What this opportunity is
The Department of Defense is seeking a contractor to design, fabricate, and install a mural display for USNORTHCOM in the Pentagon, specifically in a high-visibility corridor. This opportunity is a Total Small Business Set-Aside, making it suitable for small businesses with capabilities in graphic design and installation. Interested vendors should note that this is a solicitation notice, indicating the need to prepare bids rather than simply track the opportunity. The project has a performance period of 120 days post-award and requires adherence to specific design and installation standards.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
ST AT EMENT OF WORK (SOW)
Project T itle: USNORT HCOM Pentagon Corridor Dis play
1.0 Background
T he NORAD & USNORTHCOM (N&NC) Was hington Operations Center (WOC) requires
the des ign, fabrication, and ins tallation of a new legacy mural dis play. T his dis play will
be located in a corridor at the Pentagon, Was hington D.C., and is intended to match the
artis tic quality and s tyle of exis ting dis plays in the Combatant Command legacy
corridor.
2.0 Scope of Work
T he contractor s hall provide all neces s ary pers onnel, labor, materials , tools , equipment,
and s upervis ion required to des ign, fabricate, and ins tall a cus tom mural dis play in
accordance with the s pecifications outlined in this SOW.
3.0 Specific T as ks
• 3.1. Des ign: T he contractor s hall work directly with the government's des ignated
repres entatives from the U.S. Northern Command's Public Affairs (PA) and
His torian teams to develop the final artis tic content and des ign of the mural.
• T he NORAD & USNORTHCOM Was hington Operations Office is available to
facilitate video teleconferencing communications with NORAD & USNORT HCOM
Headquarters in Colorado Springs , Colorado, and can help coordinate activities
with the Fire Mars hall's office, Corridor Committee and other organizations as
required.
• T he des ign s hould be bas ed on s pecifications developed in the ins tallation of a
s imilar dis play in this corridor. For pricing and planning purpos es , the following
data points may be us ed:
a) Des ign, detail, produce s tructure and graphics , trans port and ins tall
one U.S. Northern Command Pentagon dis play, s imilar to the exis ting
USST RAT COM dis play in the s ame corridor.
T he bid price s hould include, but is not limited to:
1. Project management and s ite vis its
2. Des ign and detailing of s tructure and graphics
3. Detail drawings to s ubmit to the Pentagon Corridor
Committee and Fire Mars hal
4. Structure (Approximate Dimens ions ) 12’6” w x 60” h x 3” d.
a. Aluminum extrus ion perimeter framing
b. ¾” thick fire rated back ground panel
-- 1 of 3 --
c. Cleat block mounting to Pentagon walls
5. Graphics
a. 3D acrylic letters , “ U.S. Northern Command”, mounted to the background
image.
Note: Dis play mock-up mus t receive final approval from the Government POC
prior to fabrication.
b) T he contractor s hall furnis h electronic mock-ups for this purpos e. T he
contractor s hall conduct s ite vis its prior to commencement of des ign work to
ens ure the dis play comports with the general appearance of exis ting Combatant
Command dis plays in that corridor. T he dis play s hould cons is t of:
• 3-Dimens ional lettering
• Printed graphic panels
• A metal-framed dis play cas e with s tandoff graphics and object mounts
• Graphics and text panels
• 3.2. Fabrication: Upon receipt of final des ign approval from the government, the
contractor s hall fabricate all components of the mural dis play.
a) Materials s hall be of high quality, durable, and s uitable for a profes s ional
office environment.
b) T he dis play s hall comply with all material and s afety requirements s pecified
by the Pentagon's Corridor Committee and Fire Mars hall.
c) T he contractor s hall communicate with the PA and His torian teams on a bi-
weekly bas is to as s es s progres s , and communicate about des ign concepts ,
changes , and any is s ues that aris e during the des ign proces s .
d) T hes e dis cus s ions s hall be facilitated by the NORAD & USNORT HCOM
Was hington Operations Office in 2A872 whenever pos s ible via Video
T eleconferencing (VT C), or by other means agreed to by the Government and
contractor.
• 3.3. Ins tallation: T he contractor s hall trans port and ins tall the completed mural
dis play at the des ignated location within the Pentagon. Ins tallation s hall include
all mounting, wiring for electrical components (backlighting, if approved), and
final placement of all dis play elements . T he contractor s hall be res pons ible for all
cleanup of the work area upon completion of ins tallation.
4.0 Government-Furnis hed Items /Information
• T he Government will provide the underlying concept for the dis play, and work
with the contractor to develop s pecific des ign elements , and imagery as
appropriate.
• T he Government will provide acces s to the ins tallation s ite.
• T he Government will provide a des ignated Point of Contact (POC) for des ign
approval and coordination.
-- 2 of 3 --
• T he Government will not provide es cort pers onnel for the contractor while on
s ite.
5.0 Location, Security, and Work Hours
• Location: T he work will be performed at the contractor's facility
(des ign/fabrication) and on-s ite at the Pentagon, Arlington, VA, 2nd Floor,
Corridor 8).
• Work Hours : Ins tallation work at the Pentagon mus t be conducted during normal
bus ines s hours , excluding Federal holidays , unles s otherwis e approved by the
Government POC.
• Security & Badging: Contractor pers onnel not already cleared for Pentagon
acces s will require temporary badges and mus t s ubmit pers onal information for
s ecurity s creening at leas t 14 days prior to s ite entry.
6.0 Period of Performance / Deliverables
• Period of Performance: T he Period of Performance s hall be 120 days from the
date of contract award.
• Deliverables :
1. Initial des ign meeting: 10 Days following contract award.
2. Initial digital mock-up: 20 days after contract award.
3. Interim digital mock-up # 1: 30 days after contract award.
4. Interim digital mock-up # 2: 45 days after contract award.
5. Final Des ign Digital Proof for Government Approval: 60 days after award.
6. Completed Fabrication (Ready for ins tall) 90 days after des ign approval
7. Completed Ins tallation: 30 days after fabrication
7.0 Government Point of Contact (POC) / COR
T he POC for this requirement is :
• Name: Mr. J ohn Gibeault
• Office: NORAD & USNORT HCOM Was hington Operations Office (Room 2A872 at
the Pentagon)
• Email: john.m.gibeault.civ@ m…
Source: SAM.gov, as posted. Verify the current solicitation before responding.