Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1240LT26Q0156
NAICS
237310
PSC
Y1LB
Set-aside
Small Business Set Aside - Total
Posted
August 25, 2026
Response due
September 10, 2026
Place of performance
Cedaredge, CO
Description
1
US Department of Agriculture (USDA)
Statement of Work
Trickel Park Road Asphalt
Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
July 20, 2026
-- 1 of 5 --
2
Contents
Project ................................................................................................................................................... 3
General Information .............................................................................................................................. 3
1.0 Scope of Work ............................................................................................................................. 3
2.0 Background .................................................................................................................................. 3
Contractor Requirements ...................................................................................................................... 3
3.0 Technical Requirements / Tasks .................................................................................................. 3
4.0 Government Furnished ................................................................................................................ 4
5.0 Deliverables / Schedule ............................................................................................................... 4
6.0 Travel ........................................................................................................................................... 5
7.0 Contractor’s Key Personnel ......................................................................................................... 5
8.0 Security Requirements ................................................................................................................. 5
9.0 Data Rights .................................................................................................................................. 5
10.0 Section 508 – Electronic and Information Technology Standards .............................................. 5
Attachments ....................................................................................................................................... 5
-- 2 of 5 --
3
Project
Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
General Information
1.0 Scope of Work
Project consists of road rehabilitation including asphalt concrete pavement, subgrade improvement,
and culvert installations. Refer to FP-14, the Forest Service Supplemental Specifications (FSSS) and
the engineering map and plans for technical requirements and tasks.
Work activities and roads are specified in the Map and plans, FP-14, Forest Service Supplemental
Specifications (FSSS) and Schedule of Items.
Project Location
The nearest town to the project location is Cedaredge, CO.
Directions from the Grand Mesa, Uncompahgre, and Gunnison (GMUG) National Forests (NF),
Supervisors’ Office, 2250 South Main, Delta, Colorado.
Travel north on Highway 50 for 2.3 miles. Turn east onto Highway 92 E. Travel east for 3.8 miles to
the intersection with Highway 65 N. Turn north onto Highway 65 N. Travel north for 26.8 miles. Turn
east onto National Forest System Road (NFSR 121) Trickel Park (the Grand Mesa Visitors Center is
adjacent to the Trickel Park Road). Drive to the beginning of the project. Project begins at the end of
the existing asphalt.
Station 251+94, Latitude: 39.044872°, Longitude: -107.946735°
2.0 Background
Refer to General Information section 1.0 Scope of Work for the general description of the
requirement.
Contractor Requirements
3.0 Technical Requirements / Tasks
Technical requirements and tasks for this project include the following.
1) Construction Surveying and Staking
2) Contractor Sampling and Testing
3) Soil Erosion and Sediment Control
4) Watering for Dust Control
5) Clearing and Grubbing
6) Removal of Structures and Obstructions
7) Excavation and Embankment
8) Structure Excavation and backfill
9) Installation of Riprap
10) Placement of Minor Crushed Aggregate
11) Construction of Asphalt Concrete Pavement
12) Installation of Fog Seal
13) Asphalt Prime Coat and Blotter
14) Installation of Concrete Headwalls for Pipe Culverts
15) Installation of Pipe Culverts
-- 3 of 5 --
4
16) Installation of Pipe Culvert End Sections
17) Temporary Traffic Control
Information for this project resides within the Map and Plans, FP-14, Forest Service Supplemental
Specifications, and Schedule of Items. The contractor will be required to provide a construction
schedule (GANTT chart or other acceptable schedule) to ensure technical expertise and
understanding of specified work to meet the technical requirements of the project.
4.0 Government Furnished
There is no Government-Furnished Property for this project.
All material sources shall be contractor-located sources and shall be sources off of National Forest
System (NFS) lands.
5.0 Deliverables / Schedule
Key Deliverables
Item
No.
Deliverable /
Item Title
Description Frequency Delivery Format Due
1 Project Plan Define the
responsibilities and
timeline of the
contract technical
requirements and
tasks.
Once Via email to the
Contracting
Officer (CO) and
the Contracting
Officers
Representative
(COR)
No later than five
(5) business days
after contract award
2 Updated
schedule
and timeline
Revised timeline of
the contract tasks
Once per
month
Via email to the
CO and COR
No later than the
end of the first
week of each
month during the
entirety of the
project
1 Weekly
Status
Report
Weekly status
report documenting
tasks and issues
identified during the
week
Once per
week
TEAMS meeting
with the CO and
COR
Once a week. 30-
60 minutes total
meeting time.
2 Sampling
and Testing
Sampling and
Testing of materials
Refer to the
Specifications
Report provided
by Geotechnical
Engineer Firm to
the CO and COR
Refer to the
Specifications
3 Monthly
Invoice
Invoice for review
and approval
Once per
month
Via email to CO
and COR before
submittal to
Invo…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237310)
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
TRANSPORTATION, DEPARTMENT OF · Presolicitation · due September 10, 2026
Replace Foundation Concrete and Anchor Bolts, BAK-12 System
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 8, 2026
Airfield Repair Sources Sought
DEPT OF DEFENSE · Sources Sought · due August 30, 2026
Repair and Widen Taxiways Phase III, PSTE 162013
DEPT OF DEFENSE · Award Notice
Repairs to Base Roads and Parkings, 156th WG Muñiz ANGB
DEPT OF DEFENSE · Solicitation · due September 8, 2026
Asphalt Resurfacing Work
STATE, DEPARTMENT OF · Solicitation · due September 15, 2026