and vaults from the manufacturing plant to the
following sites:
a) Fir Campground:) Two (2) double vault toilet buildings, Installed at one site back-to-back.
b) Cove Campground: One (1) double vault toilet building, Installed at one site.
c) Rowell Meadow Wilderness Trailhead: One (1) Single vault toilet building.
d) Big Meadows Wilderness Trailhead: One (1) double vault toilet building with chase, Installed
at one site.
e) Sandy Cove Day Use Site: Two (2) double vault toilet building with chase, Installed at one site
back-to-back.
f) Quail Flat: Two (2) double vault toilet building with chase, Installed at one site back-to-back.
g) Big Meadows Winter Trailhead: Two (2) double vault toilet building with chase, Installed at
one site back-to-back.
h) Mill Flat Campground: Two (2) Single vault toilet building.
i) Green Cabin Flat Campground: One (1) double vault toilet building with chase.
j) Camp 4 Campground: One (1) Single vault toilet building.
k) Wishon Campground: Two (2) double vault toilet buildings, Installed at two separate sites.
l) Quaking Aspen Campground:…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 327390)
Precast Concrete Moment Frame Assemblies for Structural Testing at the NFRL
COMMERCE, DEPARTMENT OF · Solicitation · due July 23, 2026
Precast Concrete Moment Frame Assemblies for Structural Testing at the NFRL
COMMERCE, DEPARTMENT OF · Solicitation · due July 23, 2026
MLRS Proof Load Pods
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026
Concrete and Aggregates Master BPA
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 20, 2026