USCGC HUDSON (WLIC 801)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Erik C Elasik
(Rev-0, 15 October 2025)
-- 1 of 11 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
38 (Rev-0)
57300_XdckWnchInspctSrvc_ACC_0121_IBCT
REC_57300_XdckWnch_IBCT_160 WLIC (ALL) (1014)
WORK ITEM 8: Crossdeck Winch, Inspect & Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the Utility
Air Winch Model HU-40 Series.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air
Winch Model HU-40 Series
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020,
General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020,
Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
-- 2 of 11 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
39 (Rev-0)
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance
with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.2 Renewal task particulars. The Contractor must perform the tasks designated in Table 1 below, in
accordance with SFLC Std Spec 5000:
TABLE 1 – REQUIRED TASKS
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM SFLC
STD SPEC
5000
OTHER
1 Operate and
Inspect
6 3.2.1 (Operate
and Inspect)
D2.1 (Fastener
assemblies)
D2.1 (Fastener
assemblies)
Submit CFR.
2 NDE and
Preserve
6 Winch
Foundation
3.2.4
(Preservation)
3.2.5 (NDE)
1. Finish coat color: black (17038).
2. Areas to NDE:
…- All weld joints connecting winch
foundations to the deck
…- Winch feet
3. Submit CFR.
3 Renew 6 Wire Rope
Assembly
D2.2 (Wire
Rope
Assemblies)
Wire rope particulars:
Each set is as follows:
- Nominal diameter: 5/8 inch.
- Nominal strength: 6x37 XXIPS IWRC
RRL
- Length of rope required: 150 ft per
assembly
- End fitting type: Poured spelter or fiege
4 Groom and
Lubricate
6 Winch 3.2.6 (Groom
and lubricate)
5 Final
Operational
Test
6 Winch B2.3 (Winches) Verify that winch and sheaves rotate
freely and with no unusual noise or
binding.
Submit CFR.
6 Fabricate and
Install
6 Label Plate B2.9 (Label
plates)
4. NOTES
This section is not applicable to this work item.
-- 3 of 11 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
40 (Rev-0)
58210_ANK_0515_IBCT
REC_58210_Cpstn_IBCT_160 WLIC (ALL) (0323)
WORK ITEM 9: Capstan, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and repair the Jered
LLC Air Driven Warping Capstan, Model X-1503, located on the Fantail.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4417, SWBS 582, Section A, Jan 2011, Warping
Capstan
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014,
General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014,
Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in Table 1:
• Task #1.
• Task #2.
• Task #3.
• Task #4.
-- 4 of 11 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
41 (Rev-0)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to
seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the
work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-
listed:
• Tow bitt.
• .
3.2 Recurring Maintenance Requirements. The Contractor shall perform the tasks designated in Table 1
below.
TABLE 1 – RECURRING MAINTENANCE REQUIREMENTS
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
5000
OTHER
1 Operate and
Inspect 1 Warping Capstan
Assembly
3.2.1 (Operate and
Inspect)
Appendix A
Submit a CIR.
2
Disassemble,
Inspect, and
Preserve
1 Warping Capstan head
shaft assembly
3.2.3 (Disassemble
and inspect)
3.2.4 (Preservation)
Submit a CIR.
3
Disassemble,
Inspect, and
Preserve
1 Air Motor Assembly and
Associated Shaft Coupling
3.2.3 (Disassemble
and inspect)
3.2.4 (Preservation)
Refer to «TP»
Submit a CIR.
4 Disassemble
and Inspect 1 Pnuematic brake
D2.3 (Brakes and
clutches)
Submit a CIR.
5 Disassemble,
Inspect, and
Preserve
1 Control Valve C2.4 (Valves and
manifolds)
3.2.4 (Preservation)
Submit CFR.
6 Service and
Inspect 1 Gear reducer D2.4 (Open gearing
and gear reducers)
Submit CFR.
7 Preserve and
NDE 1 Warping Capstan assembly
and foundation
3.2.4 (Preservation)
3.2.5 (NDE)
Submit CFR.
8 Renew All Foundation and soft patch
gaskets
9 Renew 2 Pneumatic hose assembly See «TP».
-- 5 of 11 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
42 (Rev-0)
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA.
REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
5000
O…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 336611)
Dock-side (DS): USCGC WAESCHE FY27 Quarter 2 Repair
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 27, 2026
FDNF-Japan CVN Repair, Maintenance, Modernization, and Overhaul - CEILING INCREASE
DEPT OF DEFENSE · Justification
Landing craft rehabilitation, Lake Roosevelt NRA.
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 19, 2026
CGC BISCAYNE BAY DOCKSIDE REPAIRS
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 25, 2026