UMSB Suite 304 Renovation

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
W912HQ26S0042
NAICS
238290
PSC
M1EB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 15, 2026
Response due
July 10, 2026
Place of performance
VA

What this opportunity is

The Department of Defense is seeking a contractor to renovate Suite 304 at the USACE Mission Support Battalion in Alexandria, VA, focusing on surface preparation, painting, and ceiling tile replacement. This opportunity is set aside for total small businesses under NAICS 238290, which suits contractors specializing in construction and renovation services. As this is a Sources Sought notice, interested businesses should track the opportunity for potential bidding rather than submitting proposals at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Statement of Work (SOW) Customer Funded Renovate Suite 304 USACE Mission Support Battalion Alexandria, VA 22315 PR&C # W802Y961357505 A. General Overview This document outlines the scope of work to perform surface preparation, paint applications on walls and door frames, 2x2 LED dimmable lights and the complete replacement of ceiling tiles and grid systems at Bldg.2592 CUDE Suite 304 located on USACE Mission Support Battalion. The project is to be executed in a professional manner, adhering to the highest industry standards, with a focus on environmental responsibility and compliance with Unified Facilities Guide Specifications (UFGS). A.1 All work shall be performed during normal working hours while allowing the personnel in the facility the flexibility to maintain operations during project. A.2 See below for required work actions. Technical point of contact for questions or project visit (recommended) is Rodney Roberts, 703-428-6644, room G3 in building 2593. The period of performance shall not exceed 120 days from date of award. A site visit is available for pricing of work to be performed. B. Performance of Work The Contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to perform surface preparation, paint application on walls and door frames, 2x2 LED dimmable lights, and the complete replacement of ceiling tiles and grid systems: 2.1. Ceiling Tile and Grid System • Removal: Carefully remove existing acoustical ceiling tiles (ACT) and suspension grid system. • Disposal: Remove all debris from site and dispose of in accordance with local regulations. • Installation: Supply and install new 2x2 suspended ceiling grid and new High NRC Square Lay-in (min. NRC 80) tiles. • Finishing: Ensure all tiles are aligned, level, and that perimeter trim (wall angle) is secured properly. 2.2. Wall Painting • Preparation: Clean all surfaces, remove nails/screws, patch wall damage, and apply filler to drywall imperfections. Sand surfaces smooth for a professional finish. -- 1 of 8 -- • Protection: Mask off flooring, fixtures, windows, and newly installed ceiling grid before painting. • Painting: Apply one (1) coat of primer and two (2) finish coats of paint to all designated wall surfaces. • Paint Quality: Level 4 drywall finish. 2.3. Door Frames and Trim Painting • Preparation: Sand all metal door frames to remove rust or rough spots. Clean frames thoroughly. • Painting: Apply 2 coats of Semi-Gloss paint to all door frames, door stops and associated trim. • Hardware Protection: Remove or professionally mask all door hardware (handles, hinges, closers) to prevent paint splatters. 3. Materials and Colors • Walls: SW7050-Eggshell • Door Frames: Bronze Semi-Gloss • Ceiling Tiles: 2X2 • Grid: White 4. Lights • Remove and install new 2x2 dimmable LED lights 4000 lumens (plenum rated). • Contractor will install new 2x2 supply diffuser (white). 5.Contractor Responsibilities • Cleanliness: Maintain a clean, safe, and organized workspace daily. • Surfaces: Take necessary precautions to protect floors, permanent fixtures, and cabinetry not within the scope of painting. • Debris: Contractor is responsible for all debris removal off-site; on-site dumpsters are not to be used unless authorized. 5. Acceptance Criteria • Inspection: A final walk-through will be conducted with the client. -- 2 of 8 -- • Finished Appearance: All paint must be uniform in color and sheen, with no visible streaks, holidays, or bleed-through of previous colors. • Components: All ceiling tiles must be properly seated, and door frames must be clean of paint runs or spills. C. General Security Requirements C.1. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by the HECSA Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at this facility change, the Government may require changes in contractor security matters or processes. C.2. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. C.3. The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the employee candidate has two valid forms of government issued identification prior to enrollment to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible employee candidates must be provided to the COR no later than 3 business days after the initial contract award. C.4 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. D. Security Requirements: D.1 All contractor and all associated sub-contractors employees shall c

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238290)