STATEMENT OF WORK
FOR
BILLETING BLIND REPLACEMENT
PROJECT LOCATION
Work is to be completed at multiple buildings on Volk Field Air National Guard Base (ANGB), Camp
Douglas, WI 546518-5001.
SCOPE OF WORK
The objective of this project is to provide a full depth replacement of all billeting building blinds on
Volk Field to provide privacy, energy ef�iciency, light control, and glare reduction.
ALUMINUM BLINDS INSTALLATION
Replacement shall include the removal and disposal of existing window treatments and hardware
(if applicable), and the installation of new window treatments that meet the following
speci�ications.
All buildings expect Bldg. 449 and 475
Material(s): 1 inch Aluminum
Color: Bright White
Mounting: Inside mount using standard brackets
Lift Mechanism: Cordless Lift
Tilt Mechanism: Wand tilt
Tilt Position: Left Side
For Building 475
Type: Cellular Shades
Color: Blue Grey and Burgandy
Mounting: Inside
Operating System: Cordless
Operating Pole: No/ None
For Building 449
Type: Easy Clean Roller Shades
Color: Grey
***NOTE: The Blinds for Building 449 kitchen and of�ice areas must be aluminum
white in color blinds.
GENERAL REQUIREMENTS
Contractor is responsible for all labor, materials, and equipment necessary to complete the work,
to include delivery and of�load of necessary supplies and equipment. Any damage to window
frames, interior walls, �loors, or surrounding areas caused by equipment operation, installation, or
material storage shall be repaired to original condition as part of the project.
PRICING & AWARD STRUCTURE:
Pricing shall be submitted for Project Area as outlined below. Each project area will be a separate
Contract Line-Item Number (CLIN) and each will be awarded based on availability of funds at time
of award. Pricing must be valid through 30 September 2026. Any CLINs not funded at time of
-- 1 of 4 --
2
award shall be held available for award through 30 September 2026, in the event additional
funding becomes available.
BASE REQUIREMENT
• Project Area 1: Bldgs. 140-149 (Est. 100 Windows)
OPTIONS
• Project Area 2: Bldg. 449 (Est. 29 Windows)
• Project Area 3: (Est. 28 Windows) Bldg. 475
• Project Area 4: Bldgs. 429, 430, 431, 434, 436, 438, 440, 442, 446, 448 (Est. 184
Windows)
• Project Area 5: Bldgs. 303, 305, 307, 310, 311, 312 & 315 (Est. 106 Windows)
• Project Area 6: Bldgs. 405-413, 417 and 419- 427 (Est. 221 Windows)
• Project Area 7: Bldgs. 125-132 (Est. 152 Windows)
The contractor is responsible for verifying the site conditions and quantities prior to submitting
quotes. The above quantities are estimates. Attendance at scheduled site visit is highly
encouraged.
Installation methods and materials shall be in accordance with standard commercial practices.
VOLK FIELD GENERAL INFORMATION
1. Smoking on Volk Field premises is allowed only in designated areas.
2. Seat belts must be worn, and cell phones may only be used in stationary vehicles and equipment.
Note: You may not talk or text with phones while driving on Volk Field premises.
3. No one will be allowed access without of�icial prior arrangement and representation by a prime
contractor.
4. Individuals are not allowed access to any restricted areas once on base. Access is allowed “Only”
in areas required to conduct the work of this project.
5. All vehicles and persons are subject to search at the discretion of security personnel.
6. Persons interested in viewing the project site shall have a current picture I.D & provide full name
(including full middle name), valid Driver’s License number and date of birth at least three (3)
business workdays prior to scheduled arrival.
7. Volk Field is a secure installation and background checks of contractor employees will be
conducted once a contract has been awarded.
8. Volk Field hours of operation are from 6:30 am to 4:00 pm, Monday-Friday
WORK SCHEDULING
1. Normal base work hours for the Contractor are de�ined as 7:00-4:00 Monday-Friday, excluding
Saturdays, Sundays, and Federal Holidays.
2. If the Contractor desires to work during periods other than above, they must coordinate with the
Volk Field Contracting Of�icer in advance of his intention to work during other periods.
a. If the Contracting Of�icer determines that they are reasonably available, the Contracting
Of�icer may authorize the Contractor to perform work beyond normal duty hours/days.
3. The project work duration is estimated to be approximately 120 calendars days from the date the
contractor is provided Notice to Proceed.
a. Additional coordination will be required after the completion of work to facilitate project
closeout requirements.
-- 2 of 4 --
3
GENERAL CONDITIONS
The contractor shall comply with all applicable local, State and Federal laws and regulations. The
contractor shall provide supervision overseeing all work. The contractor shall �ield verify all site
conditions, quantities, measurements, and requirements. The contractor shall protect and barricade
all work areas to ensure safety. The contractor shall protect all structures, utilities, vegetation,
sidewalks, and vehicles from damage. The contractor shall be responsible to replace any damaged
materials with new materials, at no additional cost to the Government.
DISPOSAL OF MATERIALS AND CLEANUP
The contractor shall not use any Government disposal bins, dumpsters or trash receptacles for any
reason at any time. The contractor shall provide appropriate disposal bins/trash receptacles.
Approval of disposal bins/trash receptacle location(s) shall be coordinated through the customer.
The contractor shall clean up after each work period and dispose of all debris at the close of each
day.
MATERIAL & EQUIPMENT ACCOUNTABILITY
The contractor shall notify the Government prior to delivery of any material or equipment to the
site. The contractor shall ensure someone is available to receive delivered materials and able to
store them safely in an area designated by the Government. Any materials delivered without prior
coordination and with…