Stuttgart Tree Database services
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W91WFU26QA010
NAICS
541620
PSC
F999
Set-aside
No Set aside used
Posted
July 14, 2026
Response due
July 15, 2026
Place of performance
Stuttgart, DE-BW
What this opportunity is
The Department of Defense is buying tree control and database support services for the USAG Stuttgart in Germany, which suits any business due to no set-aside being used. The services include yearly visual tree control, updating the existing tree data system, and preparation of lists and plans for tree cutting and pruning. As this is a solicitation notice, businesses should track the opportunity to prepare for a potential bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
TREE CONTROL & DATABASE SUPPORT
PERFORMANCE WORK STATEMENT
(PWS)
UNITED STATES ARMY GARRISON
(USAG) STUTTGART, GERMANY
10.06.2026
-- 1 of 32 --
Page 2 of 32
409 th CSB Ver 6 20200319
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s)
are not subject, either by the contract’s terms or by the manner of its administration, to the supervision
and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide tree
control and survey as well as maintenance and updating the USAG-Stuttgart GIS Tree Data System.
1.2 Background: These services are needed as German law requires inspection and maintenance of
all trees on all installations throughout Germany.
1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide all
personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items
necessary to perform services as described in the PWS and associated contract documents. The
Contractor shall perform to the standards and acceptable quality levels identified in this PWS and
associated contract documents.
1.4 Objectives:
Yearly visual tree control, more detailed examinations of trees if necessary, drilling examinations,
etc.
Updating of the existing tree data system (GIS) as needed.
Preparation of lists and plans of the trees to be cut down as well as lists and plans of the trees in
need of tree pruning measures based on the yearly inspection of the trees.
1.5 General Information:
1.5.1 Unscheduled Inspections: The Government may inspect the Contractor’s performance at any
time without notification of the Contractor.
1.5.1.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure
services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement
procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP
is how it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the
Contracting Officer’s Representative (COR) for review within thirty (30) calendar days after date of
contract award (Deliverable 001R001).
The Government will review and either notify the Contractor in writing of acceptance of the plan or return
their comments to the Contractor within ten (10) calendar days. If the Government has provided
comments, the Contractor shall then have three (3) calendar days to submit a Final QCP. After receipt
of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any
proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting
Officer no later than fifteen (15) calendar days prior to the anticipated change and before implementation
by the Contractor. The timeline noted above will apply for review and acceptance of proposed changes.
At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications,
duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
b. How will the Contractor monitor work to ensure that performance complies with all deliverables
(etc. timelines, deadlines, and goals)?
-- 2 of 32 --
Page 3 of 32
409 th CSB Ver 6 20200319
c. How will the Contractor monitor work to ensure that performance complies with all specifications
and requirements of the contract, including clauses?
d. How will the Contractor monitor and ensure staff qualifications remain current and valid
including DOCPER processes/approvals throughout contract performance?
e. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.7 Key
Control)?
f. How will the Contractor inventory and track maintenance of all Government Provided Equipment
/ Materials?
g. How will the Contractor identify, investigate, and correct any non-conforming performance and
prevent similar deficiencies in the future?
h. How will the Contractor file and save all Quality Control related documents for the life of the
contract plus 5 years?
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the
performance within three (3) hours of identifying those issues. Verbal reports shall be followed by written
reports within four (4) calendar days.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this
contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily
focused on what the Government must do to ensure that the Contractor has performed in accordance
with the performance standards. It defines how the performance standards will be applied, the frequency
of surveillance, and the acceptable quality levels (performance thresholds).
1.5.2.1 Recognized Holidays: The following provides information on recognized holidays for the
purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall
on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work can be performed on U.S. holidays occurring during the normal workweek
unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a
Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. The
contractor is not required to perform services on holidays.
New Year’s Day January 1 st M. L. King Memorial Day 3 rd Monday in January
Presidents’ Day 3 rd Monday in February Memorial Day last Monday in May
Independence Day July 4 th Labor Day 1st Monday in September
Columbus Day 2 nd Monday in Oct…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 541620)
Environmental, Health and Safety (EHS) Services
STATE, DEPARTMENT OF · Solicitation · due August 3, 2026
PROJECT VA GWMP CLI-CULTURAL RESOURCE SURVEY
TRANSPORTATION, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 11, 2026
Confined Space Assessment - Beltsville MD
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 4, 2026
Post-Construction National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP) Compliance Services
TRANSPORTATION, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
B533--Legionella and Dental Water Line Sampling
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation · due July 29, 2026
H999--(ACM) Renovate 111 Audiology 5BN, Clement J. Zablocki VAMC, Milwaukee, WI Project# 695-22-117
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due July 29, 2026