UPPER GEAR BOX STBD
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
N0010426QTA56
NAICS
333612
PSC
3020
Posted
June 16, 2026
Response due
June 16, 2026
What this opportunity is
The Department of Defense is soliciting for the repair of an upper gear box, classified under NAICS 333612 and PSC 3020. This opportunity is suitable for small businesses that can meet the required Repair Turnaround Time (RTAT) of 142 days and comply with Government Source Inspection (GSI) requirements. Interested vendors should note that this is a fixed-price solicitation and that quotes must include unit price, total price, and RTAT, with the solicitation closing on June 16, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|noah.r.kuntz2.civ@us.navy.mil|
VALUE ENGINEERING (JUN 2020)|3||||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||
EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS-BASIC(NOV 2014))|4|||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||
OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS.|
OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13||||||||||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
The purpose of this amendment is to extend the solicitation close date to 16 JUNE 2026 and incoporate mandatory clause changes persuant to the Revolutionary FAR Overhaul.
This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF).
Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 142 Days.
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information:
QUOTE AMOUNT AND RTAT
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this
contract.
Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
Return Material Authorization # (RMA), if applicable:__________
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to
exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________.
AWARDEE INFO & PERFORMANCE LOCATION
o Awardee CAGE: __________
Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:__________
New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the
option by written notice to the Contractor within the number of days in FAR 52.217-7 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a
price reduction is required due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section
shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default.
In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________.
\
1. SCOPE
1.1 This contract/purchas…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 333612)
30--CHAIN,CABLE
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 25, 2026
66--GEAR ASSEMBLY
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 25, 2026
ACTUATOR, ELECTROME
DEPT OF DEFENSE · Solicitation · due July 17, 2026
LOWER GEARBOX,PORT
DEPT OF DEFENSE · Solicitation · due June 16, 2026